All Homes And Construction Inc
- Based in
- San Gabriel
- On San Francisco permits
- Dec 2019 to Jun 2026
- Last 24 months
- 21 permits filed
71 permits since 2000: 61 completed, 5 in progress, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 15, 2026 | In progress issued Jul 2026 | 68 Castro St | revision to (e) permit#202601204134: encapturing the dead space and the 3rd floor and incorporation that into the new bathroom layout. no vertical addition.Details
revision to (e) permit#202601204134: encapturing the dead space and the 3rd floor and incorporation that into the new bathroom layout. no vertical addition. | $15,000 |
| Jun 9, 2026 | In progress issued Jun 2026 | 2537 Pacheco St | new wood siding on right side of the property, match existing.Details
new wood siding on right side of the property, match existing. | $5,000 |
| Jun 5, 2026 | Completed final sign-off Jun 2026 | 1221 Taraval St | repair rear stairs and deck less than 50% in-kind. (not visible from the street)Details
repair rear stairs and deck less than 50% in-kind. (not visible from the street) | $6,000 |
| Apr 10, 2026 | In progress issued Sep 2026 | 69 Montcalm St | 1st fl: add 1 bed,1 full bath and laundry.2nd fl: reconfigure(e) living, kitchen & bath & bedroom per layout. 3rd fl:remodel (e)bedroom & add 1 full bath.add new roof decks @ rear,replace front stairs railing with in kind(wood)add 3 dormers,replace all windows in kind.Details
1st fl: add 1 bed,1 full bath and laundry.2nd fl: reconfigure(e) living, kitchen & bath & bedroom per layout. 3rd fl:remodel (e)bedroom & add 1 full bath.add new roof decks @ rear,replace front stairs railing with in kind(wood)add 3 dormers,replace all windows in kind. | $380,000 |
| Feb 25, 2026 | In progress issued Feb 2026 | 350 Athens St | recommencement and completion of work approved under pa# 201704073455 and 201705267784. to comply with nov# 201787501.Details
recommencement and completion of work approved under pa# 201704073455 and 201705267784. to comply with nov# 201787501. | |
| Jan 20, 2026 | In progress issued Feb 2026 | 68 Castro St | remodel the kitchen and remove bearing wall on 2nd floor. remodel the bathroom and new plan configuration on the 3rd floor. interior remodel only.Details
remodel the kitchen and remove bearing wall on 2nd floor. remodel the bathroom and new plan configuration on the 3rd floor. interior remodel only. | $100,000 |
| Dec 18, 2025 | Completed final sign-off Aug 2026 | 553 Laidley St | revision to pa #202407297473: add 16" high roof curb at new addition roof area.Details
revision to pa #202407297473: add 16" high roof curb at new addition roof area. | $1,500 |
| Sep 8, 2025 | Completed final sign-off Dec 2025 | 4040 Ortega St | revision to 202506128554: replace front windows & new facade. new deck at rearDetails
revision to 202506128554: replace front windows & new facade. new deck at rear | $6,500 |
| Aug 18, 2025 | Completed final sign-off May 2026 | 1223 Taraval St | commercial space: 1st/f add ada bathroom & ada door button (within property line)Details
commercial space: 1st/f add ada bathroom & ada door button (within property line) | $16,000 |
| Jul 4, 2025 | Completed final sign-off Dec 2025 | 118 Trumbull St | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $27,500 |
| Jun 12, 2025 | Completed final sign-off Dec 2025 | 4040 Ortega St | 1/f: add 1 bedroom with full bath. relocate laundry and utilities. 2/f: remodel (e) kitchen and bathroom.Details
1/f: add 1 bedroom with full bath. relocate laundry and utilities. 2/f: remodel (e) kitchen and bathroom. | $100,000 |
