Block 0543, lot 009
1824 Green St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 2,688 sq ft
- Lot
- 2,417 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 19, 2026 | In progress issued Feb 2026 | 1824 Green St | revision to pa # 2025-1028-8331: install simpson panels side by side. document existing holdowns.Details
revision to pa # 2025-1028-8331: install simpson panels side by side. document existing holdowns. | ||
| Oct 28, 2025 | In progress issued Nov 2025 | 1824 Green St | interior remodel to include (e) kitchen and powder room on 2nd floor . remodel 2 (e) bathrooms on 3rd floor. (n) plan configuration on both levels. replace (e) windows with (n) windows in the rear on the 2nd floor and facing street.Details
interior remodel to include (e) kitchen and powder room on 2nd floor . remodel 2 (e) bathrooms on 3rd floor. (n) plan configuration on both levels. replace (e) windows with (n) windows in the rear on the 2nd floor and facing street. | $160,000 | |
| Feb 18, 2025 | In progress issued Aug 2025 | 1824 Green St | voluntary strengthening in the garage area on the ground fl. add fdn anchorage and plywood shear walls.Details
voluntary strengthening in the garage area on the ground fl. add fdn anchorage and plywood shear walls. | $15,000 | |
| Mar 20, 2008 | Completed final sign-off Apr 2008 | 1824 Green St | Dissmeyer Corp, Dba Acme Roofing Co | reroofingDetails
reroofing | $8,164 |
| Dec 7, 2007 | Never finaled issued Dec 2007, no final | 1824 Green St | street space permitDetails
street space permit | ||
| Aug 29, 2007 | Completed final sign-off Feb 2008 | 1824 Green St | Walker Construction | repair framing & drywall damage caused by leak effect fist & second floor bathrooms. approx 300 sqft of bathroom walls , remodle 2 bathrooms. (no lighting change).Details
repair framing & drywall damage caused by leak effect fist & second floor bathrooms. approx 300 sqft of bathroom walls , remodle 2 bathrooms. (no lighting change). | $41,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.