Jari Construction Inc
- Based in
- Richmond
- On San Francisco permits
- Oct 2013 to Feb 2025
- Last 24 months
- 4 permits filed
78 permits since 2000: 72 completed, 1 in progress, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 20, 2025 | Completed final sign-off Mar 2025 | 1255 Page St | replace dry rot lumber on 6 balconies in kind front of the building. no more than 50% of the structure.Details
replace dry rot lumber on 6 balconies in kind front of the building. no more than 50% of the structure. | $25,000 |
| Dec 18, 2024 | Completed final sign-off Aug 2026 | 373 Columbus Av | structural repair in the crawl space. replace brick, add footings with concrete pad footings. add wall anchorage. add simpson panel with concrete grade beam. voluntary strenghthening.Details
structural repair in the crawl space. replace brick, add footings with concrete pad footings. add wall anchorage. add simpson panel with concrete grade beam. voluntary strenghthening. | $25,000 |
| Dec 10, 2024 | In progress filed Dec 2024, not yet issued | 15 Hollywood Ct | replace existing concrete slab with new one 17'x20' in kindDetails
replace existing concrete slab with new one 17'x20' in kind | $11,000 |
| Nov 8, 2024 | Completed final sign-off Dec 2024 | 1040 Howard St | unit #4 to comply nov 202296894 install two layers of 5/8" typex sheetrock 1 hr fire rated interior wall. replace fire damaged siding.Details
unit #4 to comply nov 202296894 install two layers of 5/8" typex sheetrock 1 hr fire rated interior wall. replace fire damaged siding. | $3,000 |
| Oct 1, 2024 | Completed final sign-off Feb 2025 | 88 Cameo Wy | replace the guardrails on the 2nd floor balcony due to deterioration. voluntary structural strenghtening - add plywood shear walls in the crawlspace and at the rear walls on the upper floors. no change in floor plans.Details
replace the guardrails on the 2nd floor balcony due to deterioration. voluntary structural strenghtening - add plywood shear walls in the crawlspace and at the rear walls on the upper floors. no change in floor plans. | $45,000 |
| Sep 25, 2024 | Completed final sign-off Oct 2024 | 2 Genoa Pl | rev 201809271660 and ref 201907236675- relocated door to light well.Details
rev 201809271660 and ref 201907236675- relocated door to light well. | |
| Aug 28, 2024 | Completed final sign-off Oct 2024 | 2 Genoa Pl | revision to pa 2018-0927-1660 & 2019-0723-6675 for changes to plan per inspector show door to lightwell correctly. change water heater to tankless and relocated at light well.Details
revision to pa 2018-0927-1660 & 2019-0723-6675 for changes to plan per inspector show door to lightwell correctly. change water heater to tankless and relocated at light well. | |
| Aug 19, 2024 | Completed final sign-off Sep 2024 | 1831 Larkin St | repair a post 4x4 in-kind in lightwell stair, repair damaged exterior steps (4th flr & 5th flr) less than 50% in-kind, replace down spout. all work in kind.Details
repair a post 4x4 in-kind in lightwell stair, repair damaged exterior steps (4th flr & 5th flr) less than 50% in-kind, replace down spout. all work in kind. | $6,000 |
| Jun 20, 2024 | Completed final sign-off Oct 2024 | 2 Genoa Pl | revision to 2018-09271660, 201907236675, 2021-0905-8036 remove proposed bike parking from architectural floor planDetails
revision to 2018-09271660, 201907236675, 2021-0905-8036 remove proposed bike parking from architectural floor plan | |
| Jun 5, 2024 | Completed final sign-off Nov 2024 | 2249 Sutter St | replace (e) fire egress stairs in kind at the rear. no change in size or orientation. no firewall construction. 14 jun '24 - travels with p/a #202406053814 (2245 sutter)- single building straddling two lots. - efmDetails
replace (e) fire egress stairs in kind at the rear. no change in size or orientation. no firewall construction. 14 jun '24 - travels with p/a #202406053814 (2245 sutter)- single building straddling two lots. - efm | $50,000 |
| Jun 5, 2024 | Completed final sign-off Oct 2024 | 2245 Sutter St | replace (e) fire egress stairs in kind at the rear. no change in size or orientation. no firewall construction. 14 jun '24 - travels with p/a #202406053817 (2249 sutter)- single building straddling two lots. - efmDetails
replace (e) fire egress stairs in kind at the rear. no change in size or orientation. no firewall construction. 14 jun '24 - travels with p/a #202406053817 (2249 sutter)- single building straddling two lots. - efm | $20,000 |
