Kurt Worthington
- Listed as
- architect
- Firm
- Worthington A & D
- Based in
- Emeryville
- On San Francisco permits
- Oct 2006 to Aug 2026
22 permits since 2000 (architect on 22 permits): 16 completed, 1 in progress, 4 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2026 | In progress filed Aug 2026, not yet issued | 828 Holloway Av | Richard L Collora Contracting Services | gr fl commercial space. replace existing walls, non bearing. replace existing door sand windows. relocate bathroom. new lights and floor covering. new doors, awning, store front windows. new heat pump.Details
gr fl commercial space. replace existing walls, non bearing. replace existing door sand windows. relocate bathroom. new lights and floor covering. new doors, awning, store front windows. new heat pump. | $30,000 |
| Oct 19, 2018 | Completed final sign-off Jun 2022 | 568 Funston Av | Build Group Inc. | reconfiguration ground floor & add darkroom, relocate bathroom, create 1 car garage. 1st flr: reconfigure space, remodel kitchen & capture space that was deck & make habitable, create (n) deck & stairs, 2nd flr: remodel master bedroom & master bath vault ceiling, add skylights. ** maher: n/a **Details
reconfiguration ground floor & add darkroom, relocate bathroom, create 1 car garage. 1st flr: reconfigure space, remodel kitchen & capture space that was deck & make habitable, create (n) deck & stairs, 2nd flr: remodel master bedroom & master bath vault ceiling, add skylights. ** maher: n/a ** | $300,000 |
| May 7, 2018 | Completed final sign-off Jan 2019 | 325 05th St | Build Group Inc. | 1st fl - add 2 hour wall in garage with 90 minute door and add new door from stair 2Details
1st fl - add 2 hour wall in garage with 90 minute door and add new door from stair 2 | $2,000 |
| May 7, 2018 | Completed final sign-off Jan 2019 | 325 05th St | Build Group Inc. | 3rd fl - revision to pa 2017-1127-4825 add storage closet, remove built in table kitchen, turn conference room into an office, and call out chase per field inspectionDetails
3rd fl - revision to pa 2017-1127-4825 add storage closet, remove built in table kitchen, turn conference room into an office, and call out chase per field inspection | $1,000 |
| Apr 10, 2018 | Never finaled issued Dec 2019, no final | 325 05th St | Build Group Inc. | (change of use for 1st flr) convert garage & storage area to office space for bld tenant **maher n/a**Details
(change of use for 1st flr) convert garage & storage area to office space for bld tenant **maher n/a** | $1,000 |
| Mar 29, 2018 | Completed final sign-off Jan 2019 | 325 05th St | Build Group Inc. | revision to 201712116139. update bathroom dimensions and remove toiletry closet, add enclosed office space in lieu of open office conference spaceDetails
revision to 201712116139. update bathroom dimensions and remove toiletry closet, add enclosed office space in lieu of open office conference space | $500 |
| Dec 11, 2017 | Completed final sign-off Oct 2018 | 325 05th St | Build Group Inc. | 2nd floor: t. i. build out of extg space on the 2nd floor. no new square footage. no change of use. new flooring, walls. mep under seperate permit. n/a for maherDetails
2nd floor: t. i. build out of extg space on the 2nd floor. no new square footage. no change of use. new flooring, walls. mep under seperate permit. n/a for maher | $148,500 |
| Nov 27, 2017 | Completed final sign-off Oct 2018 | 325 05th St | Build Group Inc. | 1st flr ti only - new walls, flooring, ceiling, 2 new showers, 2 unisex bathrooms, add bike rack. replace garage doors. add 1 pedestrain door mep under sep permit maher naDetails
1st flr ti only - new walls, flooring, ceiling, 2 new showers, 2 unisex bathrooms, add bike rack. replace garage doors. add 1 pedestrain door mep under sep permit maher na | $100,000 |
| Sep 15, 2017 | Completed final sign-off Jan 2019 | 325 05th St | Build Group Inc. | demolish (e) interior, non bearing walls, doors, side lites, lightsdropped ceiling, remove carpet. no new work, all demo per ab17, no exterior demo work, space to remain vacant. n/a ordinance #155-13Details
demolish (e) interior, non bearing walls, doors, side lites, lightsdropped ceiling, remove carpet. no new work, all demo per ab17, no exterior demo work, space to remain vacant. n/a ordinance #155-13 | $100,000 |
| Nov 28, 2016 | Never finaled issued Dec 2016, no final | 3000 16th St | Build Group Inc. | reference pa 2016-1101-1632 mep only permit. new electrical, lighting and plumbing fixtures in remodel office tiDetails
reference pa 2016-1101-1632 mep only permit. new electrical, lighting and plumbing fixtures in remodel office ti | $16,000 |
