Back to bathroom remodel contractors
Darc Ventures Inc Dba Spl Construction S
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Sep 2026
- Last 24 months
- 16 permits filed
148 permits since 2000: 138 completed, 4 in progress, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
80 bathroom remodel permits: 74 completed, 3 in progress, 3 expired or cancelled. Typically 1 days from filing to permit and 178 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Aug 2026 | 136 Downey St | kitchen & bath remodel, convert tub to showerpan, no wall movement, no movement of fixturesDetails
kitchen & bath remodel, convert tub to showerpan, no wall movement, no movement of fixtures | $50,000 |
| Jul 13, 2026 | In progress issued Aug 2026 | 77 Ventura Av | 2/fl- divide (e) bathroom into (1) full bathroom and (1) powder room.Details
2/fl- divide (e) bathroom into (1) full bathroom and (1) powder room. | $60,000 |
| Apr 23, 2026 | In progress issued Apr 2026 | 89 Ventura Av | new interior stair to replace existing stair in same general location. project adds a shower to existing 1/f bathroom.Details
new interior stair to replace existing stair in same general location. project adds a shower to existing 1/f bathroom. | $50,000 |
| Apr 13, 2026 | Completed final sign-off Aug 2026 | 3939 19th St | new plan configuration for the master bedroom bathroom, remove non-load bearing walls. bathroom remodel is uner permit 202601204129Details
new plan configuration for the master bedroom bathroom, remove non-load bearing walls. bathroom remodel is uner permit 202601204129 | $15,000 |
| Jan 20, 2026 | Completed final sign-off Aug 2026 | 3939 19th St | 1 kitchen and 2 and half bath remodel. like for likeDetails
1 kitchen and 2 and half bath remodel. like for like | $75,000 |
| Sep 30, 2025 | Completed final sign-off Aug 2026 | 590 30th St | add a full bath in the garage on the gr floor. replace water heater with tankless water heater.Details
add a full bath in the garage on the gr floor. replace water heater with tankless water heater. | $25,000 |
| Aug 7, 2025 | Completed final sign-off May 2026 | 272 Collingwood St | kitchen & bathroom refresh. replace in-kind. kitchen, full bathroom, 1/2 bathroom. no structural or moving of walls/door.Details
kitchen & bathroom refresh. replace in-kind. kitchen, full bathroom, 1/2 bathroom. no structural or moving of walls/door. | $50,000 |
| Jul 30, 2025 | Completed final sign-off Sep 2026 | 1358 Fell St | revision to 202502079900: expanded scope of work. new rear deck at story 2 and convert e flast roof to deck at story 3. replace rear facing window at kitchen with glass door, create new glass door, create new glass door at story 3 deck. remodel 1 and add 1 new bath in story 3. reconfigure story 3Details
revision to 202502079900: expanded scope of work. new rear deck at story 2 and convert e flast roof to deck at story 3. replace rear facing window at kitchen with glass door, create new glass door, create new glass door at story 3 deck. remodel 1 and add 1 new bath in story 3. reconfigure story 3 | $110,000 |
| Jul 2, 2025 | Completed final sign-off Mar 2026 | 208 Moultrie St | convert part of garage level to add 1 family room and one office. convert powder room into full bathroom. install patio door & window in the rear facade.Details
convert part of garage level to add 1 family room and one office. convert powder room into full bathroom. install patio door & window in the rear facade. | $40,000 |
| Feb 27, 2025 | Expired or cancelled cancelled Aug 2025 | 766 Hayes St | remodel 2 kitchens and 3 bathrooms across 2 units 480 sqftDetails
remodel 2 kitchens and 3 bathrooms across 2 units 480 sqft | $202,662 |
| Feb 7, 2025 | Completed final sign-off Sep 2026 | 1358 Fell St | interior reconfiguration & remodel containing a remodeled kitchen and remodeled 1/2 bathroom on story 2. remove (e) office in garage, relocate laundry to story 3. replace 2 windows in kind at story 2, add 1 new window in kitchen. patch and repair facade, paint.Details
