All Homes And Construction Inc
- Based in
- San Gabriel
- On San Francisco permits
- Dec 2019 to Jun 2026
- Last 24 months
- 21 permits filed
71 permits since 2000: 61 completed, 5 in progress, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
18 stairs permits: 15 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 19 days from filing to permit and 282 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2026 | Completed final sign-off Jun 2026 | 1221 Taraval St | repair rear stairs and deck less than 50% in-kind. (not visible from the street)Details
repair rear stairs and deck less than 50% in-kind. (not visible from the street) | $6,000 |
| Apr 10, 2026 | In progress issued Sep 2026 | 69 Montcalm St | 1st fl: add 1 bed,1 full bath and laundry.2nd fl: reconfigure(e) living, kitchen & bath & bedroom per layout. 3rd fl:remodel (e)bedroom & add 1 full bath.add new roof decks @ rear,replace front stairs railing with in kind(wood)add 3 dormers,replace all windows in kind.Details
1st fl: add 1 bed,1 full bath and laundry.2nd fl: reconfigure(e) living, kitchen & bath & bedroom per layout. 3rd fl:remodel (e)bedroom & add 1 full bath.add new roof decks @ rear,replace front stairs railing with in kind(wood)add 3 dormers,replace all windows in kind. | $380,000 |
| Oct 24, 2024 | Completed final sign-off May 2025 | 260 Curtis St | 1st fl: add 1 full bath; 2nd fl: total remodel, add 1 master bathroom. new patio at rear. repair front stair less than 50% comply wtih complaint #201960681 (#2)Details
1st fl: add 1 full bath; 2nd fl: total remodel, add 1 master bathroom. new patio at rear. repair front stair less than 50% comply wtih complaint #201960681 (#2) | $100,000 |
| Jul 29, 2024 | Completed final sign-off Oct 2025 | 681 Brunswick St | 1st fl. add 1 bedroom, family, 2 full baths 2nd fl. remodel (e) kitchen and bathroom, add 1 bedroom, & 1 full bath replace front windows in-kind new sky lights. infill lightwell. add stairs at rear (e) deck.Details
1st fl. add 1 bedroom, family, 2 full baths 2nd fl. remodel (e) kitchen and bathroom, add 1 bedroom, & 1 full bath replace front windows in-kind new sky lights. infill lightwell. add stairs at rear (e) deck. | $170,000 |
| Jul 11, 2024 | Completed final sign-off Apr 2025 | 2250 44th Av | 1/f: add 1 bedroom, 1.5 bath, family room and laundry; 2/f: remodel kitchen and bathroom, add 1.5 bath, relocated interior stairs, 2-story rear addition, comply with nov 202424706.Details
1/f: add 1 bedroom, 1.5 bath, family room and laundry; 2/f: remodel kitchen and bathroom, add 1.5 bath, relocated interior stairs, 2-story rear addition, comply with nov 202424706. | $120,000 |
| May 25, 2022 | Completed final sign-off Jun 2022 | 70 Justin Dr | front stairs dryrot repair. less than 50%.Details
front stairs dryrot repair. less than 50%. | $500 |
| Apr 20, 2022 | Completed final sign-off Mar 2023 | 2227 Bryant St | replace all rear windows (29 total) not visible from the street and require sheetrock at stairs (about 500 sf) u=.30maxDetails
replace all rear windows (29 total) not visible from the street and require sheetrock at stairs (about 500 sf) u=.30max | $5,000 |
| Mar 3, 2022 | Completed final sign-off Jul 2024 | 518 Gennessee St | 1st floor: add 1 den, family, bedroom, and 2 full bath. 2/f: remodel kitchen, bathroom. add 1 full bath in fill lightwell. replace front windows with in kind wood. add new deck. replace front stairs in kind.Details
1st floor: add 1 den, family, bedroom, and 2 full bath. 2/f: remodel kitchen, bathroom. add 1 full bath in fill lightwell. replace front windows with in kind wood. add new deck. replace front stairs in kind. | $150,000 |
| Nov 3, 2021 | Never finaled issued Nov 2021, no final | 44 Bache St | repair front stucco; 1st fl - add family room, 1 bedroom, 1 full bath; 2nd fl - remodel kitchen, bathroom, add roof deck @ rear; attic - add 1 bedroom, 1 full bath; reconfigure interior stairs. replace front windows in-kind.Details
repair front stucco; 1st fl - add family room, 1 bedroom, 1 full bath; 2nd fl - remodel kitchen, bathroom, add roof deck @ rear; attic - add 1 bedroom, 1 full bath; reconfigure interior stairs. replace front windows in-kind. | $110,000 |
| Jun 29, 2021 | Completed final sign-off Apr 2022 | 581 Laidley St | comply w/ nov 200231264 & 200231349: 1st fl add bedroom, family rm, media, 2 full baths, and patio at rear. 2nd floor: remodel kit & bath, add deck at rear. reconfigure interior stairs. repair front stairs in kind (<50%) new wood siding at front, new hardi plank siding at rear. replace front windowsDetails
