Antormen Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2025 to Jul 2026
- Last 24 months
- 10 permits filed
10 permits since 2000: 9 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2026 | Completed final sign-off Aug 2026 | 688 03rd Av | revision to scope of pa#202605010476, need to update scope from tub to walk in shower replacement.Details
revision to scope of pa#202605010476, need to update scope from tub to walk in shower replacement. | |
| Jul 31, 2026 | In progress issued Jul 2026 | 555 Fulton St | remodel in kind of 1 kitchen & 2 bathrooms, like for like no structural changes.Details
remodel in kind of 1 kitchen & 2 bathrooms, like for like no structural changes. | $30,000 |
| Jun 23, 2026 | Completed final sign-off Aug 2026 | 957 Elizabeth St | laundry room remodel, replace and upgrade appliances, upgrade mep to code, replace washer, wash sink all in same location in the laundry room, no structural changes to layout, no added circuits.Details
laundry room remodel, replace and upgrade appliances, upgrade mep to code, replace washer, wash sink all in same location in the laundry room, no structural changes to layout, no added circuits. | $20,000 |
| May 1, 2026 | Completed final sign-off Aug 2026 | 688 03rd Av | bathroom remodel-like for like, tub to tub (40 sq ft), replace toilet, vanity sink, fixtures all in same location. upgrade fan, add 2 recessed lights, no change to electrical layout, no wall demolition or construction.Details
bathroom remodel-like for like, tub to tub (40 sq ft), replace toilet, vanity sink, fixtures all in same location. upgrade fan, add 2 recessed lights, no change to electrical layout, no wall demolition or construction. | $20,000 |
| Apr 24, 2026 | Completed final sign-off Sep 2026 | 2645 14th Av | 2/f -interior remodel of existing kitchen, relocation of laundry, and remodel of existing master bathroom including replacemnt toilet, vanity sink and fan. no change to structure or sqft.Details
2/f -interior remodel of existing kitchen, relocation of laundry, and remodel of existing master bathroom including replacemnt toilet, vanity sink and fan. no change to structure or sqft. | $170,000 |
| Jan 22, 2026 | Completed final sign-off Mar 2026 | 1490 Francisco St | unit 1: master bathroom remodel, no structural changes, like for like replace tub, toilet, sink, vanity, fan, 3 recessed lights upgrade m-e-p to code, 60 sq ftDetails
unit 1: master bathroom remodel, no structural changes, like for like replace tub, toilet, sink, vanity, fan, 3 recessed lights upgrade m-e-p to code, 60 sq ft | $30,000 |
| Dec 10, 2025 | Completed final sign-off Mar 2026 | 35 Dolores St | unit 409: bathroom remodel, shower to shower, replace toilet, sink, vanity, fan, upgrade mep to code.70sf. no walls to be remove or add.shall manteing all accesabilty fitures reqwuired during original constructionDetails
unit 409: bathroom remodel, shower to shower, replace toilet, sink, vanity, fan, upgrade mep to code.70sf. no walls to be remove or add.shall manteing all accesabilty fitures reqwuired during original construction | $40,000 |
| Dec 5, 2025 | Completed final sign-off Feb 2026 | 148 Hancock St | bathroom remodel like for like, replace tub to tub, vanity, sink, fan upgrade mep to code. no structual changes. 45 sq ft.Details
bathroom remodel like for like, replace tub to tub, vanity, sink, fan upgrade mep to code. no structual changes. 45 sq ft. | $40,000 |
| Jul 3, 2025 | Completed final sign-off Feb 2026 | 3268 20th St | remodel existing kitchen and bathroom. remove bearing wall in the kitchen and add new posts and beam.Details
remodel existing kitchen and bathroom. remove bearing wall in the kitchen and add new posts and beam. | $80,000 |
| Apr 8, 2025 | Completed final sign-off Jun 2026 | 618 Buchanan St | remodeling the existing kitchen and bathroom. add a new half bathroom. remove a bearing wall. add a new office room and relocating the sleeping area.Details
remodeling the existing kitchen and bathroom. add a new half bathroom. remove a bearing wall. add a new office room and relocating the sleeping area. | $90,000 |