| Jun 4, 2025 | Completed final sign-off Dec 2025 | 2629 San Jose Av | 1/f: add 1 bedroom and 1 full bath. 2/f: remodel (e) kitchen, bathroom, and 2 bedrooms. new deck at rear.Details
1/f: add 1 bedroom and 1 full bath. 2/f: remodel (e) kitchen, bathroom, and 2 bedrooms. new deck at rear. | $120,000 |
| May 23, 2025 | Completed final sign-off Oct 2025 | 681 Brunswick St | revision to bpa# 202407297474 replace front windows with vinyl windowsDetails
revision to bpa# 202407297474 replace front windows with vinyl windows | |
| Mar 25, 2025 | Completed final sign-off Aug 2026 | 553 Laidley St | 1/f: add (2) bedrooms, 2 full baths and media. 2/f: remodel kitchen, bedroom, and bathroom. and powder room. enclose 1 garage door and remove curb cut. replace other garage door w/ wood. replace windows at facade with alum clad wood.Details
1/f: add (2) bedrooms, 2 full baths and media. 2/f: remodel kitchen, bedroom, and bathroom. and powder room. enclose 1 garage door and remove curb cut. replace other garage door w/ wood. replace windows at facade with alum clad wood. | $180,000 |
| Mar 25, 2025 | Completed final sign-off May 2025 | 423 Victoria St | to comply w/ complaint# 202535583: replace (2) front windows in kind with alum-clad wood. u=0.3maxDetails
to comply w/ complaint# 202535583: replace (2) front windows in kind with alum-clad wood. u=0.3max | $1,000 |
| Mar 12, 2025 | Completed final sign-off Mar 2025 | 423 Victoria St | new concrete landscape and permeable surface @ front setback within property lineDetails
new concrete landscape and permeable surface @ front setback within property line | $3,000 |
| Mar 8, 2025 | Completed final sign-off Jun 2025 | 22 Chicago Wy | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $52,500 |
| Mar 7, 2025 | Completed final sign-off May 2025 | 260 Curtis St | replace siding at rear. about 1000 sq ft. not visible from streetDetails
replace siding at rear. about 1000 sq ft. not visible from street | $2,500 |
| Feb 4, 2025 | Completed final sign-off Aug 2026 | 230 Urbano Dr | comply with nov# 202173953. 1st floor: add adu per government code section 65852.2. add 1 great room and office.Details
comply with nov# 202173953. 1st floor: add adu per government code section 65852.2. add 1 great room and office. | $35,000 |
| Dec 2, 2024 | Completed final sign-off Feb 2025 | 423 Victoria St | to comply with nov 202306592. 1/f: add 1 bedroom, 1 full bath and rolocate laundry. 2/f: total remodel - family, dining, kitchen, 2 bedrooms and 1 full bath. new deck at rear. replace siding at rear. replace front metal railing in kind.Details
to comply with nov 202306592. 1/f: add 1 bedroom, 1 full bath and rolocate laundry. 2/f: total remodel - family, dining, kitchen, 2 bedrooms and 1 full bath. new deck at rear. replace siding at rear. replace front metal railing in kind. | $75,000 |
| Oct 24, 2024 | Completed final sign-off May 2025 | 260 Curtis St | 1st fl: add 1 full bath; 2nd fl: total remodel, add 1 master bathroom. new patio at rear. repair front stair less than 50% comply wtih complaint #201960681 (#2)Details
1st fl: add 1 full bath; 2nd fl: total remodel, add 1 master bathroom. new patio at rear. repair front stair less than 50% comply wtih complaint #201960681 (#2) | $100,000 |
| Oct 1, 2024 | Completed final sign-off Oct 2024 | 818 Silliman St | revision to pa 2024-0529-3225 replace siding and replace door at frontDetails
revision to pa 2024-0529-3225 replace siding and replace door at front | $2,500 |
| Jul 29, 2024 | Completed final sign-off Oct 2025 | 681 Brunswick St | 1st fl. add 1 bedroom, family, 2 full baths 2nd fl. remodel (e) kitchen and bathroom, add 1 bedroom, & 1 full bath replace front windows in-kind new sky lights. infill lightwell. add stairs at rear (e) deck.Details