interior reconfiguration & remodel containing a remodeled kitchen and remodeled 1/2 bathroom on story 2. remove (e) office in garage, relocate laundry to story 3. replace 2 windows in kind at story 2, add 1 new window in kitchen. patch and repair facade, paint. | $75,000 |
| Jan 28, 2025 | Completed final sign-off Apr 2025 | 1253 48th Av | add new full bathroom at 2nd floor: lavy, shower, sink.Details
add new full bathroom at 2nd floor: lavy, shower, sink. | $20,000 |
| Sep 30, 2024 | Expired or cancelled cancelled Aug 2025 | 766 Hayes St | bathroom remodel, fixture remain same location.Details
bathroom remodel, fixture remain same location. | $15,000 |
| Jun 21, 2024 | Completed final sign-off Dec 2024 | 436 Utah St | bath room remodelDetails
bath room remodel | $15,000 |
| Feb 23, 2024 | Completed final sign-off Aug 2024 | 1024 Ortega St | kitchen and bath remodel. new fixtures, appliances, cabinets and counter surfaces in kindDetails
kitchen and bath remodel. new fixtures, appliances, cabinets and counter surfaces in kind | $75,000 |
| Feb 2, 2024 | Completed final sign-off May 2024 | 1805 Golden Gate Av | remodel 1 full bath. like for likeDetails
remodel 1 full bath. like for like | $15,000 |
| Jun 29, 2023 | Completed final sign-off Jan 2024 | 76 Conkling St | converting ground flr into habitable space, add 560sf living space for new bedroom, media room, full bathroom and wetbar. add 2 new deck in the rear less than 36" off the ground (30"high).Details
converting ground flr into habitable space, add 560sf living space for new bedroom, media room, full bathroom and wetbar. add 2 new deck in the rear less than 36" off the ground (30"high). | $125,000 |
| May 5, 2023 | Completed final sign-off Jul 2023 | 388 Urbano Dr | add 1 new bathroom in garage serving the family room.Details
add 1 new bathroom in garage serving the family room. | $50,000 |
| May 5, 2022 | Completed final sign-off Aug 2022 | 1450 43rd Av | revision to no plan permit 202203291113. remodel 1 existing bathroom. remove non-load bearing wall. refresh (2) existing bathrooms.Details
revision to no plan permit 202203291113. remodel 1 existing bathroom. remove non-load bearing wall. refresh (2) existing bathrooms. | $10,000 |
| Mar 29, 2022 | Completed final sign-off Aug 2022 | 1450 43rd Av | 3 bathroom refresh, add 1 island in kitchen. no removal of wallsDetails
3 bathroom refresh, add 1 island in kitchen. no removal of walls | $45,000 |
| Feb 18, 2022 | Completed final sign-off Jun 2022 | 269 28th St | (1) bathroom remodel, no movement of fixtures.Details
(1) bathroom remodel, no movement of fixtures. | $15,000 |
| Oct 12, 2021 | Completed final sign-off Mar 2022 | 1868 Golden Gate Av | renovate one kitchen and 2 baths no movement of fixtures kitchen cabinet replacement. non structural.Details
renovate one kitchen and 2 baths no movement of fixtures kitchen cabinet replacement. non structural. | $55,000 |
| Oct 12, 2021 | Completed final sign-off Mar 2022 | 218 Funston Av | renovate one kitchen and 1 bath. no movement of fixtures. non structural.Details
renovate one kitchen and 1 bath. no movement of fixtures. non structural. | $35,000 |
| Jul 26, 2021 | Completed final sign-off Mar 2022 | 3294 Clay St | apt 5: remodel (e) kitchen and 2 bathroom (3/f & 4/f). remove non-load bear wall.Details
apt 5: remodel (e) kitchen and 2 bathroom (3/f & 4/f). remove non-load bear wall. | $50,000 |
| Mar 25, 2021 | Completed final sign-off Aug 2021 | 235 Berry St | renovate kitchen & (2) baths, no movement of fixtures,l no layout change, no wall framing demolitionDetails
renovate kitchen & (2) baths, no movement of fixtures,l no layout change, no wall framing demolition | $75,000 |
| Jan 6, 2021 | Completed final sign-off Aug 2021 | 116 Bradford St | remodel on both levels. remodel (e) kitchen & bathroom at 2nd fl. add new furnace. add new habitable space at ground floor. add an office room & full bathroom.Details
remodel on both levels. remodel (e) kitchen & bathroom at 2nd fl. add new furnace. add new habitable space at ground floor. add an office room & full bathroom. | $80,000 |
