Richard L Collora Contracting Services
- Based in
- San Carlos
- On San Francisco permits
- Jul 2024 to Aug 2026
- Last 24 months
- 3 permits filed
6 permits since 2000: 3 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2026 | In progress filed Aug 2026, not yet issued | 830 Holloway Av | gr fl commercial space. replace e e doors, windows, add work stations for hair salon. relocate bathroom. private office, add new lights and floor covering. new doors and awning at front. new heat pump.Details
gr fl commercial space. replace e e doors, windows, add work stations for hair salon. relocate bathroom. private office, add new lights and floor covering. new doors and awning at front. new heat pump. | $30,000 |
| Aug 11, 2026 | In progress filed Aug 2026, not yet issued | 828 Holloway Av | gr fl commercial space. replace existing walls, non bearing. replace existing door sand windows. relocate bathroom. new lights and floor covering. new doors, awning, store front windows. new heat pump.Details
gr fl commercial space. replace existing walls, non bearing. replace existing door sand windows. relocate bathroom. new lights and floor covering. new doors, awning, store front windows. new heat pump. | $30,000 |
| Jul 22, 2026 | In progress issued Aug 2026 | 3978 22nd St | 1) convert existing basement bonus room into a bedroom, 2)reconfigure the laundry closet & add a new powder room, 3) in-kind replair of existing deck/sunroom.Details
1) convert existing basement bonus room into a bedroom, 2)reconfigure the laundry closet & add a new powder room, 3) in-kind replair of existing deck/sunroom. | $83,000 |
| Sep 16, 2024 | Completed final sign-off Aug 2025 | 2147 28th Av | lower level remodel scope of works includes, reconfigure & remodel (e)lower level bedroom & bath,create additional 351 square feet of livable space from (e)stoarage & garage.replace(e)furnace & ducts.Details
lower level remodel scope of works includes, reconfigure & remodel (e)lower level bedroom & bath,create additional 351 square feet of livable space from (e)stoarage & garage.replace(e)furnace & ducts. | $113,000 |
| Jul 30, 2024 | Completed final sign-off Sep 2026 | 3400 Santiago St | (n) garage door. (n) office, bath & bike storage in (e) garageDetails
(n) garage door. (n) office, bath & bike storage in (e) garage | $27,000 |
| Jul 25, 2024 | Completed final sign-off Aug 2024 | 1650 Valencia St | remove stucco & install hardi-plank siding on south wall. full ada compliance was permitted under bpa# 202304034912Details
remove stucco & install hardi-plank siding on south wall. full ada compliance was permitted under bpa# 202304034912 | $30,000 |