| Jun 5, 2024 | Completed final sign-off Jun 2025 | 1042 Howard St | madatory soft story retrofit on ground floor & basement per 2022 sfebc ch a4. add plywood shear walls with concrete grade beams. add automated door opener at commercial space for ada upgradeDetails
madatory soft story retrofit on ground floor & basement per 2022 sfebc ch a4. add plywood shear walls with concrete grade beams. add automated door opener at commercial space for ada upgrade | $25,000 |
| Jun 5, 2024 | Completed final sign-off Jun 2025 | 1040 Howard St | madatory soft story retrofit on ground floor & basement per 2022 sfebc ch a4. add plywood shear walls with concrete grade beamsDetails
madatory soft story retrofit on ground floor & basement per 2022 sfebc ch a4. add plywood shear walls with concrete grade beams | $100,000 |
| Apr 17, 2024 | Completed final sign-off Sep 2024 | 1239 07th Av | replace the front main enytu terrazzo stairs in kind with new concrete stairs. replace e metal guardrail in kind.Details
replace the front main enytu terrazzo stairs in kind with new concrete stairs. replace e metal guardrail in kind. | $20,000 |
| Oct 11, 2023 | Completed final sign-off Dec 2023 | 360 Coleridge St | revision '1' to (e) pa# 202306129835: replace (2) 10 ft portions of the brick foundation with new concrete foundation next to garage door.Details
revision '1' to (e) pa# 202306129835: replace (2) 10 ft portions of the brick foundation with new concrete foundation next to garage door. | $5,000 |
| Jun 12, 2023 | Completed final sign-off Dec 2023 | 360 Coleridge St | unit 360 & 360a: foundation repair and voluntary strengthening. replace (e) brick foundation with new reinforced concrete foundation at north elevation and at rear. add volunatry plywood shear walls. replace deteriorated footings with new footings.Details
unit 360 & 360a: foundation repair and voluntary strengthening. replace (e) brick foundation with new reinforced concrete foundation at north elevation and at rear. add volunatry plywood shear walls. replace deteriorated footings with new footings. | $60,000 |
| Jan 31, 2023 | Expired or cancelled suspend Jan 2023 | 1249 16th Av | revision and commencement of work for 201709138076. mandatory soft story retrofit per 2019 sfebc. appendix a4. add 3 steel frames and shear walls. ***revision includes change of moment frame column size on gridline d and shearwall holdown type at gridline b.7 (fee paid under bpa #8076)Details
revision and commencement of work for 201709138076. mandatory soft story retrofit per 2019 sfebc. appendix a4. add 3 steel frames and shear walls. ***revision includes change of moment frame column size on gridline d and shearwall holdown type at gridline b.7 (fee paid under bpa #8076) | $100,000 |
| Nov 21, 2022 | Completed final sign-off Sep 2023 | 1249 16th Av | commencement of work not started under previously approved permit application pa# 201709138076. revision to include change of moment frame column size on gridline d and shearwall holdown type at gridline b.7 (fee paid under bpa #8076)Details
commencement of work not started under previously approved permit application pa# 201709138076. revision to include change of moment frame column size on gridline d and shearwall holdown type at gridline b.7 (fee paid under bpa #8076) | $120,000 |
| Nov 10, 2022 | Completed final sign-off Apr 2023 | 1872 Church St | voluntary strengthening on the ground floor; add plywood shear walls on (e) perimeter walls; add new 3 ft high plywood stud wall underneath upper floor in the back; add simpson panelDetails
voluntary strengthening on the ground floor; add plywood shear walls on (e) perimeter walls; add new 3 ft high plywood stud wall underneath upper floor in the back; add simpson panel | $25,000 |
| Oct 27, 2022 | Completed final sign-off Aug 2023 | 101 Steiner St | voluntary strengthenin on ground floor, add plywood shear wallsDetails
voluntary strengthenin on ground floor, add plywood shear walls | $40,000 |
| Oct 18, 2022 | Completed final sign-off May 2023 | 213 Ashbury St | replacing existing foundation in kind at the south side of the building due to deterioration.Details
replacing existing foundation in kind at the south side of the building due to deterioration. | $20,000 |
