Block 3598, lot 008
780 Guerrero St
- City’s use
- Multi-Family Residential
- Built
- 1916
- Stories
- 4
- Rooms
- 12 bedrooms, 14 bathrooms
- Building
- 12,321 sq ft
- Lot
- 4,892 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 8, 2026 | Completed final sign-off Jan 2026 | 780 Guerrero St | Hinojosa Roofing Inc | remove the existing roof and install new modified bitumen roofing system flat roof. no torch down.Details
remove the existing roof and install new modified bitumen roofing system flat roof. no torch down. | $26,000 |
| Jan 4, 2024 | Expired or cancelled cancelled Jan 2024 | 780 Guerrero St | Citybest Construction | remodeling kitchen and bathroom. no walls to be moved. in kind remodel. bathroom approx. 40 sq ft. kitchen approx. 100 sq ft.Details
remodeling kitchen and bathroom. no walls to be moved. in kind remodel. bathroom approx. 40 sq ft. kitchen approx. 100 sq ft. | $30,000 |
| Sep 19, 2023 | Completed final sign-off Dec 2023 | 780 Guerrero St | A K Home Improvement Inc | unit # 15: kitchen remodel in-kind. paint. approx. 100 sq. feet.Details
unit # 15: kitchen remodel in-kind. paint. approx. 100 sq. feet. | $10,000 |
| Mar 29, 2019 | Never finaled issued Mar 2019, no final | 780 Guerrero St | installing new vinyl siding on the back wall of the building (not visible from the street) new siding will come with insulation and new house wrap water proofing paper will installed as well.Details
installing new vinyl siding on the back wall of the building (not visible from the street) new siding will come with insulation and new house wrap water proofing paper will installed as well. | $48,000 | |
| Feb 28, 2018 | Never finaled issued Feb 2018, no final | 780 Guerrero St | street spaceDetails
street space | ||
| Sep 14, 2017 | Completed final sign-off Aug 2018 | 780 Guerrero St | Jari Construction Inc | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. provide new ply shear walls with foundation. n/a ordinance #155-13. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. provide new ply shear walls with foundation. n/a ordinance #155-13. n/a ordinance #155-13 | $80,000 |
| Jul 12, 2017 | Completed final sign-off Oct 2017 | 780 Guerrero St | Maksim Korzhenkov | revision to pa 2017-0626-0367 - removal and addition of non load bearing walls for new plan configuration. add shear walls. work in units 4,7 and 8Details
revision to pa 2017-0626-0367 - removal and addition of non load bearing walls for new plan configuration. add shear walls. work in units 4,7 and 8 | $15,000 |
| Jun 26, 2017 | Never finaled issued Jun 2017, no final | 780 Guerrero St | streetspaceDetails
streetspace | ||
| Jun 26, 2017 | Completed final sign-off Oct 2017 | 780 Guerrero St | Maksim Korzhenkov | apartment's 4,7,8: (3) bathroom remodel, (3) kitchen remodel, new electricalDetails
apartment's 4,7,8: (3) bathroom remodel, (3) kitchen remodel, new electrical | $45,000 |
| Apr 24, 2017 | Never finaled issued Apr 2017, no final | 780 Guerrero St | street spaceDetails
street space | ||
| Jun 10, 2015 | Completed final sign-off Jun 2017 | 780 Guerrero St | G M M Construction Co | work in unit 11: replace kitchen countertop and sink two sections 26" + 68"Details
work in unit 11: replace kitchen countertop and sink two sections 26" + 68" | $1,560 |
| Mar 22, 2012 | Never finaled issued Mar 2012, no final | 780 Guerrero St | G M M Construction Co | repair entry appr. 5x12, install sheathing and plaster. new tiles on floor. no structural work.Details
repair entry appr. 5x12, install sheathing and plaster. new tiles on floor. no structural work. | $2,200 |
| Aug 5, 2010 | Never finaled issued Aug 2010, no final | 780 Guerrero St | street spaceDetails
street space | ||
| Nov 25, 2009 | Completed final sign-off Jan 2010 | 780 Guerrero St | G M M Construction Co | in front change 5 wooden double hung. in kind. 3 new vinyle replacements in back with same. remodel bathroom. all fixtures same positions.Details
in front change 5 wooden double hung. in kind. 3 new vinyle replacements in back with same. remodel bathroom. all fixtures same positions. | $10,000 |
| Aug 28, 2009 | Completed final sign-off Dec 2009 | 780 Guerrero St | G M M Construction Co | front of building 2 new wooden french casement living and bedroom. replacement. no grills muntias. 3 new vinyl replacements in back in kind. to comply with nov #200916642 dated 8/3/2009. all wndows will be gradually replaced with double glaced in frontDetails
front of building 2 new wooden french casement living and bedroom. replacement. no grills muntias. 3 new vinyl replacements in back in kind. to comply with nov #200916642 dated 8/3/2009. all wndows will be gradually replaced with double glaced in front | $3,100 |
| Aug 24, 2009 | Never finaled filed Aug 2009, never issued | 780 Guerrero St | G M M Construction Co | front of bldg two new wooden fence casement, two window replacement, no grilles, mountings, three new vinyl replacement, to comply w/ nov #200916642.Details
front of bldg two new wooden fence casement, two window replacement, no grilles, mountings, three new vinyl replacement, to comply w/ nov #200916642. | $3,100 |
| Feb 26, 2008 | Never finaled issued Feb 2008, no final | 780 Guerrero St | G M M Construction Co | renewal pa #200705111026, apt #10a.Details
renewal pa #200705111026, apt #10a. | |
| Jan 31, 2008 | Never finaled issued Jan 2008, no final | 780 Guerrero St | G M M Construction Co | replace 4 windows in kind at frontDetails
replace 4 windows in kind at front | $1,800 |
| Dec 4, 2007 | Completed final sign-off Feb 2008 | 780 Guerrero St | G M M Construction Co | replace (3) windows winyl. same size + location not facing street. remodel one bathroom.Details
replace (3) windows winyl. same size + location not facing street. remodel one bathroom. | $7,900 |
| May 11, 2007 | Expired or cancelled expired Feb 2008 | 780 Guerrero St | G M M Construction Co | apt. 10 - replace (e) dryrot windows (9) vinyl. same size & location. not facing street. remodel one small kitchen fixtures same location remodel one bathroom.Details
apt. 10 - replace (e) dryrot windows (9) vinyl. same size & location. not facing street. remodel one small kitchen fixtures same location remodel one bathroom. | $12,300 |
| Apr 30, 2002 | Expired or cancelled expired Aug 2002 | 780 Guerrero St | Markoff Structural Pest Control | repair north stair assembly as required by local building iinspectorDetails
repair north stair assembly as required by local building iinspector | $1,945 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.