Donald Wu
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Aug 2026
- Last 24 months
- 5 permits filed
30 permits since 2000: 21 completed, 4 in progress, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Aug 2026 | 2150 Hyde St | unit 1 interior remodel ref#202507020071 & 202607275624: remove (e) non-bearing kitchen wall & door. extend bathroom by removing (e) non-bearing interior wall & constructing (n) non-bearing wall. remove (e) closets & construct 2 (n) closets. (e) covered window opening on lightwell will be re...Details
unit 1 interior remodel ref#202507020071 & 202607275624: remove (e) non-bearing kitchen wall & door. extend bathroom by removing (e) non-bearing interior wall & constructing (n) non-bearing wall. remove (e) closets & construct 2 (n) closets. (e) covered window opening on lightwell will be re... | $10,000 |
| Jul 27, 2026 | In progress issued Aug 2026 | 2150 Hyde St | recommencement and completion of work approved under permit#202507020071.Details
recommencement and completion of work approved under permit#202507020071. | $15,000 |
| Dec 5, 2025 | In progress issued Dec 2025 | 208 Anzavista Av | replacing (e) (19) windows at front and back of house. same size and same location. in kindDetails
replacing (e) (19) windows at front and back of house. same size and same location. in kind | $30,000 |
| Sep 23, 2025 | In progress issued Jan 2026 | 2150 Hyde St | to abate nov 202307274 items 5 and 6- remove illegal deck and restore in kind (e) deck over driveway facing front. proposed repair of existing roof over driveway.Details
to abate nov 202307274 items 5 and 6- remove illegal deck and restore in kind (e) deck over driveway facing front. proposed repair of existing roof over driveway. | $10,000 |
| Jul 2, 2025 | Completed final sign-off Aug 2026 | 2150 Hyde St | comply nov# 202307274 #2: unit #1; remodel kitchen, remodel 2 bathrooms, repair floor, paint unit interior.Details
comply nov# 202307274 #2: unit #1; remodel kitchen, remodel 2 bathrooms, repair floor, paint unit interior. | $50,000 |
| Jan 8, 2024 | Completed final sign-off Feb 2025 | 4444 Balboa St | 1)fire damaged repairing to fix all the damaged rooms at 3rd floor unit #306. replace and install all plmbg, mech, elect.l work to current code. replace all gyped as well as flooring finishing match extg like kind. to comply with nov #202307502. 2)repair partial fire damaged roofing per plan.Details
1)fire damaged repairing to fix all the damaged rooms at 3rd floor unit #306. replace and install all plmbg, mech, elect.l work to current code. replace all gyped as well as flooring finishing match extg like kind. to comply with nov #202307502. 2)repair partial fire damaged roofing per plan. | $160,000 |
| Aug 11, 2023 | Completed final sign-off Aug 2026 | 125 Colon Av | remodel (e) bathrooms & kitchen at 2nd fl. relocate (e) stair from 2nd to ground fl. new rooms downstair. replace (e) foundation & slap, footing with post at ground fl. replace (e) gypbd with new 5/8" type x. no exterior work.Details
remodel (e) bathrooms & kitchen at 2nd fl. relocate (e) stair from 2nd to ground fl. new rooms downstair. replace (e) foundation & slap, footing with post at ground fl. replace (e) gypbd with new 5/8" type x. no exterior work. | $90,000 |
| Jan 24, 2022 | Completed final sign-off Mar 2022 | 2150 Hyde St | replace floor tiles on the lobby of building. approx 400 sqft.Details
replace floor tiles on the lobby of building. approx 400 sqft. | $8,500 |
| Jun 11, 2019 | Completed final sign-off Jun 2021 | 423 11th Av | 2nd fl - convert (e) dining to (n) kitchen. convert (e) powder to (n) laundry. convert (e) kitchen to (n) bedroom. add 2 baths; 3rd fl - convert (e) dining to (n) kitchen. convert (e) powder to (n) laundry. convert (e) kitchen to (n) bedroom. add 1 bath, 1 master bath (4 - fixture)Details