| Oct 11, 2022 | Never finaled issued Nov 2022, no final | 270 Staples Av | add a full bathroom at ground floor. replace (e) tub in-kind and lower concrete slab ~ 12" to achieve 8ft ceiling height. add plywood shear walls. replace water heater with tankless water heater.Details
add a full bathroom at ground floor. replace (e) tub in-kind and lower concrete slab ~ 12" to achieve 8ft ceiling height. add plywood shear walls. replace water heater with tankless water heater. | $120,000 |
| Sep 26, 2022 | Never finaled issued Dec 2022, no final | 224 28th St | revision 1 to (e) bpa#202208100261. replace 16-foot long concrete foundation in-kind @ front elevationDetails
revision 1 to (e) bpa#202208100261. replace 16-foot long concrete foundation in-kind @ front elevation | $5,000 |
| Aug 10, 2022 | Completed final sign-off Jan 2023 | 224 28th St | foundation repair. replace existing deteriorated concrete foundation in-kind at the west side of the building. no layout changes.Details
foundation repair. replace existing deteriorated concrete foundation in-kind at the west side of the building. no layout changes. | $25,000 |
| Jul 8, 2022 | Completed final sign-off Sep 2022 | 1329 16th Av | replace 15 windows. not visible from street. same size & same opening. u = 0.30 maxDetails
replace 15 windows. not visible from street. same size & same opening. u = 0.30 max | $15,000 |
| Aug 30, 2021 | Completed final sign-off Apr 2022 | 15 Hollywood Ct | voluntary strengthening on the ground floor. add plywood shear wallsDetails
voluntary strengthening on the ground floor. add plywood shear walls | $25,000 |
| Jun 2, 2021 | Completed final sign-off Nov 2021 | 238 28th St | foundation repair: replace (e) foundatin with new reinforced concrete grade beam. approx 34'-0" length along east exterior wall.Details
foundation repair: replace (e) foundatin with new reinforced concrete grade beam. approx 34'-0" length along east exterior wall. | $20,000 |
| Mar 9, 2021 | Completed final sign-off Oct 2022 | 946 Greenwich St | revision to pa 202009033404 to close (e) 4 windows at the property line on 2nd floor.Details
revision to pa 202009033404 to close (e) 4 windows at the property line on 2nd floor. | |
| Dec 21, 2020 | Completed final sign-off May 2021 | 2642 17th Av | voluntary strengthening @ ground floorDetails
voluntary strengthening @ ground floor | $20,000 |
| Nov 9, 2020 | Completed final sign-off May 2021 | 544 Peralta Av | replace existing concrete retaining wall foundation in kind at backyard due to significant cracking.Details
replace existing concrete retaining wall foundation in kind at backyard due to significant cracking. | $20,000 |
| Sep 3, 2020 | Completed final sign-off Oct 2022 | 946 Greenwich St | remodel kitchen & bathroom. close (e) windows as shown in kitchen area, not visible from street. structural repair in the storage area at lower level. replace (e) front stairs & rear platform less than 30" in height in kind due to significant deterioration.Details
remodel kitchen & bathroom. close (e) windows as shown in kitchen area, not visible from street. structural repair in the storage area at lower level. replace (e) front stairs & rear platform less than 30" in height in kind due to significant deterioration. | $100,000 |
| Jun 30, 2020 | Completed final sign-off Oct 2020 | 1904 Broadway | replacing the extg brick foundation with new concrete foundation. adding plywood shear walls.Details
replacing the extg brick foundation with new concrete foundation. adding plywood shear walls. | $40,000 |
| Feb 5, 2020 | Completed final sign-off Jul 2020 | 680 Valencia St | (residential) mandatory soft retrofit at the ground floor per 2019 cbc, appendix a4.Details
(residential) mandatory soft retrofit at the ground floor per 2019 cbc, appendix a4. | $65,000 |
| Feb 5, 2020 | Completed final sign-off Jul 2020 | 680 Valencia St | (commercial) mandatory soft retrofit at ground floor per 2016 cbc, appendix a4. do ada upgradeDetails
(commercial) mandatory soft retrofit at ground floor per 2016 cbc, appendix a4. do ada upgrade | $30,000 |
| Jan 24, 2020 | Expired or cancelled cancelled Dec 2020 | 946 Greenwich St | demo work add sheet rock repair the electrical wires and possible plumbing 5/8" type "x" gb. instlation to be place, bathroom tiles to be replace (6x5) (e) kitchen cabinets to be removed and install new ones (10' x 10')Details
