Block 3719, lot 385
301 Mission St
- City’s use
- Single Family Residential
- Built
- 2009
- Stories
- 1
- Rooms
- 2 bedrooms, 3 bathrooms
- Building
- 5,096 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 1, 2017 | Completed final sign-off Nov 2018 | 301 Mission St | Paul Ryan Associates | removal of existing water feature from the corner of lounge area the perimeter of unit ph2b. new flooring to be installed where water feature is removed. maher naDetails
removal of existing water feature from the corner of lounge area the perimeter of unit ph2b. new flooring to be installed where water feature is removed. maher na | $17,000 |
| Jul 30, 2014 | Completed final sign-off Oct 2014 | 301 Mission St | Red Hawk Fire & Security Ca Llc | install 14 notification devices. 1 smoke detector and 2 door holds. 2 dmp with smoke detector for heat pum shutdown. 1 booster power supply for strobes. monitor module to monitor 120 vac smoke/co sensors. maher not requiredDetails
install 14 notification devices. 1 smoke detector and 2 door holds. 2 dmp with smoke detector for heat pum shutdown. 1 booster power supply for strobes. monitor module to monitor 120 vac smoke/co sensors. maher not required | $26,000 |
| Apr 15, 2014 | Completed final sign-off Oct 2014 | 301 Mission St | Paul Ryan Associates | the scope of work involves a revision to the fireplace flue penetration at the existing shaft wall. revision to pa#201403241517. n/a ordinance #155-13.Details
the scope of work involves a revision to the fireplace flue penetration at the existing shaft wall. revision to pa#201403241517. n/a ordinance #155-13. | |
| Mar 24, 2014 | Completed final sign-off Oct 2014 | 301 Mission St | Paul Ryan Associates | revision app. 2013.08.06.3622. updated mechanical drawings & architectural information. the information included revised location and additional informatioa for the heat pumps and revised location of the exhaust flue for the gas fireplace. compliance with ord. no. 155-13 not required. exc.<50 cu.yd.Details
revision app. 2013.08.06.3622. updated mechanical drawings & architectural information. the information included revised location and additional informatioa for the heat pumps and revised location of the exhaust flue for the gas fireplace. compliance with ord. no. 155-13 not required. exc.<50 cu.yd. | $300 |
| Jan 29, 2014 | Completed final sign-off Oct 2014 | 301 Mission St | Pribuss Engineering Inc | fire sprinkler t.i. 2013-0419-4987 - relocate & change out 42 sprinkler heads, add 22 sprinkler heads. compliance with ordinance #155-13 not required. total: 64 x 514.62 - 32936.Details
fire sprinkler t.i. 2013-0419-4987 - relocate & change out 42 sprinkler heads, add 22 sprinkler heads. compliance with ordinance #155-13 not required. total: 64 x 514.62 - 32936. | $32,936 |
| Dec 12, 2013 | Completed final sign-off Nov 2014 | 301 Mission St | Paul Ryan Associates | level ph2 corridor - work includes renovation of common lobby & corridor. new floor & wall finishes & new light fixtures. no work will be done to existing mechanical system, fire & alarm system except minor movement to sprinkler heads if ocnflicting with light fixtures. no structural work to be doneDetails
level ph2 corridor - work includes renovation of common lobby & corridor. new floor & wall finishes & new light fixtures. no work will be done to existing mechanical system, fire & alarm system except minor movement to sprinkler heads if ocnflicting with light fixtures. no structural work to be done | $250,000 |
| Sep 18, 2013 | Completed final sign-off Nov 2014 | 301 Mission St | Paul Ryan Associates | ph2b: revision to app#201308063622. to include structural calculations and drawings for a cmu block wall adjacent to a demising wall between the client's residential unit and his neighbor's unit on the 57th floor.Details
ph2b: revision to app#201308063622. to include structural calculations and drawings for a cmu block wall adjacent to a demising wall between the client's residential unit and his neighbor's unit on the 57th floor. | $2,000 |
| Aug 6, 2013 | Completed final sign-off Oct 2014 | 301 Mission St | Paul Ryan Associates | ph2b-revision to pa #2013.04.19.4987/r-1: additional mechanical & plumbing information is shown in this submittal related to new hot tub per rquirement of bldg management.(entire plan set of pa#2013.04.19.4987/r-1 including revisions,is submitted. this sumbittal will replace pa# 2013-0419-4987/ r1.Details
ph2b-revision to pa #2013.04.19.4987/r-1: additional mechanical & plumbing information is shown in this submittal related to new hot tub per rquirement of bldg management.(entire plan set of pa#2013.04.19.4987/r-1 including revisions,is submitted. this sumbittal will replace pa# 2013-0419-4987/ r1. | $20,000 |
| Apr 19, 2013 | Completed final sign-off Oct 2014 | 301 Mission St | Paul Ryan Associates | architectural residential build-out of unit "ph2b" at mullenium tower. contruction of non-structural partitions, finishes, mechanical, elelctrical, telecom, fire sprinkler, fire management and plumbing; includes relocation of front entry door, level 58Details
architectural residential build-out of unit "ph2b" at mullenium tower. contruction of non-structural partitions, finishes, mechanical, elelctrical, telecom, fire sprinkler, fire management and plumbing; includes relocation of front entry door, level 58 | $700,000 |
| Mar 22, 2013 | Completed final sign-off Oct 2014 | 301 Mission St | Paul Ryan Associates | ph2b (millenium tower) - work include the preparation of the shell for the future build-out of interiors. plumbing will be modified & re-routed according to future architectural design. the existing slab will be levelled as necessary. mech & elec submit scope will be submitted under subsequentDetails
ph2b (millenium tower) - work include the preparation of the shell for the future build-out of interiors. plumbing will be modified & re-routed according to future architectural design. the existing slab will be levelled as necessary. mech & elec submit scope will be submitted under subsequent | $18,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Paul Ryan Associates (8), Pribuss Engineering Inc, Red Hawk Fire & Security Ca Llc
- Architects
- Ernani Aita-Barea (5)
Find contractors for work like this