1st fl. add 1 bedroom, family, 2 full baths 2nd fl. remodel (e) kitchen and bathroom, add 1 bedroom, & 1 full bath replace front windows in-kind new sky lights. infill lightwell. add stairs at rear (e) deck. | $170,000 |
| Jul 18, 2024 | Completed final sign-off Oct 2024 | 284 Jules Av | 2/f: revision to permit 202405222733. reconfigure kitchen layout and one new skylight.Details
2/f: revision to permit 202405222733. reconfigure kitchen layout and one new skylight. | |
| Jul 11, 2024 | Completed final sign-off Apr 2025 | 2250 44th Av | 1/f: add 1 bedroom, 1.5 bath, family room and laundry; 2/f: remodel kitchen and bathroom, add 1.5 bath, relocated interior stairs, 2-story rear addition, comply with nov 202424706.Details
1/f: add 1 bedroom, 1.5 bath, family room and laundry; 2/f: remodel kitchen and bathroom, add 1.5 bath, relocated interior stairs, 2-story rear addition, comply with nov 202424706. | $120,000 |
| Jul 5, 2024 | Completed final sign-off Jan 2025 | 44 Bonview St | revision to pa# 2021-1108-2034 2nd fl: family room change accordion-type to sliding door 3rd fl: remove proposed kitchen skylight, change rear guard railing to metal.Details
revision to pa# 2021-1108-2034 2nd fl: family room change accordion-type to sliding door 3rd fl: remove proposed kitchen skylight, change rear guard railing to metal. | |
| May 29, 2024 | Completed final sign-off Oct 2024 | 818 Silliman St | attic: add new bedroom, den and bathroom.2/f: remodel kitchen& bathroom. add new deck at side and new dormers. replace all windows in-kind 2/f. (with alum. clad wood for front windows)Details
attic: add new bedroom, den and bathroom.2/f: remodel kitchen& bathroom. add new deck at side and new dormers. replace all windows in-kind 2/f. (with alum. clad wood for front windows) | $150,000 |
| May 22, 2024 | Completed final sign-off Oct 2024 | 284 Jules Av | 2nd fl - kitchen & bathroom remodel; resize (e) bedrooms; 1 new den room. replace 4 front windows in kind with aluminum clad wood.Details
2nd fl - kitchen & bathroom remodel; resize (e) bedrooms; 1 new den room. replace 4 front windows in kind with aluminum clad wood. | $68,000 |
| May 22, 2024 | Completed final sign-off Aug 2024 | 118 Gold Mine Dr | remodel kitchen (90sqft) in-kind. and 2 baths (75sqft) in kind. replace 4 rear windows and sliding door in kind. repair front, sides and rear siding in kind (120 sq ft.), less that 50% repair deck less than 50% replace fence 6" tall. new sheetrock 5/8' typx in garage (13'x 25').Details
remodel kitchen (90sqft) in-kind. and 2 baths (75sqft) in kind. replace 4 rear windows and sliding door in kind. repair front, sides and rear siding in kind (120 sq ft.), less that 50% repair deck less than 50% replace fence 6" tall. new sheetrock 5/8' typx in garage (13'x 25'). | $90,000 |
| May 1, 2024 | Completed final sign-off May 2024 | 255 Prague St | 1st fl. add 1 full bath. 2nd fl. remodel kitchen and bathroom. add 1 ful bathDetails
1st fl. add 1 full bath. 2nd fl. remodel kitchen and bathroom. add 1 ful bath | $45,000 |
| Apr 17, 2024 | Completed final sign-off Jun 2024 | 1743 39th Av | refernce pa# 2024-0319-8178 replace sheetrock throughout house. replace with 5/8" type x.Details
refernce pa# 2024-0319-8178 replace sheetrock throughout house. replace with 5/8" type x. | $5,000 |
| Mar 19, 2024 | Completed final sign-off Jun 2024 | 1743 39th Av | 1st floor: relocated laundry. 2nd floor ((e) kitchen & bathroom remodel. new deck @ rearDetails
1st floor: relocated laundry. 2nd floor ((e) kitchen & bathroom remodel. new deck @ rear | $35,000 |