demo work add sheet rock repair the electrical wires and possible plumbing 5/8" type "x" gb. instlation to be place, bathroom tiles to be replace (6x5) (e) kitchen cabinets to be removed and install new ones (10' x 10') | $65,000 |
| Oct 23, 2019 | Completed final sign-off Apr 2020 | 1712 Union St | residential: soft story mandatory per 2016 sfebc appendix a-4Details
residential: soft story mandatory per 2016 sfebc appendix a-4 | $60,000 |
| Oct 23, 2019 | Completed final sign-off Apr 2020 | 1722 Union St | comercial: soft story mandatory per 2016 sfebc appendix a-4Details
comercial: soft story mandatory per 2016 sfebc appendix a-4 | $20,000 |
| Apr 11, 2019 | Never finaled issued Apr 2019, no final | 582 Grove St | install a scoffold and repair the damaged stucco at front facade of building. dryrot repair if necessary. repair in kind.Details
install a scoffold and repair the damaged stucco at front facade of building. dryrot repair if necessary. repair in kind. | $20,000 |
| Mar 12, 2019 | Completed final sign-off Jul 2019 | 1345 16th Av | revision to 201707051022 detail of stair in the basement levelDetails
revision to 201707051022 detail of stair in the basement level | |
| Feb 19, 2019 | Completed final sign-off Jun 2019 | 840 Greenwich St | mandatory soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a4Details
mandatory soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a4 | $85,000 |
| Feb 1, 2019 | Completed final sign-off Mar 2019 | 3465 19th St | structural revision to soft story pa #201809140175. memorialize structural modifications based on existing site conditions.Details
structural revision to soft story pa #201809140175. memorialize structural modifications based on existing site conditions. | $5,000 |
| Sep 27, 2018 | Completed final sign-off Nov 2018 | 631 12th Av | voluntary strengthening at garageDetails
voluntary strengthening at garage | $15,000 |
| Sep 14, 2018 | Completed final sign-off Mar 2019 | 3465 19th St | residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201809140172Details
residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 201809140172 | $60,000 |
| Sep 14, 2018 | Completed final sign-off Mar 2019 | 3465 19th St | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201809140175Details
commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201809140175 | $20,000 |
| Mar 27, 2018 | Completed final sign-off Jun 2018 | 287 Bartlett St | voluntary lateral strengthening at gr fl, maher not reqDetails
voluntary lateral strengthening at gr fl, maher not req | $82,000 |
| Mar 19, 2018 | Completed final sign-off Sep 2018 | 1342 Green St | soft story retrofit per 2016 sfebc appx a4Details
soft story retrofit per 2016 sfebc appx a4 | $25,000 |
| Mar 19, 2018 | Completed final sign-off Jun 2018 | 1343 Guerrero St | revision to 201711063253 lower slab 8", new concrete slab on grade underpin (e) foundationDetails
revision to 201711063253 lower slab 8", new concrete slab on grade underpin (e) foundation | $40,000 |
| Mar 8, 2018 | Completed final sign-off May 2018 | 1256 Stanyan St | seismic strengthening in the crawlspace per 2016 sfebc, add new ply shear walls and foundationDetails
seismic strengthening in the crawlspace per 2016 sfebc, add new ply shear walls and foundation | $25,000 |
| Feb 12, 2018 | Completed final sign-off Sep 2022 | 695 Noe St | add an adu unit to the ground flr of an existing 5 family dwelling converting it to a 6 dwelling per 162-16 . ref soft story permit:201709127793. structural deferred under separate permit, no cfc.Details
add an adu unit to the ground flr of an existing 5 family dwelling converting it to a 6 dwelling per 162-16 . ref soft story permit:201709127793. structural deferred under separate permit, no cfc. | $90,000 |
| Jan 25, 2018 | Completed final sign-off Jan 2020 | 2344 Fulton St | soft story retrofit per sfec chapter 4d: 2016 cebc appendixDetails
soft story retrofit per sfec chapter 4d: 2016 cebc appendix | $51,000 |
| Nov 6, 2017 | Completed final sign-off Jun 2018 | 1343 Guerrero St | replace exsting deteriorated brick walls and posts with new wood stud wall and posts with fdn.Details
replace exsting deteriorated brick walls and posts with new wood stud wall and posts with fdn. | $10,000 |
