Block 3752, lot 080
325 05th St
- City’s use
- Commercial Office
- Built
- 1957
- Stories
- 3
- Rooms
- 4 bathrooms
- Building
- 7,513 sq ft
- Lot
- 3,675 sq ft
- Zoning
- RSD
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 11, 2018 | Never finaled issued Jun 2018, no final | 325 05th St | Garnett Signs Llc | install of 9 evac signs on the 1st 2nd and 3rd floorsDetails
install of 9 evac signs on the 1st 2nd and 3rd floors | $540 |
| May 25, 2018 | Never finaled issued Jun 2018, no final | 325 05th St | Canning Electric Inc | 2/f: ti build out of existing space on the 2nd floor only, add new lights/lighting title 24 controlsDetails
2/f: ti build out of existing space on the 2nd floor only, add new lights/lighting title 24 controls | $10,000 |
| May 25, 2018 | Never finaled issued Jun 2018, no final | 325 05th St | Canning Electric Inc | 3/f: t.i. build out of existing space on the 3rd fl. only add new lights/lighting title 24 controlsDetails
3/f: t.i. build out of existing space on the 3rd fl. only add new lights/lighting title 24 controls | $10,000 |
| May 25, 2018 | Never finaled issued Jun 2018, no final | 325 05th St | Canning Electric Inc | 1/f: ti build out of existing space on the 1st fl. only add new lights/lighting title 24 controlsDetails
1/f: ti build out of existing space on the 1st fl. only add new lights/lighting title 24 controls | $10,000 |
| May 7, 2018 | Completed final sign-off Jan 2019 | 325 05th St | Build Group Inc. | 3rd fl - revision to pa 2017-1127-4825 add storage closet, remove built in table kitchen, turn conference room into an office, and call out chase per field inspectionDetails
3rd fl - revision to pa 2017-1127-4825 add storage closet, remove built in table kitchen, turn conference room into an office, and call out chase per field inspection | $1,000 |
| May 7, 2018 | Completed final sign-off Jan 2019 | 325 05th St | Build Group Inc. | 1st fl - add 2 hour wall in garage with 90 minute door and add new door from stair 2Details
1st fl - add 2 hour wall in garage with 90 minute door and add new door from stair 2 | $2,000 |
| Apr 10, 2018 | Never finaled issued Dec 2019, no final | 325 05th St | Build Group Inc. | (change of use for 1st flr) convert garage & storage area to office space for bld tenant **maher n/a**Details
(change of use for 1st flr) convert garage & storage area to office space for bld tenant **maher n/a** | $1,000 |
| Apr 9, 2018 | Completed final sign-off Jul 2018 | 325 05th St | Battalion One Fire Protection | install new fire alarm system with control panel, smoke above, pull stations, radio comm. throu out in vacant bldg. ref app#201711274808, 201712116139 &, 201711274825. n/a for maherDetails
install new fire alarm system with control panel, smoke above, pull stations, radio comm. throu out in vacant bldg. ref app#201711274808, 201712116139 &, 201711274825. n/a for maher | $14,000 |
| Mar 29, 2018 | Completed final sign-off Jan 2019 | 325 05th St | Build Group Inc. | revision to 201711274808 1st fl. remove shower, reconfigure interior corridor, add new slab in garage to level floor, add landing and ramp. interior work only. na maherDetails
revision to 201711274808 1st fl. remove shower, reconfigure interior corridor, add new slab in garage to level floor, add landing and ramp. interior work only. na maher | $5,000 |
| Mar 29, 2018 | Completed final sign-off Jan 2019 | 325 05th St | Build Group Inc. | revision to 201712116139. update bathroom dimensions and remove toiletry closet, add enclosed office space in lieu of open office conference spaceDetails
revision to 201712116139. update bathroom dimensions and remove toiletry closet, add enclosed office space in lieu of open office conference space | $500 |
| Mar 16, 2018 | Completed final sign-off Jan 2019 | 325 05th St | J &J Air Conditioning Inc | 1st fl - mechanical plan check for pa 2017-1127-4808 1st floor; n/a maherDetails
1st fl - mechanical plan check for pa 2017-1127-4808 1st floor; n/a maher | $40,000 |
| Mar 16, 2018 | Completed final sign-off Jan 2019 | 325 05th St | J &J Air Conditioning Inc | mechanical plan check for pa 2017-1127-4825 3rd floor. n/a maherDetails
mechanical plan check for pa 2017-1127-4825 3rd floor. n/a maher | $40,000 |
| Mar 16, 2018 | Completed final sign-off Jan 2019 | 325 05th St | J &J Air Conditioning Inc | mechanical plan check for pa 2017-1211-6139 2nd floor; n/a maherDetails
mechanical plan check for pa 2017-1211-6139 2nd floor; n/a maher | $40,000 |
| Dec 11, 2017 | Completed final sign-off Oct 2018 | 325 05th St | Build Group Inc. | 2nd floor: t. i. build out of extg space on the 2nd floor. no new square footage. no change of use. new flooring, walls. mep under seperate permit. n/a for maherDetails
2nd floor: t. i. build out of extg space on the 2nd floor. no new square footage. no change of use. new flooring, walls. mep under seperate permit. n/a for maher | $148,500 |
| Nov 27, 2017 | Completed final sign-off Jan 2019 | 325 05th St | Build Group Inc. | ti buildout existing space on 3rd fl, no new sq footagel. no change of use, new flooring , new non structural walls , mep under sep permit. maher naDetails
ti buildout existing space on 3rd fl, no new sq footagel. no change of use, new flooring , new non structural walls , mep under sep permit. maher na | $100,000 |
| Nov 27, 2017 | Completed final sign-off Oct 2018 | 325 05th St | Build Group Inc. | 1st flr ti only - new walls, flooring, ceiling, 2 new showers, 2 unisex bathrooms, add bike rack. replace garage doors. add 1 pedestrain door mep under sep permit maher naDetails
1st flr ti only - new walls, flooring, ceiling, 2 new showers, 2 unisex bathrooms, add bike rack. replace garage doors. add 1 pedestrain door mep under sep permit maher na | $100,000 |
| Sep 15, 2017 | Completed final sign-off Jan 2019 | 325 05th St | Build Group Inc. | demolish (e) interior, non bearing walls, doors, side lites, lightsdropped ceiling, remove carpet. no new work, all demo per ab17, no exterior demo work, space to remain vacant. n/a ordinance #155-13Details
demolish (e) interior, non bearing walls, doors, side lites, lightsdropped ceiling, remove carpet. no new work, all demo per ab17, no exterior demo work, space to remain vacant. n/a ordinance #155-13 | $100,000 |
| Oct 6, 2011 | Completed final sign-off Oct 2011 | 325 05th St | A A A General Roofing Co | reroofingDetails
reroofing | $13,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Build Group Inc. (9), Canning Electric Inc (3), J &J Air Conditioning Inc (3), A A A General Roofing Co, Battalion One Fire Protection, Garnett Signs Llc
- Architects
- Kurt Worthington (7)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.