Nibbi Bros Assoc Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Sep 2026
- Last 24 months
- 40 permits filed
495 permits since 2000: 353 completed, 32 in progress, 88 never finaled, 22 expired or cancelled.
Of the 88 never-finaled permits, 6 are 3 to 5 years old, 33 are 5 to 10 years old, 49 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
16 stairs permits: 16 completed. Typically 18 days from filing to permit and 235 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2024 | Completed final sign-off Jun 2025 | 1044 Howard St | deferred submittal for 202305047097 to include (n) interior metal stairs and guardrails.Details
deferred submittal for 202305047097 to include (n) interior metal stairs and guardrails. | |
| Nov 30, 2020 | Completed final sign-off Nov 2021 | 420 Taylor St | revision to bpa# 201901160492. this application is for the review and approval of design/build interior steel stairs. the attached shop drawings and calculations have been reviewed and approved by the project architect and structural engineer.Details
revision to bpa# 201901160492. this application is for the review and approval of design/build interior steel stairs. the attached shop drawings and calculations have been reviewed and approved by the project architect and structural engineer. | $150,000 |
| May 9, 2019 | Completed final sign-off Mar 2020 | 2445 Mariposa St | six exterior bridges ( bridges 1 to bridge 6 ) and adjacent exterior decks to be repaired w/ "replace in-kind" approach. 2nd flr exterior deck at stair 7 to be repaired w/ "replace in-kind" approach.Details
six exterior bridges ( bridges 1 to bridge 6 ) and adjacent exterior decks to be repaired w/ "replace in-kind" approach. 2nd flr exterior deck at stair 7 to be repaired w/ "replace in-kind" approach. | $200,000 |
| Feb 7, 2019 | Completed final sign-off Jun 2019 | 735 Market St | 6th fl. rev to pa# 201809109599; remove communicating stairs from scope of work, new corridor from elevator to sales office, new unisex rest roomDetails
6th fl. rev to pa# 201809109599; remove communicating stairs from scope of work, new corridor from elevator to sales office, new unisex rest room | $5,000 |
| Sep 10, 2018 | Completed final sign-off Jun 2019 | 735 Market St | update finishes on level 5 reception space. constructur new reception space and sales office on level 6 insertion of convience stairs between level 5 & 6. ,ep/sprinklers/fir alarm on sep permitDetails
update finishes on level 5 reception space. constructur new reception space and sales office on level 6 insertion of convience stairs between level 5 & 6. ,ep/sprinklers/fir alarm on sep permit | $700,000 |
| Oct 27, 2017 | Completed final sign-off Aug 2018 | 626 Mission Bay Blvd North Bl | scope: erection & calculation for metal stairs. reference pa #201507272485. maher naDetails
scope: erection & calculation for metal stairs. reference pa #201507272485. maher na | $50,000 |
| Dec 20, 2016 | Completed final sign-off Mar 2017 | 588 Mission Bay Blvd North Bl | revision to 201404042522s3, clarifies smoke detection in elevator hoistway and remove door hold-opens in exterior stair.Details
revision to 201404042522s3, clarifies smoke detection in elevator hoistway and remove door hold-opens in exterior stair. | |
| Sep 16, 2016 | Completed final sign-off Nov 2016 | 1227 Hampshire St | revision to pa#201504103392 to reduce scope of work on stair from replacing stairs with new steel stair to only repairing damage treads in kind, remove rust from weld connection and painting. n/a ordinance #155-13Details
revision to pa#201504103392 to reduce scope of work on stair from replacing stairs with new steel stair to only repairing damage treads in kind, remove rust from weld connection and painting. n/a ordinance #155-13 | |
| Jun 24, 2015 | Completed final sign-off Oct 2017 | 2600 Arelious Walker Dr | revision to app#201401166470 s1 and app#201503171075 for wood stair (non-fire retardant rated) construction on floors 2-5. n/a for the maherDetails
revision to app#201401166470 s1 and app#201503171075 for wood stair (non-fire retardant rated) construction on floors 2-5. n/a for the maher | |
| Jun 24, 2015 | Completed final sign-off Oct 2017 | 2700 Arelious Walker Dr | revision to app#201401166475 s1 and 201503171076 for wood stair (non fire retardant rated) construction on floors 2-5. n/a for the maherDetails
revision to app#201401166475 s1 and 201503171076 for wood stair (non fire retardant rated) construction on floors 2-5. n/a for the maher | |
| Mar 17, 2015 | Completed final sign-off Oct 2017 | 2700 Arelious Walker Dr | rev to ref pa # 2014 01 16 6475 s1, include wood stairs. maher - not req'dDetails
rev to ref pa # 2014 01 16 6475 s1, include wood stairs. maher - not req'd | |
| Mar 17, 2015 | Completed final sign-off Oct 2017 | 2600 Arelious Walker Dr | rev to pa# 2014 0116 6470 s1, include wood stairs. maher - not req'dDetails
rev to pa# 2014 0116 6470 s1, include wood stairs. maher - not req'd | |
| Feb 18, 2015 | Completed final sign-off Jul 2015 | 1 Zoo Rd | add one bird cage support structure to back of house of the (e) south american tropical forest exhibit building. new mat foundation, steel beam post structure. standing seam roof, drains @ cage area, lights for keeper platform & stair. ** maher: compliance with ordinance no# 155-13 not required **Details
add one bird cage support structure to back of house of the (e) south american tropical forest exhibit building. new mat foundation, steel beam post structure. standing seam roof, drains @ cage area, lights for keeper platform & stair. ** maher: compliance with ordinance no# 155-13 not required ** | $40,000 |
| Feb 8, 2013 | Completed final sign-off Oct 2014 | 1155 04th St | revision to approved pa #2011/08/01/1792-s2. provide detail is for metal stairs.Details
revision to approved pa #2011/08/01/1792-s2. provide detail is for metal stairs. | |
| Aug 27, 2009 | Completed final sign-off Jan 2010 | 150 Britton St | replace (e) guardrails @ six locations to repair dry rot damage & prevent future damage. replace (e) wood rails @ 6 stairs with steel pipe rails. paint rails. resurface & waterproof existing decks. no structural work.Details
replace (e) guardrails @ six locations to repair dry rot damage & prevent future damage. replace (e) wood rails @ 6 stairs with steel pipe rails. paint rails. resurface & waterproof existing decks. no structural work. | $299,967 |
| May 30, 2008 | Completed final sign-off Oct 2010 | 901 Alabama St | renovation of (e) clubhouse. demolition of (e)rear gym & construction of new gym & 2-story support sp. incl new exit stair,elevator,baths,dock. existing front bldg to be renovated,including seismic reinforcing of structure, upgrading infrastructure to current codes, and exterior restoration work.Details
renovation of (e) clubhouse. demolition of (e)rear gym & construction of new gym & 2-story support sp. incl new exit stair,elevator,baths,dock. existing front bldg to be renovated,including seismic reinforcing of structure, upgrading infrastructure to current codes, and exterior restoration work. | $200,000 |