| Sep 14, 2017 | Completed final sign-off Aug 2018 | 780 Guerrero St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. provide new ply shear walls with foundation. n/a ordinance #155-13. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. provide new ply shear walls with foundation. n/a ordinance #155-13. n/a ordinance #155-13 | $80,000 |
| Sep 14, 2017 | Completed final sign-off Jan 2019 | 1323 16th Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4, add simpson strong wallDetails
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4, add simpson strong wall | $90,000 |
| Sep 12, 2017 | Completed final sign-off Apr 2020 | 695 Noe St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. new ply shearwalls with new foundation, add (1) steel moment frame.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. new ply shearwalls with new foundation, add (1) steel moment frame. | $60,000 |
| Aug 7, 2017 | Completed final sign-off Jan 2018 | 2315 Bush St | compliance with mandatory soft story retrofit program, cebc 2016 a4 and sfebc 2016 chp 4dDetails
compliance with mandatory soft story retrofit program, cebc 2016 a4 and sfebc 2016 chp 4d | $30,000 |
| Jul 20, 2017 | Completed final sign-off Aug 2018 | 1200 Francisco St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. all work in garage, adding plywood to (e) walls, install new shearwalls, foundation work includes adding a new grade beam at new shearwalls and install holdowns into existing foundation.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. all work in garage, adding plywood to (e) walls, install new shearwalls, foundation work includes adding a new grade beam at new shearwalls and install holdowns into existing foundation. | $150,000 |
| Jul 6, 2017 | Completed final sign-off Jan 2019 | 1329 16th Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appnedix a4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appnedix a4 | $90,000 |
| Jul 5, 2017 | Completed final sign-off Jul 2019 | 1345 16th Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $110,000 |
| May 31, 2017 | Completed final sign-off Apr 2019 | 185 Dolores St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. add new steel moment frame and shear walls within new foundation. maher n/a.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. add new steel moment frame and shear walls within new foundation. maher n/a. | $80,000 |
| May 17, 2017 | Completed final sign-off Jan 2018 | 349 29th St | front building - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
front building - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $40,000 |
| Apr 20, 2017 | Completed final sign-off Aug 2017 | 645 08th Av | soft story retrofit per sfebc chapter 4d, 2016 sfbc chapter a4. add (3) single bay steel moment frames, new ply shear walls and foundationsDetails
soft story retrofit per sfebc chapter 4d, 2016 sfbc chapter a4. add (3) single bay steel moment frames, new ply shear walls and foundations | $95,000 |
| Apr 17, 2017 | Completed final sign-off Feb 2018 | 360 Green St | soft story retrofit per 2012 iebc chapter a3. provide ply shear walls and new foundations.Details
soft story retrofit per 2012 iebc chapter a3. provide ply shear walls and new foundations. | $70,000 |
| Apr 11, 2017 | Completed final sign-off May 2017 | 674 Joost Av | dry-rot at front elevation, replace in kind, less than 50% at steps and landing (no exterior walls).Details
dry-rot at front elevation, replace in kind, less than 50% at steps and landing (no exterior walls). | $4,000 |
| Mar 27, 2017 | Completed final sign-off May 2017 | 674 Joost Av | provide new plywood shear walls and foundation anchorage based on 2012eibc chapter a3Details
provide new plywood shear walls and foundation anchorage based on 2012eibc chapter a3 | $10,000 |
| Mar 9, 2017 | Completed final sign-off Sep 2017 | 1602 Church St | revision to commercial soft story app #201612286028. remove shear wall from scope of work, provide foundation anchorage.Details
revision to commercial soft story app #201612286028. remove shear wall from scope of work, provide foundation anchorage. | |
| Mar 9, 2017 | Completed final sign-off Sep 2017 | 205 28th St | revision to residential soft story app #201612286025. remove shear walls from scope of work, add foundation anchorage.Details
revision to residential soft story app #201612286025. remove shear walls from scope of work, add foundation anchorage. | |