| Oct 29, 2020 | Completed final sign-off Jun 2021 | 127 Gambier St | interior renovation of (e) kitchen, dining room & bathroom. additional bathroom created within (e) envelope. (e) back deck stairs to remain unchanged.Details
interior renovation of (e) kitchen, dining room & bathroom. additional bathroom created within (e) envelope. (e) back deck stairs to remain unchanged. | $70,000 |
| Sep 21, 2020 | Completed final sign-off Apr 2024 | 80 Ventura Av | new interior stair and elevator being added at entry. exterior staircase and cupola being removed at entry. deck being replaced, expanded and redesigned at rear. both bathrooms being remodeled at 3rd floor.Details
new interior stair and elevator being added at entry. exterior staircase and cupola being removed at entry. deck being replaced, expanded and redesigned at rear. both bathrooms being remodeled at 3rd floor. | $150,000 |
| Jun 29, 2020 | Completed final sign-off Dec 2020 | 738 Fell St | kitchen and 2.5 bath remodel. no movement of fixtures. " kitchen is 15'4" x 10'11" " bath 1- 5'8" x 10'8" (toilet, sink, tub/shower) " bath 2- 9'0" x 6'1" (toilet, sink, tub/shower) " bath 3- 4'7" x 3'6" (toilet, sink)Details
kitchen and 2.5 bath remodel. no movement of fixtures. " kitchen is 15'4" x 10'11" " bath 1- 5'8" x 10'8" (toilet, sink, tub/shower) " bath 2- 9'0" x 6'1" (toilet, sink, tub/shower) " bath 3- 4'7" x 3'6" (toilet, sink) | $20,000 |
| Jun 4, 2020 | Completed final sign-off Aug 2020 | 893 Ashbury St | remodel bathroom in kind, no movement of fixtures. deck repair less than 50% at the rear of building.Details
remodel bathroom in kind, no movement of fixtures. deck repair less than 50% at the rear of building. | $35,000 |
| Jun 3, 2020 | Completed final sign-off Feb 2021 | 220 Funston Av | kitchen and bathroom renovation in-kind. all fixtures to remain in the same place. no movement of existing walls or doors.Details
kitchen and bathroom renovation in-kind. all fixtures to remain in the same place. no movement of existing walls or doors. | $50,000 |
| Mar 11, 2020 | Completed final sign-off Jul 2020 | 512 18th Av | renovation of 1 kitchen & 2 bathrooms. non momvent of plumbing fixtures & layout. no walls modified.Details
renovation of 1 kitchen & 2 bathrooms. non momvent of plumbing fixtures & layout. no walls modified. | $40,000 |
| Mar 2, 2020 | Completed final sign-off Jul 2020 | 1424 Page St | bathroom: remove and replace tub, vanity and tile bath floorDetails
bathroom: remove and replace tub, vanity and tile bath floor | $12,000 |
| Dec 16, 2019 | Completed final sign-off Mar 2021 | 1370 Webster St | add full bath to lower level and spiral stair to access level. convert (e) storage space to new living room in basementDetails
add full bath to lower level and spiral stair to access level. convert (e) storage space to new living room in basement | $20,000 |
| Aug 1, 2019 | Completed final sign-off Feb 2020 | 1998 Broadway | unit # 406: kitchen remodel all fixtures to remain in place. 2 bathroom remodels, new tile, new vanity, new shower pan. kitchen 10x10 / bath 6x10 / bath 8x10Details
unit # 406: kitchen remodel all fixtures to remain in place. 2 bathroom remodels, new tile, new vanity, new shower pan. kitchen 10x10 / bath 6x10 / bath 8x10 | $35,000 |
| May 17, 2019 | Expired or cancelled expired Aug 2023 | 2701 Van Ness Av | unit 710: relocate kitchen, remodel 2 extg bathrooms, new lighting & electrical, modify interior soffits, minor modification of partition walls. n/a for maherDetails
unit 710: relocate kitchen, remodel 2 extg bathrooms, new lighting & electrical, modify interior soffits, minor modification of partition walls. n/a for maher | $110,000 |
| May 9, 2019 | Completed final sign-off Jan 2020 | 95 Ventura Av | upper fl - new kitchen in (e) location, (n) intertal stair & (n) master bathroom; 1st fl - new bathroom fixtures & finishes, relocated laundry. new fau & water heater. project will not expand (e) bldg envelope or alter (e) facadeDetails
upper fl - new kitchen in (e) location, (n) intertal stair & (n) master bathroom; 1st fl - new bathroom fixtures & finishes, relocated laundry. new fau & water heater. project will not expand (e) bldg envelope or alter (e) facade | $100,000 |
