Darc Ventures Inc Dba Spl Construction S
- Based in
- San Francisco
- On San Francisco permits
- Nov 2010 to Sep 2026
- Last 24 months
- 16 permits filed
148 permits since 2000: 138 completed, 4 in progress, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
16 stairs permits: 15 completed, 1 in progress. Typically 20 days from filing to permit and 159 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2026 | In progress issued Apr 2026 | 89 Ventura Av | new interior stair to replace existing stair in same general location. project adds a shower to existing 1/f bathroom.Details
new interior stair to replace existing stair in same general location. project adds a shower to existing 1/f bathroom. | $50,000 |
| Mar 31, 2022 | Completed final sign-off Apr 2024 | 80 Ventura Av | revision to pa#202009214643. elevator shaft has increased by 10" to the east and stairs have been adjusted for revised elevator door location.Details
revision to pa#202009214643. elevator shaft has increased by 10" to the east and stairs have been adjusted for revised elevator door location. | |
| Oct 29, 2020 | Completed final sign-off Jun 2021 | 127 Gambier St | interior renovation of (e) kitchen, dining room & bathroom. additional bathroom created within (e) envelope. (e) back deck stairs to remain unchanged.Details
interior renovation of (e) kitchen, dining room & bathroom. additional bathroom created within (e) envelope. (e) back deck stairs to remain unchanged. | $70,000 |
| Oct 10, 2020 | Completed final sign-off Jan 2024 | 2958 Scott St | interior improvement. provide 1-hr rating at garage, (n) lighting, enlarge garage door. lightwell infill at basement level north side, lightwell infill at 2nd & 1st flr south side against blank wall of adjacent building. replace interior stair.Details
interior improvement. provide 1-hr rating at garage, (n) lighting, enlarge garage door. lightwell infill at basement level north side, lightwell infill at 2nd & 1st flr south side against blank wall of adjacent building. replace interior stair. | $80,000 |
| Sep 21, 2020 | Completed final sign-off Apr 2024 | 80 Ventura Av | new interior stair and elevator being added at entry. exterior staircase and cupola being removed at entry. deck being replaced, expanded and redesigned at rear. both bathrooms being remodeled at 3rd floor.Details
new interior stair and elevator being added at entry. exterior staircase and cupola being removed at entry. deck being replaced, expanded and redesigned at rear. both bathrooms being remodeled at 3rd floor. | $150,000 |
| Dec 16, 2019 | Completed final sign-off Mar 2021 | 1370 Webster St | add full bath to lower level and spiral stair to access level. convert (e) storage space to new living room in basementDetails
add full bath to lower level and spiral stair to access level. convert (e) storage space to new living room in basement | $20,000 |
| May 9, 2019 | Completed final sign-off Jan 2020 | 95 Ventura Av | upper fl - new kitchen in (e) location, (n) intertal stair & (n) master bathroom; 1st fl - new bathroom fixtures & finishes, relocated laundry. new fau & water heater. project will not expand (e) bldg envelope or alter (e) facadeDetails
upper fl - new kitchen in (e) location, (n) intertal stair & (n) master bathroom; 1st fl - new bathroom fixtures & finishes, relocated laundry. new fau & water heater. project will not expand (e) bldg envelope or alter (e) facade | $100,000 |
| Oct 17, 2018 | Completed final sign-off Jan 2019 | 1370 Webster St | repair rear deck less than 50% front stair framing less than 50% no other work.Details
repair rear deck less than 50% front stair framing less than 50% no other work. | $10,000 |
| Jan 11, 2018 | Completed final sign-off Sep 2018 | 1104 Noe St | connect extg 2nd floor with new stair create 2 bedrooms and 2 bathrooms at 1st floor. relocate kitchen, create open living space, remove hallway wall.Details
connect extg 2nd floor with new stair create 2 bedrooms and 2 bathrooms at 1st floor. relocate kitchen, create open living space, remove hallway wall. | $65,000 |
| Mar 12, 2015 | Completed final sign-off Oct 2015 | 7 Lee Av | removal of portions of ground floor conc slab. repouring of slab & new footings. ocnstruction of 117 sq ft of new ocnditioned area below (e) extension. addition of new inteiror stair to connect floors. const. of new utility closet & master bedroom & full bath (suite) on ground floor.Details
removal of portions of ground floor conc slab. repouring of slab & new footings. ocnstruction of 117 sq ft of new ocnditioned area below (e) extension. addition of new inteiror stair to connect floors. const. of new utility closet & master bedroom & full bath (suite) on ground floor. | $50,000 |
| Jan 26, 2015 | Completed final sign-off Mar 2015 | 353 03rd Av | comply with cc 7747 excluding item 2, and add 6 skylights to 353 3rd ave.; item 1 front stair repair less than 50%; (a separate permit will be submitted for item 2 for ground floor walls & second mean of egress removal).Details
comply with cc 7747 excluding item 2, and add 6 skylights to 353 3rd ave.; item 1 front stair repair less than 50%; (a separate permit will be submitted for item 2 for ground floor walls & second mean of egress removal). | $12,500 |
| Aug 26, 2014 | Completed final sign-off Feb 2015 | 2035 Greenwich St | backyard cement and firepit. repair rear stairs and railing. repair retaining wall and rear fence. add rear benchDetails
backyard cement and firepit. repair rear stairs and railing. repair retaining wall and rear fence. add rear bench | $30,000 |
| Aug 14, 2014 | Completed final sign-off Jan 2015 | 288 Moulton St | remodel including the removal of an interior stair & closet, patching floor & ceiling & minimal electrical work. no work with the two means of exits.Details
remodel including the removal of an interior stair & closet, patching floor & ceiling & minimal electrical work. no work with the two means of exits. | $20,000 |
| Dec 24, 2013 | Completed final sign-off Jul 2014 | 1130 Shrader St | unit 2. interior remodel of a single dwelling unit in a 4 unit bldg work shall include converting the existing family room to bedrooms and an additional bathroom and partial opening of the floor to accomodate a new spiral stair.Details
unit 2. interior remodel of a single dwelling unit in a 4 unit bldg work shall include converting the existing family room to bedrooms and an additional bathroom and partial opening of the floor to accomodate a new spiral stair. | $40,000 |
| Aug 10, 2012 | Completed final sign-off Dec 2012 | 282 Moulton St | interior remodel of condo at 282 moulton street, addition of a new bedroom & closet space @ the 2nd floor & new electrical / lighting in the kitchen & new bedroom. infill of stair opening & removal of circular staircase.Details
interior remodel of condo at 282 moulton street, addition of a new bedroom & closet space @ the 2nd floor & new electrical / lighting in the kitchen & new bedroom. infill of stair opening & removal of circular staircase. | $25,000 |
| Jun 18, 2012 | Completed final sign-off Aug 2012 | 3923 Sacramento St | to comply with physical inspection report #cc-7073. to legalize the two sinks and proposed/existing opening per plans. repair rear stair landing, less than 50%. electrical & plumbing corrections to comply with inspection.Details
to comply with physical inspection report #cc-7073. to legalize the two sinks and proposed/existing opening per plans. repair rear stair landing, less than 50%. electrical & plumbing corrections to comply with inspection. | $10,000 |