| Jan 26, 2017 | Completed final sign-off Sep 2017 | 2947 Jackson St | voluntary soft story retrofit per 2012 iebc chapter a4. add 2 steel moment frames, new plywood shear walls and foundation anchorage. and tie-the deck (existing) to the bldg with tension ties.Details
voluntary soft story retrofit per 2012 iebc chapter a4. add 2 steel moment frames, new plywood shear walls and foundation anchorage. and tie-the deck (existing) to the bldg with tension ties. | $75,000 |
| Dec 28, 2016 | Completed final sign-off Sep 2017 | 1602 Church St | soft story retrofit per 2012 iebc chapter a4. add 2 steel moment frames, plywood shear walls (residential pa#201612286025)Details
soft story retrofit per 2012 iebc chapter a4. add 2 steel moment frames, plywood shear walls (residential pa#201612286025) | $15,000 |
| Dec 28, 2016 | Completed final sign-off Sep 2017 | 205 28th St | soft story retrofit per 2012 iebc chapter a4. add 2 steel moment frames, plywood shear walls (commercial pa #201612286028)Details
soft story retrofit per 2012 iebc chapter a4. add 2 steel moment frames, plywood shear walls (commercial pa #201612286028) | $70,000 |
| Dec 12, 2016 | Completed final sign-off Mar 2017 | 3300 Laguna St | revision to 201606240867, mandatory soft-story retrofit. add new footing and revise simpson strong wall dimesnsions due to (e) field conditionsDetails
revision to 201606240867, mandatory soft-story retrofit. add new footing and revise simpson strong wall dimesnsions due to (e) field conditions | $5,000 |
| Oct 19, 2016 | Completed final sign-off Jan 2018 | 2634 Octavia St | soft story retrofit per sfbc chapter 34b: per 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b: per 2012 iebc appendix a-4 | $80,000 |
| Jun 24, 2016 | Completed final sign-off Jan 2017 | 630 Corbett Av | soft story retrofit per iebc 2012 chapter a4. add shear walls, simpson strong walls and new foundationDetails
soft story retrofit per iebc 2012 chapter a4. add shear walls, simpson strong walls and new foundation | $90,000 |
| Jun 24, 2016 | Completed final sign-off Mar 2017 | 3300 Laguna St | soft story retrofit per iebc 2012 chapter a4. add shear walls, simpson strong walls and new foundationDetails
soft story retrofit per iebc 2012 chapter a4. add shear walls, simpson strong walls and new foundation | $80,000 |
| Apr 27, 2016 | Completed final sign-off Sep 2016 | 2465 Chestnut St | revision to (e) drawing set with ref pa 2016 0120 7458: relocate ssws 2nd revise their size not to eliminate parking. maher naDetails
revision to (e) drawing set with ref pa 2016 0120 7458: relocate ssws 2nd revise their size not to eliminate parking. maher na | $3,000 |
| Jan 20, 2016 | Completed final sign-off Sep 2016 | 2465 Chestnut St | soft story retrofit per sfbc chapter 34b engineering criteria: 2012 iebc appendix a-4. scope of work includes adding new steel moment frames simpsom strong walls and plywood sheating on existing walls and adding new foundations.Details
soft story retrofit per sfbc chapter 34b engineering criteria: 2012 iebc appendix a-4. scope of work includes adding new steel moment frames simpsom strong walls and plywood sheating on existing walls and adding new foundations. | $100,000 |
| Jan 15, 2016 | Completed final sign-off Sep 2016 | 2275 Francisco St | ground floor: retrofit per sfbc chapter 34b per 2012 iebc appendix a-4 for adding steel moment frames ssw ply sheathing and new foundation. n/a for maherDetails
ground floor: retrofit per sfbc chapter 34b per 2012 iebc appendix a-4 for adding steel moment frames ssw ply sheathing and new foundation. n/a for maher | $70,000 |
| Oct 1, 2013 | Completed final sign-off Feb 2014 | 73 Carver St | replace (e) failing masonry retaining wall at the side property line with a new reinforced concrete retaining wall of exact height & lengthDetails
replace (e) failing masonry retaining wall at the side property line with a new reinforced concrete retaining wall of exact height & length | $6,000 |
| Oct 1, 2013 | Completed final sign-off Feb 2014 | 77 Carver St | replace existing failing mansonry retaining wall at the side property line with a new reinforced concrete retaining wall of extact height and length.Details
replace existing failing mansonry retaining wall at the side property line with a new reinforced concrete retaining wall of extact height and length. |