| Feb 28, 2019 | Completed final sign-off Jan 2020 | 855 29th Av | kitchen and bath remodel. non-load bearing wall removal to enlarge family rm. re-tile (e) center patio.Details
kitchen and bath remodel. non-load bearing wall removal to enlarge family rm. re-tile (e) center patio. | $50,000 |
| Jan 31, 2019 | Completed final sign-off May 2019 | 1800 Washington St | remove and replace kitchen cabinets and countertop. remove and replace cabinet and tile surface in bathroom. no movement of bathroom or kitchen fixtures. (kitchen and bathroom remodel)Details
remove and replace kitchen cabinets and countertop. remove and replace cabinet and tile surface in bathroom. no movement of bathroom or kitchen fixtures. (kitchen and bathroom remodel) | $30,000 |
| Oct 30, 2018 | Completed final sign-off May 2019 | 373 Warren Dr | 2nd flr bathroom remodel. (e) walls to be removed, toilet relocation, (n) partial height wall to be added and (n) finishes and fixturesDetails
2nd flr bathroom remodel. (e) walls to be removed, toilet relocation, (n) partial height wall to be added and (n) finishes and fixtures | $20,000 |
| Aug 23, 2018 | Completed final sign-off May 2019 | 157 Winfield St | interior renovation of (e) conditioned 3rd fl apt. relocate e bathroom, add bathroom, closet, skylights.Details
interior renovation of (e) conditioned 3rd fl apt. relocate e bathroom, add bathroom, closet, skylights. | $75,000 |
| Jul 27, 2018 | Completed final sign-off Dec 2018 | 1636 09th Av | remodel (e) bathroom and water closet. add shower, infill door, remove partition wall btn old bath & water closetDetails
remodel (e) bathroom and water closet. add shower, infill door, remove partition wall btn old bath & water closet | $20,000 |
| Jul 17, 2018 | Completed final sign-off Oct 2018 | 346 Crescent Av | bathroom remodel: new fixtures in same location. new shower pan.Details
bathroom remodel: new fixtures in same location. new shower pan. | $12,000 |
| Feb 20, 2018 | Completed final sign-off Dec 2018 | 738 Fell St | revision to 201712277565 to include adding partition wall in bathroom and adding a washer/dryer hookup and closet next to bathroomDetails
revision to 201712277565 to include adding partition wall in bathroom and adding a washer/dryer hookup and closet next to bathroom | $5,000 |
| Jan 11, 2018 | Completed final sign-off Sep 2018 | 1104 Noe St | connect extg 2nd floor with new stair create 2 bedrooms and 2 bathrooms at 1st floor. relocate kitchen, create open living space, remove hallway wall.Details
connect extg 2nd floor with new stair create 2 bedrooms and 2 bathrooms at 1st floor. relocate kitchen, create open living space, remove hallway wall. | $65,000 |
| Dec 27, 2017 | Completed final sign-off Dec 2018 | 738 Fell St | bathroom remodel: fixtures remain in same location. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5Details
bathroom remodel: fixtures remain in same location. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)5 | $15,000 |
| Nov 20, 2017 | Completed final sign-off Sep 2018 | 148 Marview Wy | ground floor addition for single familey dwelling: construct a family room with 1.5 bathroom in current garage and storage area.Details
ground floor addition for single familey dwelling: construct a family room with 1.5 bathroom in current garage and storage area. | $35,000 |
| Aug 8, 2017 | Completed final sign-off Jun 2018 | 162 College Av | relocate upper level dwelling unit. relocate bathroom, add bathroom, relocate kitchen. replace exterior cement plaster with (n) horizontal wood siding. new doors and window. new railing at terrace, seismic upgrades & framing upgradesDetails
relocate upper level dwelling unit. relocate bathroom, add bathroom, relocate kitchen. replace exterior cement plaster with (n) horizontal wood siding. new doors and window. new railing at terrace, seismic upgrades & framing upgrades | $60,000 |
| Jul 13, 2017 | Completed final sign-off Jan 2018 | 358 Los Palmos Dr | remodel bathroom on lower level, move toiklet 6in to left, other fixtures remain in same location. bathroom preexisting; constructin in 19725 under pa#366358&408518.Details