| Nov 28, 2016 | Never finaled issued Dec 2016, no final | 3000 16th St | Build Group Inc. | reference pa 2016-1101-1630 mep only permit new electrical, lighting and plumbing fixtures in remodel office tiDetails
reference pa 2016-1101-1630 mep only permit new electrical, lighting and plumbing fixtures in remodel office ti | $16,000 |
| Nov 1, 2016 | Completed final sign-off Jan 2017 | 3000 16th St | Build Group Inc. | 3rd floor: ti - of (e) office space mep & sprinklers on sep permit - as necessary for remodelDetails
3rd floor: ti - of (e) office space mep & sprinklers on sep permit - as necessary for remodel | $65,000 |
| Nov 1, 2016 | Completed final sign-off Jan 2017 | 3000 16th St | Build Group Inc. | 2nd floor: ti - of (e) office space mep & sprinklers on sep permit - as necessary for remodelDetails
2nd floor: ti - of (e) office space mep & sprinklers on sep permit - as necessary for remodel | $78,000 |
| Sep 13, 2016 | Completed final sign-off Jan 2017 | 3000 16th St | Build Group Inc. | 2nd & 3rd floor - demo of a few non-structural walls, removal of plaster from walls - per ab-017.Details
2nd & 3rd floor - demo of a few non-structural walls, removal of plaster from walls - per ab-017. | $7,500 |
| Jul 6, 2016 | Completed final sign-off Aug 2016 | 531 Bryant St | Build Group Inc. | demo (e) non-bearing walls, carpet and tile. create opening in (e) non bearing wall. all work on 1st floor maher naDetails
demo (e) non-bearing walls, carpet and tile. create opening in (e) non bearing wall. all work on 1st floor maher na | $9,000 |
| May 9, 2016 | Completed final sign-off Apr 2017 | 1343 31st Av | Red Bridge Construction Inc | remodel 1st level of (e) 2 level home. replace windows on rear elevation with new french doors & add 2 windows. claim some space in garage for habitable use. remodel (e) master bath, relocate powder room & make into 3/4 bath. replace (e) heating system with hydronic one.Details
remodel 1st level of (e) 2 level home. replace windows on rear elevation with new french doors & add 2 windows. claim some space in garage for habitable use. remodel (e) master bath, relocate powder room & make into 3/4 bath. replace (e) heating system with hydronic one. | $130,000 |
| Feb 29, 2016 | Never finaled issued Mar 2016, no final | 953 Mission St | Build Group Inc. | 2nd floor: t.i. existing space. includes new walls, new carpet, new windows, new tile and lights. retail to retail no change of use. no reduction in dwelling count unit. no exterior work.Details
2nd floor: t.i. existing space. includes new walls, new carpet, new windows, new tile and lights. retail to retail no change of use. no reduction in dwelling count unit. no exterior work. | $125,000 |
| Sep 18, 2015 | Completed final sign-off Oct 2016 | 310 Santa Clara Av | add deck; add bedroom and bathroom in basementDetails
add deck; add bedroom and bathroom in basement | $5,000 | |
| Oct 19, 2011 | Completed final sign-off Oct 2016 | 310 Santa Clara Av | revision to 201108152451. voluntary seismic upgrade. restore e stair, relocate opening to breakfast room, reconfigure master bath, guest bath, move laundry rm to 2nd flr.Details
revision to 201108152451. voluntary seismic upgrade. restore e stair, relocate opening to breakfast room, reconfigure master bath, guest bath, move laundry rm to 2nd flr. | $72,000 | |
| Aug 15, 2011 | Completed final sign-off Nov 2011 | 3251 20th Av | remodel existing quick service kiosk space # 250-c in existing mall ( stonestown galleria). change of some kitchen equipment, plumbing and electrical. new finishes on front counterDetails
remodel existing quick service kiosk space # 250-c in existing mall ( stonestown galleria). change of some kitchen equipment, plumbing and electrical. new finishes on front counter | $42,000 | |
| Aug 10, 2009 | Expired or cancelled cancelled Nov 2011 | 117 Prospect Av | remove portion of gable roof & create flat roof. remove some interior walls, new doors and windows, relocate (e) kitchen, (n) skylight, patch and match (e) siding.all work on the second floor.Details
remove portion of gable roof & create flat roof. remove some interior walls, new doors and windows, relocate (e) kitchen, (n) skylight, patch and match (e) siding.all work on the second floor. | $130,000 | |
| Oct 16, 2006 | Completed final sign-off Jun 2007 | 11 Hernandez Av | add new can lights, pendant lights, add new releplaces in dining room and living room, light in garageDetails
add new can lights, pendant lights, add new releplaces in dining room and living room, light in garage | $300 |