| Jan 10, 2024 | Completed final sign-off Sep 2024 | 277 Carl St | recommencement and completion of work approved under pa# 201609299125. 40% of work remaining.Details
recommencement and completion of work approved under pa# 201609299125. 40% of work remaining. | |
| Apr 5, 2023 | Completed final sign-off Jul 2024 | 518 Gennessee St | revision to pa# 202203039188, 2nd flr deck- change railing material to glass from wood.Details
revision to pa# 202203039188, 2nd flr deck- change railing material to glass from wood. | |
| Mar 29, 2023 | Completed final sign-off Nov 2023 | 427 Huron Av | to comply with nov 202056567 front of the property. new planter & permeable surface. to encroach garbage & enclosure & fenceDetails
to comply with nov 202056567 front of the property. new planter & permeable surface. to encroach garbage & enclosure & fence | $500 |
| Dec 30, 2022 | Completed final sign-off Mar 2024 | 1610 38th Av | 1) 1/f: add 1 den, media and 2 full baths. 2) 2/f: remodel (e) kitchen, bathroom add 1 full bathroom, laundry.Details
1) 1/f: add 1 den, media and 2 full baths. 2) 2/f: remodel (e) kitchen, bathroom add 1 full bathroom, laundry. | $90,000 |
| Dec 13, 2022 | Completed final sign-off Jul 2024 | 518 Gennessee St | revision to bpa# 202211186969: new siding over existing siding within property line: schedule inspection at start of work.Details
revision to bpa# 202211186969: new siding over existing siding within property line: schedule inspection at start of work. | |
| Nov 18, 2022 | Completed final sign-off Jul 2024 | 518 Gennessee St | replace existing siding on the south side of property in-kind. 350 sf. (wood in kind)Details
replace existing siding on the south side of property in-kind. 350 sf. (wood in kind) | $3,500 |
| Sep 14, 2022 | Completed final sign-off Jan 2024 | 2426 24th Av | 1/f: add 2 bedroom, family room and 2 bathrooms. 2/f: remodel kitchen, bathroom. add 1 full bath and new deck. infill at rear.Details
1/f: add 2 bedroom, family room and 2 bathrooms. 2/f: remodel kitchen, bathroom. add 1 full bath and new deck. infill at rear. | $120,000 |
| Jun 24, 2022 | Completed final sign-off May 2023 | 2687 37th Av | 1st fl: add 1 den, family room, media and 1 full bath. 2nd fl: remodel kitchen, bathroom, add 1 full bath. infill lightwellDetails
1st fl: add 1 den, family room, media and 1 full bath. 2nd fl: remodel kitchen, bathroom, add 1 full bath. infill lightwell | $125,000 |
| May 25, 2022 | Completed final sign-off Jun 2022 | 70 Justin Dr | front stairs dryrot repair. less than 50%.Details
front stairs dryrot repair. less than 50%. | $500 |
| May 10, 2022 | Completed final sign-off Oct 2022 | 2049 15th Av | replace front stucco in-kind less than 50% approx 100sf.Details
replace front stucco in-kind less than 50% approx 100sf. | $2,000 |
| Apr 20, 2022 | Completed final sign-off Mar 2023 | 2227 Bryant St | replace all rear windows (29 total) not visible from the street and require sheetrock at stairs (about 500 sf) u=.30maxDetails
replace all rear windows (29 total) not visible from the street and require sheetrock at stairs (about 500 sf) u=.30max | $5,000 |
| Mar 3, 2022 | Completed final sign-off Jul 2024 | 518 Gennessee St | 1st floor: add 1 den, family, bedroom, and 2 full bath. 2/f: remodel kitchen, bathroom. add 1 full bath in fill lightwell. replace front windows with in kind wood. add new deck. replace front stairs in kind.Details
1st floor: add 1 den, family, bedroom, and 2 full bath. 2/f: remodel kitchen, bathroom. add 1 full bath in fill lightwell. replace front windows with in kind wood. add new deck. replace front stairs in kind. | $150,000 |