remodel bathroom on lower level, move toiklet 6in to left, other fixtures remain in same location. bathroom preexisting; constructin in 19725 under pa#366358&408518. | $15,000 |
| Jun 27, 2017 | Completed final sign-off Oct 2017 | 1735 16th Av | convert full bath to full bath and half bath. remodel bothDetails
convert full bath to full bath and half bath. remodel both | $20,000 |
| May 16, 2017 | Completed final sign-off Dec 2017 | 2255 Mariposa St | remodel (e) kitchen & add (n) bath on 1st floor. replace (e) deck & railing @ front of house. new window & sliding door at west elevation.Details
remodel (e) kitchen & add (n) bath on 1st floor. replace (e) deck & railing @ front of house. new window & sliding door at west elevation. | $35,000 |
| Mar 31, 2017 | Completed final sign-off Jul 2017 | 152 Lombard St | remove: replace shower pan, vanity and toilet. new tile surround and floor vanity, toilet and vanity top in bathroom. no walls moved, removed, added or installed. all layouts to remain unchanged.Details
remove: replace shower pan, vanity and toilet. new tile surround and floor vanity, toilet and vanity top in bathroom. no walls moved, removed, added or installed. all layouts to remain unchanged. | $7,000 |
| Jan 3, 2017 | Completed final sign-off Jan 2020 | 135 Webster St | horizontal addition to rear of property at 1st & 2nd level. renovation of (e) interior. addition includes (2) new bathrooms & (2) bedrooms. no change to existing garage.Details
horizontal addition to rear of property at 1st & 2nd level. renovation of (e) interior. addition includes (2) new bathrooms & (2) bedrooms. no change to existing garage. | $90,000 |
| Nov 16, 2016 | Completed final sign-off Jul 2017 | 157 Winfield St | bathroom and kitchen remodel, structural upgrades, walls removed and added within existing foot print, window in back sealed up, plumbing updated, lighting and electricity upgradedDetails
bathroom and kitchen remodel, structural upgrades, walls removed and added within existing foot print, window in back sealed up, plumbing updated, lighting and electricity upgraded | $100,000 |
| Aug 31, 2016 | Completed final sign-off Nov 2016 | 101 States St | replace kitchen counter top, add 2 cabinets. remodel (3) existing baths. no movement of fixtures.Details
replace kitchen counter top, add 2 cabinets. remodel (3) existing baths. no movement of fixtures. | $35,000 |
| Jul 25, 2016 | Completed final sign-off Dec 2016 | 57 Lundys Ln | renovate single family home - kitchen and bath remodel. replace 2 damaged windows (non-street facing)Details
renovate single family home - kitchen and bath remodel. replace 2 damaged windows (non-street facing) | $45,000 |
| Oct 23, 2015 | Completed final sign-off Jun 2016 | 1633 Oakdale Av | renovate existing cottage in the rear. remodel (1) kitchen, (1) full bathroom in kind. demo (e) lath & plaster, replace with (n) 5/8" sheetrock. no structural work under this permit. replacing finishes onlyDetails
renovate existing cottage in the rear. remodel (1) kitchen, (1) full bathroom in kind. demo (e) lath & plaster, replace with (n) 5/8" sheetrock. no structural work under this permit. replacing finishes only | $20,000 |
| Oct 8, 2015 | Completed final sign-off Mar 2016 | 15 Piedmont St | amend pa 2015-0921-7549 to remove wall, replace 2 property line windows at center fire-rated fixed windows, add bath, vanity & tub/shower. voluntary provide plywood walls, strong walls & holdwownDetails
amend pa 2015-0921-7549 to remove wall, replace 2 property line windows at center fire-rated fixed windows, add bath, vanity & tub/shower. voluntary provide plywood walls, strong walls & holdwown | $15,000 |
| Sep 21, 2015 | Completed final sign-off Mar 2016 | 15 Piedmont St | half bathroom remodel and kitchen remodel at same location, replace all fixtures. no new wall and no existing wall relocation. lighting in kitchen and bathroom remodel shall comply with cec 150.0(k)3 & 150.0(k)5 respectively.Details