comply w/ nov 200231264 & 200231349: 1st fl add bedroom, family rm, media, 2 full baths, and patio at rear. 2nd floor: remodel kit & bath, add deck at rear. reconfigure interior stairs. repair front stairs in kind (<50%) new wood siding at front, new hardi plank siding at rear. replace front windows | $120,000 |
| May 21, 2021 | Completed final sign-off Mar 2022 | 867 27th Av | revision to pa# 202008182052. 1st flr: add 3 bedrooms, 3 full bath, family and laundry. 2nd flr: remodel kitchen & bathroom. add 1.5 bath. new roof deck. repair front stairs in kind less than 50% and repair stucco as needed.Details
revision to pa# 202008182052. 1st flr: add 3 bedrooms, 3 full bath, family and laundry. 2nd flr: remodel kitchen & bathroom. add 1.5 bath. new roof deck. repair front stairs in kind less than 50% and repair stucco as needed. | $150,000 |
| Mar 19, 2021 | Completed final sign-off Mar 2022 | 70 Justin Dr | 1st floor: add 2 bedrooms, 1.5 bath family and laundry. 2nd floor: remodel kitchen and bathroom. add 1 full bath. add patio at rear. relocate interior stairs.Details
1st floor: add 2 bedrooms, 1.5 bath family and laundry. 2nd floor: remodel kitchen and bathroom. add 1 full bath. add patio at rear. relocate interior stairs. | $95,000 |
| Jan 7, 2021 | Completed final sign-off Jul 2021 | 2149 17th Av | dbi complaint 202070271: 1/f: add 1 bedroom, 1.5 full bath and family room. 2/f: remodel kitchen, bath and dining and add 1 full bath. new courtyard and relocate staircase.Details
dbi complaint 202070271: 1/f: add 1 bedroom, 1.5 full bath and family room. 2/f: remodel kitchen, bath and dining and add 1 full bath. new courtyard and relocate staircase. | $55,000 |
| Oct 3, 2020 | Completed final sign-off May 2021 | 2022 10th Av | infill under 1-story less than 12ft in height and small lightwell infill on 2/f.reconfigure interior staircase and propose 3 new bathrooms and 2 bedrooms on g/f. relocate laundry & w/h per plan.Details
infill under 1-story less than 12ft in height and small lightwell infill on 2/f.reconfigure interior staircase and propose 3 new bathrooms and 2 bedrooms on g/f. relocate laundry & w/h per plan. | $120,000 |
| Sep 2, 2020 | Completed final sign-off May 2021 | 2022 10th Av | rearrange (e) bathroom on 2nd flr. add new bath on 2nd flr. replace plaster in livingrm and bedrms in-kind. repair interior stair case less than 50%-repair in-kind. remodel (e) kitchen per planDetails
rearrange (e) bathroom on 2nd flr. add new bath on 2nd flr. replace plaster in livingrm and bedrms in-kind. repair interior stair case less than 50%-repair in-kind. remodel (e) kitchen per plan | $88,000 |
| Feb 21, 2020 | Expired or cancelled revoked Mar 2024 | 44 Bonview St | comply nov 201905750 & 201908141, legalize, (e) storage to habitable w/ (n) internal stair; (n) retaining wall @ rear & lower fl, infill (e) lightwell; minor change on g/f & 2/f; lower fl (n) bed, bath, media room; replace windows in kind: front w/ wood clad & rear w/ alum; rebuild 2nd deck in kind.Details
comply nov 201905750 & 201908141, legalize, (e) storage to habitable w/ (n) internal stair; (n) retaining wall @ rear & lower fl, infill (e) lightwell; minor change on g/f & 2/f; lower fl (n) bed, bath, media room; replace windows in kind: front w/ wood clad & rear w/ alum; rebuild 2nd deck in kind. | $160,100 |
| Jan 3, 2020 | Completed final sign-off Dec 2022 | 242 Holloway Av | legalize (e) unit per ord no. 43-14; (n) fire sprinkler under separate permit. alter (e) bathrooms and propose two (n) bedrooms and bathrooms. repair (e) deck stairs in kind. voluntary seismic upgrade. comply with landscape front setback.Details
legalize (e) unit per ord no. 43-14; (n) fire sprinkler under separate permit. alter (e) bathrooms and propose two (n) bedrooms and bathrooms. repair (e) deck stairs in kind. voluntary seismic upgrade. comply with landscape front setback. | $50,000 |
| Dec 19, 2019 | Completed final sign-off Jan 2021 | 1547 20th Av | basement: add 1 bedroom, 1 office, 2 full baths, media and laundry. 1st floor total remodel, add 1 full bath, and stairs to basement. new windows in kind with aluminum clad wood windows.Details
basement: add 1 bedroom, 1 office, 2 full baths, media and laundry. 1st floor total remodel, add 1 full bath, and stairs to basement. new windows in kind with aluminum clad wood windows. | $130,000 |