| Feb 22, 2022 | Completed final sign-off Apr 2022 | 581 Laidley St | rev to pa202106293455. reconfigure patio size per layout plans. to comply with complaint 20228668 & 2000231349 & 200231264.Details
rev to pa202106293455. reconfigure patio size per layout plans. to comply with complaint 20228668 & 2000231349 & 200231264. | $3,500 |
| Jan 6, 2022 | Completed final sign-off Mar 2023 | 2227 Bryant St | 2227 bryant - remodel kitchen (144 sf) & 2 bathrooms (80 sf) in-kind. 2229 bryant - remodel kitchen (144 sf) & 1 bathroom (40 sf) in-kind. no change in layouts and walls. repair rear deck (less than 50%).Details
2227 bryant - remodel kitchen (144 sf) & 2 bathrooms (80 sf) in-kind. 2229 bryant - remodel kitchen (144 sf) & 1 bathroom (40 sf) in-kind. no change in layouts and walls. repair rear deck (less than 50%). | $65,000 |
| Nov 8, 2021 | Completed final sign-off Jan 2025 | 44 Bonview St | comply w/ nov #202038632 #201908141: develop decks 1/f, 2/f, 3/f rear within the buildable area of lot & develop 132 gsf new habitable space within (e) built envelope. remove cantilevered room constructed w/o permit & correct other unpermitted interior alterations. abates complaint # 2020-005940enfDetails
comply w/ nov #202038632 #201908141: develop decks 1/f, 2/f, 3/f rear within the buildable area of lot & develop 132 gsf new habitable space within (e) built envelope. remove cantilevered room constructed w/o permit & correct other unpermitted interior alterations. abates complaint # 2020-005940enf | $100,000 |
| Nov 3, 2021 | Never finaled issued Nov 2021, no final | 44 Bache St | repair front stucco; 1st fl - add family room, 1 bedroom, 1 full bath; 2nd fl - remodel kitchen, bathroom, add roof deck @ rear; attic - add 1 bedroom, 1 full bath; reconfigure interior stairs. replace front windows in-kind.Details
repair front stucco; 1st fl - add family room, 1 bedroom, 1 full bath; 2nd fl - remodel kitchen, bathroom, add roof deck @ rear; attic - add 1 bedroom, 1 full bath; reconfigure interior stairs. replace front windows in-kind. | $110,000 |
| Sep 24, 2021 | Completed final sign-off Mar 2022 | 70 Justin Dr | revision to pa# 202103196936. alter 3 windows location & size. reconfigure closet and bathroom location at 2/fDetails
revision to pa# 202103196936. alter 3 windows location & size. reconfigure closet and bathroom location at 2/f | $2,000 |
| Sep 10, 2021 | Completed final sign-off Jun 2023 | 2049 15th Av | basement: add 2 bedroom, and full bath. 1/f: relocate kitchen, add great room and half bath. 2/f: remodel bedrooms & bathroom. add 2 bedroom, 2 full bath and loft, repair rear siding. add cantinver deck and patio.Details
basement: add 2 bedroom, and full bath. 1/f: relocate kitchen, add great room and half bath. 2/f: remodel bedrooms & bathroom. add 2 bedroom, 2 full bath and loft, repair rear siding. add cantinver deck and patio. | $180,000 |
| Aug 20, 2021 | Completed final sign-off May 2022 | 1351 40th Av | 1/f: add 2 bedrooms, 2 full bathrooms, media & laundry. 2/f: remodel kitchen and bathroom, add home office and 1 full bathroom. add cantilever deck & patio.Details
1/f: add 2 bedrooms, 2 full bathrooms, media & laundry. 2/f: remodel kitchen and bathroom, add home office and 1 full bathroom. add cantilever deck & patio. | $150,000 |
| Jul 15, 2021 | Completed final sign-off Nov 2021 | 162 Byxbee St | 1st floor: add 1 bedroom, full bath, family and home office. 2nd floor: remodel kitchen and bathroom.Details
1st floor: add 1 bedroom, full bath, family and home office. 2nd floor: remodel kitchen and bathroom. | $70,000 |
