Back to bathroom remodel contractors
Build Group Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Aug 2026
- Last 24 months
- 52 permits filed
695 permits since 2000: 448 completed, 30 in progress, 188 never finaled, 29 expired or cancelled.
Of the 188 never-finaled permits, 15 are 3 to 5 years old, 94 are 5 to 10 years old, 79 are over 10 years old. 6 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 12 completed, 1 in progress, 3 never finaled, 2 expired or cancelled. Typically 60 days from filing to permit and 380 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 6, 2025 | In progress issued Nov 2025 | 451 Pacific Av | addition of new enclosed exit stair extending from level b to 2;(n) elevator erviing lvl 1,1m,2,2m,3.construction & assoc demo for the partial reframing of mezz.mod to steel bracing frams and seismic bracing.(n) partitions,elevator shaft, exit stair.new ada baths, lighting & finishes.Details
addition of new enclosed exit stair extending from level b to 2;(n) elevator erviing lvl 1,1m,2,2m,3.construction & assoc demo for the partial reframing of mezz.mod to steel bracing frams and seismic bracing.(n) partitions,elevator shaft, exit stair.new ada baths, lighting & finishes. | $2,100,000 |
| Oct 10, 2024 | Completed final sign-off Nov 2024 | 1 Daniel Burnham Ct | unit #311: remodel of master bathroom- replace vanity cabinets, sink and countertop, fixtures. replace shower walls, glass door and fixtures, replace lights, fan and flooring.Details
unit #311: remodel of master bathroom- replace vanity cabinets, sink and countertop, fixtures. replace shower walls, glass door and fixtures, replace lights, fan and flooring. | $25,000 |
| Jun 4, 2024 | Completed final sign-off May 2025 | 175 Frida Kahlo Wy | cosmetic upgrades of (e) dormitory rooms and private bathroom. voluntary ada upgrade of dormitory restrooms and showers. scope of work to include electrical and plumbing work. mech and sprinkler under separate permit.Details
cosmetic upgrades of (e) dormitory rooms and private bathroom. voluntary ada upgrade of dormitory restrooms and showers. scope of work to include electrical and plumbing work. mech and sprinkler under separate permit. | $25,000 |
| Jun 21, 2022 | Never finaled issued Jun 2022, no final | 175 Phelan Av | interior barrier removal. non-structural interior renovation of 4 existing bay bathrooms. 2 bathrooms to become girl bathrooms. deferred electrical.Details
interior barrier removal. non-structural interior renovation of 4 existing bay bathrooms. 2 bathrooms to become girl bathrooms. deferred electrical. | $100,000 |
| Jun 9, 2020 | Completed final sign-off Oct 2020 | 175 Phelan Av | interior renovation of existing locker roomsand weight room to include new women's locker room, bathrooms, team room, new men's locker rooms. mep under a separate permit.Details
interior renovation of existing locker roomsand weight room to include new women's locker room, bathrooms, team room, new men's locker rooms. mep under a separate permit. | $300,000 |
| Jul 31, 2019 | Completed final sign-off May 2020 | 300 16th St | revision to 201902223642 added a storage room where second bathroom wasDetails
revision to 201902223642 added a storage room where second bathroom was | |
| Oct 19, 2018 | Completed final sign-off Jun 2022 | 568 Funston Av | reconfiguration ground floor & add darkroom, relocate bathroom, create 1 car garage. 1st flr: reconfigure space, remodel kitchen & capture space that was deck & make habitable, create (n) deck & stairs, 2nd flr: remodel master bedroom & master bath vault ceiling, add skylights. ** maher: n/a **Details
reconfiguration ground floor & add darkroom, relocate bathroom, create 1 car garage. 1st flr: reconfigure space, remodel kitchen & capture space that was deck & make habitable, create (n) deck & stairs, 2nd flr: remodel master bedroom & master bath vault ceiling, add skylights. ** maher: n/a ** | $300,000 |
| Mar 29, 2018 | Completed final sign-off Jan 2019 | 325 05th St | revision to 201712116139. update bathroom dimensions and remove toiletry closet, add enclosed office space in lieu of open office conference spaceDetails
revision to 201712116139. update bathroom dimensions and remove toiletry closet, add enclosed office space in lieu of open office conference space | $500 |
| Mar 8, 2018 | Never finaled issued Mar 2018, no final | 2500 Mason St | revision to pa 2017-1116-4128. removal of guest room upgrades, 259 rooms, due to reduction of scope of work. no replacement/widening of (e) toilet room door in all non-accessible guest room bathrooms. reduce ff & e in guest rooms corridor, no change to total number of accessible guest rooms to meetDetails
revision to pa 2017-1116-4128. removal of guest room upgrades, 259 rooms, due to reduction of scope of work. no replacement/widening of (e) toilet room door in all non-accessible guest room bathrooms. reduce ff & e in guest rooms corridor, no change to total number of accessible guest rooms to meet | |