2nd fl - convert (e) dining to (n) kitchen. convert (e) powder to (n) laundry. convert (e) kitchen to (n) bedroom. add 2 baths; 3rd fl - convert (e) dining to (n) kitchen. convert (e) powder to (n) laundry. convert (e) kitchen to (n) bedroom. add 1 bath, 1 master bath (4 - fixture) | $100,000 |
| May 12, 2017 | Completed final sign-off May 2018 | 319 21st Av | front entry hallway, replace drywall, (basement) replace drywall remodel bathroom (first flr) remodel kitchen & bathroom, replace all drywalls in unit 1a (second flr) remodel bathroom ,replace s.wall drywalls, replace windows in back & lgihtwell repair siding in back & sideDetails
front entry hallway, replace drywall, (basement) replace drywall remodel bathroom (first flr) remodel kitchen & bathroom, replace all drywalls in unit 1a (second flr) remodel bathroom ,replace s.wall drywalls, replace windows in back & lgihtwell repair siding in back & side | $150,000 |
| Jan 13, 2017 | Never finaled issued Jan 2017, no final | 27 Alta St | replacing front lower siding panels and fixing water damage. repair and replace with cedar wood siding in kind.apprpx 400 sfDetails
replacing front lower siding panels and fixing water damage. repair and replace with cedar wood siding in kind.apprpx 400 sf | $6,000 |
| Oct 19, 2016 | Completed final sign-off Dec 2016 | 27 Alta St | kitchen remodel on first floor. no new wall and no existing wall relocation. sheet rock where removed shall be replaced by 5/8" type x gyp. board. lighting shall comply with cec 150.0(k)3.Details
kitchen remodel on first floor. no new wall and no existing wall relocation. sheet rock where removed shall be replaced by 5/8" type x gyp. board. lighting shall comply with cec 150.0(k)3. | $2,500 |
| Aug 23, 2016 | Completed final sign-off Dec 2016 | 27 Alta St | remodel (2) bathrooms on first floor.Details
remodel (2) bathrooms on first floor. | $8,000 |
| Jun 8, 2016 | Completed final sign-off Jul 2016 | 418 Arguello Bl | apt 5: remodel bathroom: sink, light, fixtures, outlets, cabinets. remodel kitchen: cabs, sink, light, fixtures, switch & plugs.Details
apt 5: remodel bathroom: sink, light, fixtures, outlets, cabinets. remodel kitchen: cabs, sink, light, fixtures, switch & plugs. | $5,000 |
| Sep 9, 2014 | Completed final sign-off Sep 2014 | 6933 California St | dry rot repair on back stair & porch. all work will complete as same the (e) finished. less than 50%.Details
dry rot repair on back stair & porch. all work will complete as same the (e) finished. less than 50%. | $3,500 |
| Aug 26, 2013 | Expired or cancelled expired Nov 2017 | 4444 Balboa St | replace 75 windows in-kind - front side & left side and back (with fiberglass double paned windows), u-factor=0.4 max.Details
replace 75 windows in-kind - front side & left side and back (with fiberglass double paned windows), u-factor=0.4 max. | $7,500 |
| Apr 19, 2013 | Completed final sign-off May 2013 | 27 Alta St | repair front left two windows, replace trims - no window replacement, work is to replace trims around windows only.Details
repair front left two windows, replace trims - no window replacement, work is to replace trims around windows only. | $1,000 |
| Apr 25, 2012 | Completed final sign-off Jul 2012 | 1639 22nd Av | repair the front right wall of garage in kind, stucco repair to match existingDetails
repair the front right wall of garage in kind, stucco repair to match existing | $2,000 |
| Feb 22, 2011 | Completed final sign-off Jul 2011 | 1714 27th Av | divide (e) bedroom in basement (garage) into 2 bedrooms, relocate (e) full bathroom, add a family room and a new furnace for the basement rooms. remodel (e) full bathroom & add a new bathroom. remodel (e) kitchen on 2nd floorDetails