| Jun 29, 2021 | Completed final sign-off Apr 2022 | 581 Laidley St | comply w/ nov 200231264 & 200231349: 1st fl add bedroom, family rm, media, 2 full baths, and patio at rear. 2nd floor: remodel kit & bath, add deck at rear. reconfigure interior stairs. repair front stairs in kind (<50%) new wood siding at front, new hardi plank siding at rear. replace front windowsDetails
comply w/ nov 200231264 & 200231349: 1st fl add bedroom, family rm, media, 2 full baths, and patio at rear. 2nd floor: remodel kit & bath, add deck at rear. reconfigure interior stairs. repair front stairs in kind (<50%) new wood siding at front, new hardi plank siding at rear. replace front windows | $120,000 |
| Jun 17, 2021 | Completed final sign-off Jun 2021 | 1971 21st Av | replace 2 windows at front kin-kind with aluminium. rpelace garage door and repair shingles at front.Details
replace 2 windows at front kin-kind with aluminium. rpelace garage door and repair shingles at front. | $2,000 |
| May 21, 2021 | Completed final sign-off Mar 2022 | 867 27th Av | revision to pa# 202008182052. 1st flr: add 3 bedrooms, 3 full bath, family and laundry. 2nd flr: remodel kitchen & bathroom. add 1.5 bath. new roof deck. repair front stairs in kind less than 50% and repair stucco as needed.Details
revision to pa# 202008182052. 1st flr: add 3 bedrooms, 3 full bath, family and laundry. 2nd flr: remodel kitchen & bathroom. add 1.5 bath. new roof deck. repair front stairs in kind less than 50% and repair stucco as needed. | $150,000 |
| May 20, 2021 | Completed final sign-off Jan 2023 | 1863 40th Av | 1st fl: add 2 bedrooms, 1 media and 1 full bath. 2nd floor: remodel kitchen and bath and add 1 full bath. new deck at rear, 3 new skylights.Details
1st fl: add 2 bedrooms, 1 media and 1 full bath. 2nd floor: remodel kitchen and bath and add 1 full bath. new deck at rear, 3 new skylights. | $88,000 |
| Mar 19, 2021 | Completed final sign-off Mar 2022 | 70 Justin Dr | 1st floor: add 2 bedrooms, 1.5 bath family and laundry. 2nd floor: remodel kitchen and bathroom. add 1 full bath. add patio at rear. relocate interior stairs.Details
1st floor: add 2 bedrooms, 1.5 bath family and laundry. 2nd floor: remodel kitchen and bathroom. add 1 full bath. add patio at rear. relocate interior stairs. | $95,000 |
| Mar 2, 2021 | Expired or cancelled cancelled Oct 2021 | 70 Justin Dr | remodel kitchen (107sf) and 1 bath (80 sf) in kind. no change in walls and layout.Details
remodel kitchen (107sf) and 1 bath (80 sf) in kind. no change in walls and layout. | $15,000 |
| Feb 9, 2021 | Completed final sign-off Apr 2021 | 1755 39th Av | remodel kitchen (205 sf) and 1 bathroom (42 sf) in kind. no change on walls & layout.Details
remodel kitchen (205 sf) and 1 bathroom (42 sf) in kind. no change on walls & layout. | $38,000 |
| Jan 25, 2021 | Completed final sign-off Jun 2021 | 1971 21st Av | remodel (e) kitchen & bathroom in-kind. no change of layout and walls.Details
remodel (e) kitchen & bathroom in-kind. no change of layout and walls. | $20,000 |
| Jan 7, 2021 | Completed final sign-off Jul 2021 | 2149 17th Av | dbi complaint 202070271: 1/f: add 1 bedroom, 1.5 full bath and family room. 2/f: remodel kitchen, bath and dining and add 1 full bath. new courtyard and relocate staircase.Details
dbi complaint 202070271: 1/f: add 1 bedroom, 1.5 full bath and family room. 2/f: remodel kitchen, bath and dining and add 1 full bath. new courtyard and relocate staircase. | $55,000 |
| Nov 6, 2020 | Expired or cancelled cancelled Apr 2021 | 2149 17th Av | remodel kitchen (120 sq ft) & 2 baths (40 sf & 50sf) no change in layout of walls and openings.Details
remodel kitchen (120 sq ft) & 2 baths (40 sf & 50sf) no change in layout of walls and openings. | $50,000 |
