Block 0104, lot 010
2 Genoa Pl
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 3
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 2,985 sq ft
- Lot
- 1,149 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2024 | Completed final sign-off Oct 2024 | 2 Genoa Pl | Jari Construction Inc | rev 201809271660 and ref 201907236675- relocated door to light well.Details
rev 201809271660 and ref 201907236675- relocated door to light well. | |
| Aug 28, 2024 | Completed final sign-off Oct 2024 | 2 Genoa Pl | Jari Construction Inc | revision to pa 2018-0927-1660 & 2019-0723-6675 for changes to plan per inspector show door to lightwell correctly. change water heater to tankless and relocated at light well.Details
revision to pa 2018-0927-1660 & 2019-0723-6675 for changes to plan per inspector show door to lightwell correctly. change water heater to tankless and relocated at light well. | |
| Jul 8, 2024 | Completed final sign-off Jul 2024 | 2 Genoa Pl | Poly-On Security System Inc. | install a new sprinkler monitoring system per nfpa72-2022 section 23.8.5.5.1 with (1) fire alarm control unit (1) wirless amnercial fire communicator (1) smoke detector above the facu (1) manual pull stationDetails
install a new sprinkler monitoring system per nfpa72-2022 section 23.8.5.5.1 with (1) fire alarm control unit (1) wirless amnercial fire communicator (1) smoke detector above the facu (1) manual pull station | $4,900 |
| Jun 20, 2024 | Completed final sign-off Oct 2024 | 2 Genoa Pl | Jari Construction Inc | revision to 2018-09271660, 201907236675, 2021-0905-8036 remove proposed bike parking from architectural floor planDetails
revision to 2018-09271660, 201907236675, 2021-0905-8036 remove proposed bike parking from architectural floor plan | |
| Jun 10, 2024 | Completed final sign-off Aug 2024 | 2 Genoa Pl | Steven Yeung Inc Dba Chung Wah Plbg&Fire | to obtain final inspection for work approved under pa# 202012030232. all work is completeDetails
to obtain final inspection for work approved under pa# 202012030232. all work is complete | |
| Jul 1, 2022 | Completed final sign-off Oct 2024 | 2 Genoa Pl | recommencement and completion of work approved under pa 201809271660.Details
recommencement and completion of work approved under pa 201809271660. | $90,000 | |
| Sep 9, 2021 | Completed final sign-off Oct 2024 | 2 Genoa Pl | revision to pa 201907236675 due to as built conditions. two windows in living room changed to one larger window, unit entry moved over several inches, structural shear wall relocated and footings and structural details modified per clouded structural drawings.Details
revision to pa 201907236675 due to as built conditions. two windows in living room changed to one larger window, unit entry moved over several inches, structural shear wall relocated and footings and structural details modified per clouded structural drawings. | ||
| Dec 3, 2020 | Completed final sign-off Jul 2024 | 2 Genoa Pl | Steven Yeung Inc Dba Chung Wah Plbg&Fire | installation of fire sprinkler system for ground floor adu. underground work included.Details
installation of fire sprinkler system for ground floor adu. underground work included. | $15,000 |
| Jul 20, 2020 | Never finaled issued Jul 2020, no final | 2 Genoa Pl | street spaceDetails
street space | ||
| Jul 23, 2019 | Completed final sign-off Oct 2024 | 2 Genoa Pl | Sf Gonzalez Concrete Inc. | structural work to permit #201809271660 for cost, see prior permit @ $90,000. no exteroir work under this permit. including minor plan changes, energy sheets & electrical plan.Details
structural work to permit #201809271660 for cost, see prior permit @ $90,000. no exteroir work under this permit. including minor plan changes, energy sheets & electrical plan. | $25,000 |
| Sep 27, 2018 | Expired or cancelled expired Oct 2024 | 2 Genoa Pl | create accessory dwelling unit (adu) in unconditioned garage/basement area of (3) 3-story 6-unit bldg. ord #162-16. structural work under separate permit.Details
create accessory dwelling unit (adu) in unconditioned garage/basement area of (3) 3-story 6-unit bldg. ord #162-16. structural work under separate permit. | $77,000 | |
| Sep 4, 2013 | Never finaled issued Sep 2013, no final | 2 Genoa Pl | to ocmplete work and obtain final inspection for work approved under pa# 201209079201Details
to ocmplete work and obtain final inspection for work approved under pa# 201209079201 | $12,000 | |
| Sep 7, 2012 | Never finaled issued Sep 2012, no final | 2 Genoa Pl | apt #12 - replace kitchen cabinets & bath cabinets, seetrock & trim.Details
apt #12 - replace kitchen cabinets & bath cabinets, seetrock & trim. | $15,000 | |
| Aug 24, 2007 | Completed final sign-off Jun 2008 | 2 Genoa Pl | work @ apt# 6 only. replace kitchen cabinets & bath cabinets. sheetrock & trim. to comply with complaint# 200718491.Details
work @ apt# 6 only. replace kitchen cabinets & bath cabinets. sheetrock & trim. to comply with complaint# 200718491. | $15,000 | |
| Aug 29, 2006 | Never finaled issued Aug 2006, no final | 2 Genoa Pl | street space permitDetails
street space permit | ||
| Jul 6, 2006 | Never finaled issued Jul 2006, no final | 2 Genoa Pl | Jonathan A Rauh | increase value of job pa#200605151649 as per inspection from $30,000 to $65,000.ooDetails
increase value of job pa#200605151649 as per inspection from $30,000 to $65,000.oo | $35,000 |
| May 15, 2006 | Expired or cancelled expired Oct 2008 | 2 Genoa Pl | Jonathan A Rauh | apt. # 3 & 8 : replace kitchen cabinets and plumbing fixtures, replace bath fixtures and replace tile in bathroom. update electrical where accessibleDetails
apt. # 3 & 8 : replace kitchen cabinets and plumbing fixtures, replace bath fixtures and replace tile in bathroom. update electrical where accessible | $30,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.