Block 3624, lot 031
1001 Castro St
- City’s use
- Multi-Family Residential
- Built
- 1961
- Stories
- 2
- Units
- 3
- Rooms
- 3 bathrooms
- Building
- 2,972 sq ft
- Lot
- 2,120 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 2, 2025 | Completed final sign-off Dec 2025 | 1001 Castro St | Elm Roofing Contractors Inc Dba Element | re-roofing w/ hot works at high roof and low roof. no work to (e) roof structural sheathing.Details
re-roofing w/ hot works at high roof and low roof. no work to (e) roof structural sheathing. | $10,000 |
| Nov 18, 2025 | In progress filed Nov 2025, not yet issued | 1001 Castro St | voluntary strengthening. add plywood sheer wall and a steel frame with concrete grade beam.Details
voluntary strengthening. add plywood sheer wall and a steel frame with concrete grade beam. | $40,000 | |
| Apr 24, 2025 | Completed final sign-off Jul 2025 | 1001 Castro St | Seismic Retrofitters Inc. | voluntary structural strengthening in crawl space adn garage. bolt foundation at 32" oc w/ 3.4 tr min 7" embedment with dewalt pure 110 expoxy. install 1/2 struc 1 ply at perimeter nail 6" edge 12" field skip areas with utilities. no work in commercial occupancyDetails
voluntary structural strengthening in crawl space adn garage. bolt foundation at 32" oc w/ 3.4 tr min 7" embedment with dewalt pure 110 expoxy. install 1/2 struc 1 ply at perimeter nail 6" edge 12" field skip areas with utilities. no work in commercial occupancy | $32,380 |
| Oct 25, 2024 | Completed final sign-off Mar 2025 | 1001 Castro St | E B W Builders Inc | to comply with abe ord per 51-16. installation of signage and doorbell . request for technical infeasibility. abe202408270238 installation of sign, doorbell provide location of entry as equivalent facilitation request technical infeasibilityDetails
to comply with abe ord per 51-16. installation of signage and doorbell . request for technical infeasibility. abe202408270238 installation of sign, doorbell provide location of entry as equivalent facilitation request technical infeasibility | $2,500 |
| Jul 9, 2019 | Completed final sign-off Oct 2019 | 1001 Castro St | Terence Mcmahon Construction | repair exterior staircase at rear of building. less than 50%Details
repair exterior staircase at rear of building. less than 50% | $13,000 |
| Apr 8, 2009 | Completed final sign-off Apr 2009 | 589 Alvarado St | New City Construction Group Inc | reroofing.Details
reroofing. | $12,500 |
| Feb 17, 2009 | Completed final sign-off Jun 2009 | 589 Alvarado St | Donald Wu | remodel bath, remodel kitchen, replace 5 windows, same size and location, no structural work, u-factor, 0.67 max.Details
remodel bath, remodel kitchen, replace 5 windows, same size and location, no structural work, u-factor, 0.67 max. | $9,000 |
| Jan 7, 2009 | Never finaled issued Jan 2009, no final | 1003 Castro St | street space & sidewalk repair.Details
street space & sidewalk repair. |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Donald Wu, E B W Builders Inc, Elm Roofing Contractors Inc Dba Element, New City Construction Group Inc, Seismic Retrofitters Inc., Terence Mcmahon Construction
- Architects
- Daniel Shapero
- Engineers
- Engin Yagmur
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.