| Oct 3, 2020 | Completed final sign-off May 2021 | 2022 10th Av | infill under 1-story less than 12ft in height and small lightwell infill on 2/f.reconfigure interior staircase and propose 3 new bathrooms and 2 bedrooms on g/f. relocate laundry & w/h per plan.Details
infill under 1-story less than 12ft in height and small lightwell infill on 2/f.reconfigure interior staircase and propose 3 new bathrooms and 2 bedrooms on g/f. relocate laundry & w/h per plan. | $120,000 |
| Sep 24, 2020 | Completed final sign-off Jan 2021 | 67 Montana St | 1/f: add 1 bedroom and 1 full bathroom, shift foyer wall forward. 2/f: remodel (e) kitchen & bedroom, add 1 new skylight.Details
1/f: add 1 bedroom and 1 full bathroom, shift foyer wall forward. 2/f: remodel (e) kitchen & bedroom, add 1 new skylight. | $60,000 |
| Sep 2, 2020 | Completed final sign-off May 2021 | 2022 10th Av | rearrange (e) bathroom on 2nd flr. add new bath on 2nd flr. replace plaster in livingrm and bedrms in-kind. repair interior stair case less than 50%-repair in-kind. remodel (e) kitchen per planDetails
rearrange (e) bathroom on 2nd flr. add new bath on 2nd flr. replace plaster in livingrm and bedrms in-kind. repair interior stair case less than 50%-repair in-kind. remodel (e) kitchen per plan | $88,000 |
| Aug 18, 2020 | Expired or cancelled withdrawn Sep 2020 | 67 Montana St | g/f; add 1 bedrm and 1 full bath, shift foyer wall forwa. 2nd fl; remodel kitchen and bedrm, 1 new skylight.Details
g/f; add 1 bedrm and 1 full bath, shift foyer wall forwa. 2nd fl; remodel kitchen and bedrm, 1 new skylight. | $60,000 |
| Aug 12, 2020 | Completed final sign-off Jan 2021 | 1547 20th Av | revision to 201912190088, add new cantilever deck at rear. remove office at basementDetails
revision to 201912190088, add new cantilever deck at rear. remove office at basement | $8,000 |
| Jul 16, 2020 | Completed final sign-off Jan 2021 | 67 Montana St | remodel kitchen and bathDetails
remodel kitchen and bath | $25,000 |
| Feb 21, 2020 | Expired or cancelled revoked Mar 2024 | 44 Bonview St | comply nov 201905750 & 201908141, legalize, (e) storage to habitable w/ (n) internal stair; (n) retaining wall @ rear & lower fl, infill (e) lightwell; minor change on g/f & 2/f; lower fl (n) bed, bath, media room; replace windows in kind: front w/ wood clad & rear w/ alum; rebuild 2nd deck in kind.Details
comply nov 201905750 & 201908141, legalize, (e) storage to habitable w/ (n) internal stair; (n) retaining wall @ rear & lower fl, infill (e) lightwell; minor change on g/f & 2/f; lower fl (n) bed, bath, media room; replace windows in kind: front w/ wood clad & rear w/ alum; rebuild 2nd deck in kind. | $160,100 |
| Jan 3, 2020 | Completed final sign-off Dec 2022 | 242 Holloway Av | legalize (e) unit per ord no. 43-14; (n) fire sprinkler under separate permit. alter (e) bathrooms and propose two (n) bedrooms and bathrooms. repair (e) deck stairs in kind. voluntary seismic upgrade. comply with landscape front setback.Details
legalize (e) unit per ord no. 43-14; (n) fire sprinkler under separate permit. alter (e) bathrooms and propose two (n) bedrooms and bathrooms. repair (e) deck stairs in kind. voluntary seismic upgrade. comply with landscape front setback. | $50,000 |
| Dec 19, 2019 | Completed final sign-off Jan 2021 | 1547 20th Av | basement: add 1 bedroom, 1 office, 2 full baths, media and laundry. 1st floor total remodel, add 1 full bath, and stairs to basement. new windows in kind with aluminum clad wood windows.Details
basement: add 1 bedroom, 1 office, 2 full baths, media and laundry. 1st floor total remodel, add 1 full bath, and stairs to basement. new windows in kind with aluminum clad wood windows. | $130,000 |