half bathroom remodel and kitchen remodel at same location, replace all fixtures. no new wall and no existing wall relocation. lighting in kitchen and bathroom remodel shall comply with cec 150.0(k)3 & 150.0(k)5 respectively. | $25,000 |
| Sep 3, 2015 | Completed final sign-off Jun 2016 | 1633 Oakdale Av | 1) remodel bed rooms & bathrms and upgrade floor framing at 2nd floor. 2)construct one half bath room and install 2 footing at ground floor. 3)remove and replace extg interior stairscase with new. 4)construct 2 dormer on south side of extg slope roof.Details
1) remodel bed rooms & bathrms and upgrade floor framing at 2nd floor. 2)construct one half bath room and install 2 footing at ground floor. 3)remove and replace extg interior stairscase with new. 4)construct 2 dormer on south side of extg slope roof. | $54,000 |
| Aug 7, 2015 | Completed final sign-off Jun 2016 | 1633 Oakdale Av | demo (e) lath & plaster, replace with new 1/2" gyp board, remodel kitchen & bathroom, new cabinets, countertop, sink, tiles, toilet, vanity & bathtub, no structural work, comply with cec 150(k).Details
demo (e) lath & plaster, replace with new 1/2" gyp board, remodel kitchen & bathroom, new cabinets, countertop, sink, tiles, toilet, vanity & bathtub, no structural work, comply with cec 150(k). | $45,000 |
| Aug 4, 2015 | Completed final sign-off Oct 2015 | 7 Lee Av | revision to pa 2015 0312 0616 - add 1/2 bathDetails
revision to pa 2015 0312 0616 - add 1/2 bath | $5,000 |
| Jun 24, 2015 | Completed final sign-off Dec 2015 | 2370 North Point St | 1 kitchen and 1 bath remodel. non structuralDetails
1 kitchen and 1 bath remodel. non structural | $30,000 |
| Jun 3, 2015 | Completed final sign-off Oct 2015 | 936 Divisadero St | kitchen and bath remodel. replace window in kitchen, move door, enlarge door opening between kitchen and dining room. all work on 2nd flDetails
kitchen and bath remodel. replace window in kitchen, move door, enlarge door opening between kitchen and dining room. all work on 2nd fl | $40,000 |
| Mar 12, 2015 | Completed final sign-off Oct 2015 | 7 Lee Av | removal of portions of ground floor conc slab. repouring of slab & new footings. ocnstruction of 117 sq ft of new ocnditioned area below (e) extension. addition of new inteiror stair to connect floors. const. of new utility closet & master bedroom & full bath (suite) on ground floor.Details
removal of portions of ground floor conc slab. repouring of slab & new footings. ocnstruction of 117 sq ft of new ocnditioned area below (e) extension. addition of new inteiror stair to connect floors. const. of new utility closet & master bedroom & full bath (suite) on ground floor. | $50,000 |
| Feb 2, 2015 | Completed final sign-off May 2015 | 82 Parnassus Av | convert (e) close to new half bath on 2nd floor, relocate (e) closet to laundry. n/a maher ordinance; replace kitchen cabinet and countertop and also countertop in bathroom.Details
convert (e) close to new half bath on 2nd floor, relocate (e) closet to laundry. n/a maher ordinance; replace kitchen cabinet and countertop and also countertop in bathroom. | $10,000 |
| Dec 22, 2014 | Completed final sign-off Jan 2015 | 82 Parnassus Av | complyt w/nov 20148119 - new furnace system for unit #82 - bath & kitchen remodel per line 9 on bldg cc report for #80. n/a maher ordinance. no work on 84.Details
complyt w/nov 20148119 - new furnace system for unit #82 - bath & kitchen remodel per line 9 on bldg cc report for #80. n/a maher ordinance. no work on 84. | $15,000 |
| Jul 11, 2014 | Completed final sign-off May 2015 | 547 Natoma St | interior remodel. remove one interior wall and remodel existing kitchen and bathroom. maher n/a.Details
interior remodel. remove one interior wall and remodel existing kitchen and bathroom. maher n/a. | $30,000 |
| Jul 11, 2014 | Completed final sign-off Apr 2015 | 52 Russ St | interior remodel including removal of 1 wall and remodel existing kitchen an bathroom. add a new wahser and dryer. maher n/a.Details
interior remodel including removal of 1 wall and remodel existing kitchen an bathroom. add a new wahser and dryer. maher n/a. | $30,000 |
