Block 3726, lot 018
1040 Howard St
- City’s use
- Multi-Family Residential
- Built
- 1914
- Stories
- 3
- Units
- 9
- Rooms
- 4 bedrooms, 9 bathrooms
- Building
- 6,540 sq ft
- Lot
- 2,796 sq ft
- Zoning
- SLR
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 8, 2024 | Completed final sign-off Dec 2024 | 1040 Howard St | Jari Construction Inc | unit #4 to comply nov 202296894 install two layers of 5/8" typex sheetrock 1 hr fire rated interior wall. replace fire damaged siding.Details
unit #4 to comply nov 202296894 install two layers of 5/8" typex sheetrock 1 hr fire rated interior wall. replace fire damaged siding. | $3,000 |
| Jul 30, 2024 | Completed final sign-off Oct 2024 | 1040 Howard St | Poly-On Security System Inc. | upgrade existing fire alarm system by replacing it with (1) addressable fa unit, (1) wireless communicator next to facu, (6) addressable smoke detector, (3) addressable manual pull station, (3) horn strobes, (16) lf horns at all residential sleeping area to comply with sffc section 1103.7.6.1.Details
upgrade existing fire alarm system by replacing it with (1) addressable fa unit, (1) wireless communicator next to facu, (6) addressable smoke detector, (3) addressable manual pull station, (3) horn strobes, (16) lf horns at all residential sleeping area to comply with sffc section 1103.7.6.1. | $15,000 |
| Jun 5, 2024 | Completed final sign-off Jun 2025 | 1042 Howard St | Jari Construction Inc | madatory soft story retrofit on ground floor & basement per 2022 sfebc ch a4. add plywood shear walls with concrete grade beams. add automated door opener at commercial space for ada upgradeDetails
madatory soft story retrofit on ground floor & basement per 2022 sfebc ch a4. add plywood shear walls with concrete grade beams. add automated door opener at commercial space for ada upgrade | $25,000 |
| Jun 5, 2024 | Completed final sign-off Jun 2025 | 1040 Howard St | Jari Construction Inc | madatory soft story retrofit on ground floor & basement per 2022 sfebc ch a4. add plywood shear walls with concrete grade beamsDetails
madatory soft story retrofit on ground floor & basement per 2022 sfebc ch a4. add plywood shear walls with concrete grade beams | $100,000 |
| Oct 10, 2017 | Never finaled issued Oct 2017, no final | 1040 Howard St | street spaceDetails
street space | ||
| Dec 1, 2016 | Completed final sign-off Dec 2017 | 1040 Howard St | Kwong Associates | to comply with nov 201642852; 201643641; 201643811 - r/r egress door, r/r damaged drywall. repair window in apt 4. repair one step @ g/f egress stairway.Details
to comply with nov 201642852; 201643641; 201643811 - r/r egress door, r/r damaged drywall. repair window in apt 4. repair one step @ g/f egress stairway. | $1,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.