Build Group Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2007 to Aug 2026
- Last 24 months
- 52 permits filed
695 permits since 2000: 448 completed, 30 in progress, 188 never finaled, 29 expired or cancelled.
Of the 188 never-finaled permits, 15 are 3 to 5 years old, 94 are 5 to 10 years old, 79 are over 10 years old. 6 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 300 days from filing to permit and 798 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 19, 2018 | Completed final sign-off Jun 2022 | 568 Funston Av | reconfiguration ground floor & add darkroom, relocate bathroom, create 1 car garage. 1st flr: reconfigure space, remodel kitchen & capture space that was deck & make habitable, create (n) deck & stairs, 2nd flr: remodel master bedroom & master bath vault ceiling, add skylights. ** maher: n/a **Details
reconfiguration ground floor & add darkroom, relocate bathroom, create 1 car garage. 1st flr: reconfigure space, remodel kitchen & capture space that was deck & make habitable, create (n) deck & stairs, 2nd flr: remodel master bedroom & master bath vault ceiling, add skylights. ** maher: n/a ** | $300,000 |
| Dec 12, 2017 | Expired or cancelled cancelled Jan 2026 | 2500 Mason St | exterior renovation of public area 1st fl awnings, gates, pool deck enclosure, doors and frame, ceiling lighting, finishesDetails
exterior renovation of public area 1st fl awnings, gates, pool deck enclosure, doors and frame, ceiling lighting, finishes | $400,000 |
| Feb 12, 2015 | Completed final sign-off Dec 2017 | 1100 Market St | to repair fire damage. replace damaged walls + ceilings on guestroom flr w/rated construction. incorporate guestroom bathrooms w/rated doors, replace (e) laundry chutes w/rated (n) chutes and doors. replace damaged wood sub-flr + concrete slab at 2nd fl w/(n) structural steel frame + concrete deck.Details
to repair fire damage. replace damaged walls + ceilings on guestroom flr w/rated construction. incorporate guestroom bathrooms w/rated doors, replace (e) laundry chutes w/rated (n) chutes and doors. replace damaged wood sub-flr + concrete slab at 2nd fl w/(n) structural steel frame + concrete deck. | $100,000 |
| Jun 17, 2014 | Never finaled issued Sep 2014, no final | 2121 03rd St | unit# 110 only. construct private deck & guardrail in lieu of stairs & stoop as approved under pa# 2011/11/17/9162's'.Details
unit# 110 only. construct private deck & guardrail in lieu of stairs & stoop as approved under pa# 2011/11/17/9162's'. | $1,000 |