| Jul 11, 2014 | Completed final sign-off Apr 2015 | 549 Natoma St | interior remodel. remove one interior wall and remodel existing kitchen and bathroom. exterior windows to be replaced in kind. maher n/a.Details
interior remodel. remove one interior wall and remodel existing kitchen and bathroom. exterior windows to be replaced in kind. maher n/a. | $30,000 |
| Jul 11, 2014 | Completed final sign-off May 2015 | 50 Russ St | interior remodel. remove one interior wall and remodel existing kitchen and bathroom. add a new washer and dryer. maher n/a.Details
interior remodel. remove one interior wall and remodel existing kitchen and bathroom. add a new washer and dryer. maher n/a. | $30,000 |
| Mar 6, 2014 | Completed final sign-off Aug 2015 | 547 Natoma St | remodel kitchen and bathroom repair damaged sheetrock, new flooring, paint no walls being moved, removed or added, all layout to remain the same, no new opening no window no door, no disturbance of soilDetails
remodel kitchen and bathroom repair damaged sheetrock, new flooring, paint no walls being moved, removed or added, all layout to remain the same, no new opening no window no door, no disturbance of soil | $25,000 |
| Mar 6, 2014 | Completed final sign-off Aug 2015 | 48 Russ St | remodel kitchen and bathroom repair damaged sheetrock, new flooring, paint no walls being moved, removed or added, all layout to remain the same, no new opening no window no door, no disturbance of soilDetails
remodel kitchen and bathroom repair damaged sheetrock, new flooring, paint no walls being moved, removed or added, all layout to remain the same, no new opening no window no door, no disturbance of soil | $25,000 |
| Dec 24, 2013 | Completed final sign-off Jul 2014 | 1130 Shrader St | unit 2. interior remodel of a single dwelling unit in a 4 unit bldg work shall include converting the existing family room to bedrooms and an additional bathroom and partial opening of the floor to accomodate a new spiral stair.Details
unit 2. interior remodel of a single dwelling unit in a 4 unit bldg work shall include converting the existing family room to bedrooms and an additional bathroom and partial opening of the floor to accomodate a new spiral stair. | $40,000 |
| May 22, 2013 | Completed final sign-off Sep 2013 | 4442 18th St | renovation of an extg bathroom. new lighting and electrical, relocated plumbimg and new finishes.Details
renovation of an extg bathroom. new lighting and electrical, relocated plumbimg and new finishes. | $25,000 |
| Apr 1, 2013 | Completed final sign-off Aug 2013 | 649 Kansas St | remodel extg bathroom. add a partition wall and add additional toilet and sink. all in extg space of current bathroom.Details
remodel extg bathroom. add a partition wall and add additional toilet and sink. all in extg space of current bathroom. | $12,000 |
| Mar 18, 2013 | Completed final sign-off Sep 2013 | 742 Fell St | remodel 1 kitchen (new cabinets, counter appliances), remodel 2 bathrooms and 1 shower pan, remodel 2 half bathrooms. no structural. lighting for kitchen remodel per cec 150k, lighting for bathroom remodel per cec 150Details
remodel 1 kitchen (new cabinets, counter appliances), remodel 2 bathrooms and 1 shower pan, remodel 2 half bathrooms. no structural. lighting for kitchen remodel per cec 150k, lighting for bathroom remodel per cec 150 | $50,000 |
| Mar 6, 2013 | Completed final sign-off Nov 2013 | 1275 Bay St | #1275- amendment to pa#201209058997 additionally remove & replace cabinets in top floor kitchen, remodel additional bathroom in top floor.Details
#1275- amendment to pa#201209058997 additionally remove & replace cabinets in top floor kitchen, remodel additional bathroom in top floor. | $5,000 |
| Jan 25, 2012 | Completed final sign-off Jun 2012 | 1424 Page St | remodel kitchen & half bathroom on first floor, new finishes & lighting.Details
remodel kitchen & half bathroom on first floor, new finishes & lighting. | $40,000 |
| Nov 5, 2010 | Completed final sign-off Oct 2011 | 2372 North Point St | new master br at existing in-law ground floor remodel kitchen and baths lower unitDetails
new master br at existing in-law ground floor remodel kitchen and baths lower unit | $104,000 |