| Nov 27, 2017 | Completed final sign-off Oct 2018 | 325 05th St | 1st flr ti only - new walls, flooring, ceiling, 2 new showers, 2 unisex bathrooms, add bike rack. replace garage doors. add 1 pedestrain door mep under sep permit maher naDetails
1st flr ti only - new walls, flooring, ceiling, 2 new showers, 2 unisex bathrooms, add bike rack. replace garage doors. add 1 pedestrain door mep under sep permit maher na | $100,000 |
| Feb 12, 2015 | Completed final sign-off Dec 2017 | 1100 Market St | to repair fire damage. replace damaged walls + ceilings on guestroom flr w/rated construction. incorporate guestroom bathrooms w/rated doors, replace (e) laundry chutes w/rated (n) chutes and doors. replace damaged wood sub-flr + concrete slab at 2nd fl w/(n) structural steel frame + concrete deck.Details
to repair fire damage. replace damaged walls + ceilings on guestroom flr w/rated construction. incorporate guestroom bathrooms w/rated doors, replace (e) laundry chutes w/rated (n) chutes and doors. replace damaged wood sub-flr + concrete slab at 2nd fl w/(n) structural steel frame + concrete deck. | $100,000 |
| Jan 26, 2015 | Never finaled issued Apr 2015, no final | 166 Geary St | ti for new retail store on 2nd fl, work includes new partitions, fixtures, finishes, mep new bathrooms, no exterior work, new facade under separate permit. fire protection under separte permitDetails
ti for new retail store on 2nd fl, work includes new partitions, fixtures, finishes, mep new bathrooms, no exterior work, new facade under separate permit. fire protection under separte permit | $880,000 |
| Dec 18, 2014 | Completed final sign-off Dec 2017 | 45 Lansing St | new leasing center within existing residential bldg. leasing center consists of 1,443 sq. ft. of open office, conference rooms rception/lounge area, model kitchen and bathroom. (ref app #201009140800s). life safety on separate permits.Details
new leasing center within existing residential bldg. leasing center consists of 1,443 sq. ft. of open office, conference rooms rception/lounge area, model kitchen and bathroom. (ref app #201009140800s). life safety on separate permits. | $100,000 |
| Dec 9, 2014 | Expired or cancelled expired Nov 2023 | 1649 Polk St | remove e non structural partition, doors, millwork, fixtures, add new partitons, doors, remodel bath and kitchen fixtures, appliances only, no plumbing. non functional purposes. replace e with new plumbing fixtures. mech/elec under sep permit. maher not reqDetails
remove e non structural partition, doors, millwork, fixtures, add new partitons, doors, remodel bath and kitchen fixtures, appliances only, no plumbing. non functional purposes. replace e with new plumbing fixtures. mech/elec under sep permit. maher not req | $80,000 |
| Sep 10, 2014 | Completed final sign-off Mar 2016 | 1415 Mission St | interior & non-structural revision to level one floor only uner construction. no changes to height, bulk sq. footage or occupancy classification authorized under approved pa# 2008/10/31/5586 's'. relocate retail, fcc, mail room & provide leasing offices, 1 additional bathroom, workroom & office.Details
interior & non-structural revision to level one floor only uner construction. no changes to height, bulk sq. footage or occupancy classification authorized under approved pa# 2008/10/31/5586 's'. relocate retail, fcc, mail room & provide leasing offices, 1 additional bathroom, workroom & office. | $10,000 |
| Jul 8, 2014 | Completed final sign-off Jun 2016 | 18 Geary St | interior demo of non-bearing partition walls on 1/f & mezzanine floor, removal of 1/f kitchen and bathrooms, electrical and plumbing to be demo and capped, sprinkler to remain operational. demo as per ab-17 all egress and life safety systems to remain operational. maintain fire escape.Details
interior demo of non-bearing partition walls on 1/f & mezzanine floor, removal of 1/f kitchen and bathrooms, electrical and plumbing to be demo and capped, sprinkler to remain operational. demo as per ab-17 all egress and life safety systems to remain operational. maintain fire escape. | $60,000 |
| May 10, 2013 | Completed final sign-off Sep 2017 | 1100 Market St | upgrade of existing guestrooms and bathrooms on the 2nd fl through 7th fl. fire alarm, fire sprinkler and mep under seperate permit.Details
upgrade of existing guestrooms and bathrooms on the 2nd fl through 7th fl. fire alarm, fire sprinkler and mep under seperate permit. | $1,100,000 |
| Dec 20, 2012 | Expired or cancelled expired Nov 2023 | 1649 Polk St | remove extg non structural partitions, doors and millwork. add new partitions, ramps, doors, model bathroom and kitchen with no plumbing. (non functional). mech and elec under seperate permit.Details
remove extg non structural partitions, doors and millwork. add new partitions, ramps, doors, model bathroom and kitchen with no plumbing. (non functional). mech and elec under seperate permit. | $81,000 |