Block 0310, lot 007
18 Geary St
- City’s use
- Commercial Retail
- Built
- 1907
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 7,250 sq ft
- Lot
- 3,628 sq ft
- Zoning
- C3O
- Construction type
- S
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 1, 2026 | In progress issued May 2026 | 18 Geary St | Discount Signs & Neon Inc | install (1) illuminated projecting signDetails
install (1) illuminated projecting sign | $7,000 |
| Aug 12, 2022 | Completed final sign-off May 2023 | 18 Geary St | G Swanson Constr. Inc. | to comply with the accessible business entry program. abe 202206071311. installing of automatic door operator, interior and exterior push plates at existing entrance doors.Details
to comply with the accessible business entry program. abe 202206071311. installing of automatic door operator, interior and exterior push plates at existing entrance doors. | $50,000 |
| Aug 22, 2017 | Never finaled issued Aug 2017, no final | 18 Geary St | Aaa Restaurant Fire Control/Dba Aaa Fire | as-built drawings for pa#201706088487: fire sprinklers. n/a for maher.Details
as-built drawings for pa#201706088487: fire sprinklers. n/a for maher. | |
| Aug 8, 2017 | Completed final sign-off Aug 2017 | 18 Geary St | Bay Alarm Company | fire as builts due to field inspection. ref. pa #201706219978. basement, 1st & 2nd fl. maher na.Details
fire as builts due to field inspection. ref. pa #201706219978. basement, 1st & 2nd fl. maher na. | |
| Jul 20, 2017 | Never finaled issued Jul 2017, no final | 18 Geary St | Northern Sun Associates | 2nd floor - revision to pa #201703201895 - minor revision to lighting & corresponding revision to t-24 energy calcs. n/a maher ordinanceDetails
2nd floor - revision to pa #201703201895 - minor revision to lighting & corresponding revision to t-24 energy calcs. n/a maher ordinance | |
| Jul 18, 2017 | Never finaled issued Jul 2017, no final | 18 Geary St | revision to app#201702088991. relocation of water heater and outside air ductwork.Details
revision to app#201702088991. relocation of water heater and outside air ductwork. | ||
| Jun 21, 2017 | Completed final sign-off Aug 2017 | 18 Geary St | Bay Alarm Company | replace old fire alarm system with new addressable system due to t.i. on 1st floor and 2nd floor and work also in basement. add 4 new duct detectors for new fcu's on 1st floor. ref # 1st floor is 201604195148 and 2nd floor app#201703201895Details
replace old fire alarm system with new addressable system due to t.i. on 1st floor and 2nd floor and work also in basement. add 4 new duct detectors for new fcu's on 1st floor. ref # 1st floor is 201604195148 and 2nd floor app#201703201895 | $11,280 |
| Jun 5, 2017 | Completed final sign-off Sep 2017 | 18 Geary St | Aaa Restaurant Fire Control/Dba Aaa Fire | provide new riser and main in basement. install new overhead system with ez bracing, hangers on 1st fl. relocate 13 existing sprinklers in basement/rebuild lines. maher not reqDetails
provide new riser and main in basement. install new overhead system with ez bracing, hangers on 1st fl. relocate 13 existing sprinklers in basement/rebuild lines. maher not req | $15,000 |
| Mar 20, 2017 | Completed final sign-off Aug 2017 | 18 Geary St | Northern Sun Associates | 2nd floor - interior improvements at 2nd floor space (only) to include new unisex restroom and new kitchenette. selective demo at (e) interior partitions, new entry door adjacent stair, interior doors, mep work included. n/a maherDetails
2nd floor - interior improvements at 2nd floor space (only) to include new unisex restroom and new kitchenette. selective demo at (e) interior partitions, new entry door adjacent stair, interior doors, mep work included. n/a maher | $125,000 |
| Feb 8, 2017 | Never finaled issued Mar 2017, no final | 18 Geary St | Build Group Inc., Michilli Inc | revision to pa 2016-0419-5148. changes to millwork, partitions, finishes & mep. maher naDetails
revision to pa 2016-0419-5148. changes to millwork, partitions, finishes & mep. maher na | $20,000 |
| May 5, 2016 | Completed final sign-off Jun 2016 | 18 Geary St | revision to 201501216216, reduction of scope of work for electricalDetails
revision to 201501216216, reduction of scope of work for electrical | ||
| Apr 19, 2016 | Never finaled issued Dec 2016, no final | 18 Geary St | Michilli Inc | interior t.i. for new retail store, work includes new partitions, fixtures, finishes bathrooms, mep & fire protection under seperate permits. facade work under seperate permit.Details
interior t.i. for new retail store, work includes new partitions, fixtures, finishes bathrooms, mep & fire protection under seperate permits. facade work under seperate permit. | $480,000 |
| Apr 19, 2016 | Never finaled issued Apr 2017, no final | 18 Geary St | Build Group Inc., Michilli Inc | exterior storefront improvement for new retail store. existing brick facade to remain. interior t.i. under separate permit pa#2016 0419 5148 ** maher: n/a **Details
exterior storefront improvement for new retail store. existing brick facade to remain. interior t.i. under separate permit pa#2016 0419 5148 ** maher: n/a ** | $80,000 |
| Mar 17, 2016 | Completed final sign-off Jun 2016 | 18 Geary St | revision to permit #201501216216 to remove interior demising wall & add a new storefront mullion at the easternmost bay. convert 2b into 1 m occupancy and add exit. work reviewed and approved as part of minor permit to alter case 2014-000856. previous revision #2015-1223-5877 to be canceled.na maherDetails
revision to permit #201501216216 to remove interior demising wall & add a new storefront mullion at the easternmost bay. convert 2b into 1 m occupancy and add exit. work reviewed and approved as part of minor permit to alter case 2014-000856. previous revision #2015-1223-5877 to be canceled.na maher | $5,000 | |
| Dec 23, 2015 | Completed final sign-off Jun 2016 | 18 Geary St | Northern Sun Associates | revision of plan to omit demising wall, combining 2 m occupancies and add an exit hall for exit separation. revison to app#201501216216. n/a forDetails
revision of plan to omit demising wall, combining 2 m occupancies and add an exit hall for exit separation. revison to app#201501216216. n/a for | |
| Jan 21, 2015 | Completed final sign-off Jun 2016 | 18 Geary St | Northern Sun Associates | basement & 1st floor - construction of (2) unisex restrooms & partition to demise large space into 2 spaces. improvement of spaces for storage in the basement. miccellaneous structural improvements. n/a maher ordinanceDetails
basement & 1st floor - construction of (2) unisex restrooms & partition to demise large space into 2 spaces. improvement of spaces for storage in the basement. miccellaneous structural improvements. n/a maher ordinance | $125,000 |
| Sep 29, 2014 | Completed final sign-off Jun 2016 | 18 Geary St | demo and replacement of ground floor storefront, windows and doors. demo (e) awnings. new exterior lights. to comply with maher ordinance - extended no.155-13 not required; ref. pmt 201501286216Details
demo and replacement of ground floor storefront, windows and doors. demo (e) awnings. new exterior lights. to comply with maher ordinance - extended no.155-13 not required; ref. pmt 201501286216 | $75,000 | |
| Aug 22, 2014 | Never finaled issued Aug 2014, no final | 18 Geary St | street spaceDetails
street space | ||
| Jul 8, 2014 | Completed final sign-off Jun 2016 | 18 Geary St | Build Group Inc. | interior demo of non-bearing partition walls on 1/f & mezzanine floor, removal of 1/f kitchen and bathrooms, electrical and plumbing to be demo and capped, sprinkler to remain operational. demo as per ab-17 all egress and life safety systems to remain operational. maintain fire escape.Details
interior demo of non-bearing partition walls on 1/f & mezzanine floor, removal of 1/f kitchen and bathrooms, electrical and plumbing to be demo and capped, sprinkler to remain operational. demo as per ab-17 all egress and life safety systems to remain operational. maintain fire escape. | $60,000 |
| Jun 28, 2000 | Expired or cancelled expired Oct 2000 | 18 Geary St | sidewalk repairDetails
sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Northern Sun Associates (4), Build Group Inc. (3), Michilli Inc (3), Aaa Restaurant Fire Control/Dba Aaa Fire (2), Bay Alarm Company (2), Discount Signs & Neon Inc, G Swanson Constr. Inc.
- Architects
- Cass Calder Smith (6), Barry Bourbon (3), Cass Calder Smith
- Engineers
- Donald David, Srdjan Rebraca
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.