divide (e) bedroom in basement (garage) into 2 bedrooms, relocate (e) full bathroom, add a family room and a new furnace for the basement rooms. remodel (e) full bathroom & add a new bathroom. remodel (e) kitchen on 2nd floor | $30,000 |
| May 26, 2009 | Completed final sign-off Dec 2009 | 1242 22nd Av | revision to pa #200904166376, relocate kitchen & bathrm @ 2nd fl, relocate bathrms as shown @ ground fl.Details
revision to pa #200904166376, relocate kitchen & bathrm @ 2nd fl, relocate bathrms as shown @ ground fl. | |
| Apr 16, 2009 | Completed final sign-off Dec 2009 | 1242 22nd Av | relocate kitchen, remodel one existing bathrm & convert existing sun rm to two new bathrms, all work at second floor. construct two bedrm, two bathrm under existing sunrm in-fill & laundry rm, all work at ground floor.Details
relocate kitchen, remodel one existing bathrm & convert existing sun rm to two new bathrms, all work at second floor. construct two bedrm, two bathrm under existing sunrm in-fill & laundry rm, all work at ground floor. | $48,000 |
| Feb 17, 2009 | Completed final sign-off Jun 2009 | 589 Alvarado St | remodel bath, remodel kitchen, replace 5 windows, same size and location, no structural work, u-factor, 0.67 max.Details
remodel bath, remodel kitchen, replace 5 windows, same size and location, no structural work, u-factor, 0.67 max. | $9,000 |
| Mar 24, 2008 | Completed final sign-off Sep 2008 | 341 Dorantes Av | remodel (e) kitchen, bath room,and add one new bathroom at 2nd floor. construct one bedroom, 2 bathrooms, sauna room and remodel (e) fam.room at ground floorDetails
remodel (e) kitchen, bath room,and add one new bathroom at 2nd floor. construct one bedroom, 2 bathrooms, sauna room and remodel (e) fam.room at ground floor | $76,000 |
| Jan 3, 2008 | Expired or cancelled expired Feb 2009 | 48 Manzanita Av | install 4 electrical heaters in first floor including title 24 report.Details
install 4 electrical heaters in first floor including title 24 report. | $600 |
| Nov 9, 2007 | Expired or cancelled expired Aug 2008 | 48 Manzanita Av | work on #48 - add new private interior stair from 2/fl to 1/fl. convert (e) 1/fl social rm area to (n) family rm, master suite incl. powder rm, master bath. convert kitchen to wet bar. replace (e) ground floor single glazed alum windows w/ new dual glazed vinyl & expand family rm window to door.Details
work on #48 - add new private interior stair from 2/fl to 1/fl. convert (e) 1/fl social rm area to (n) family rm, master suite incl. powder rm, master bath. convert kitchen to wet bar. replace (e) ground floor single glazed alum windows w/ new dual glazed vinyl & expand family rm window to door. | $15,000 |
| Sep 24, 2007 | Expired or cancelled expired Jan 2010 | 2150 Hyde St | to comply w/nov#200717372. interior remodel of unit310 @ 6th fl. remodel kitchen , bathrooms. (no structural work). install new washer and dryer and water heater.Details
to comply w/nov#200717372. interior remodel of unit310 @ 6th fl. remodel kitchen , bathrooms. (no structural work). install new washer and dryer and water heater. | $18,000 |
| May 21, 2007 | Completed final sign-off Jul 2007 | 476 46th Av | rebuild winder stair, prodvide fire blocking, fire caulking. additional works for entire building. increase value of job per corrective notice.Details
rebuild winder stair, prodvide fire blocking, fire caulking. additional works for entire building. increase value of job per corrective notice. | $50,000 |
| Feb 15, 2006 | Completed final sign-off Mar 2006 | 162 12th Av | garage foundation do bolts, 5/8" ,7" embedment w/2"x2"x3/16" plate washer.Details
garage foundation do bolts, 5/8" ,7" embedment w/2"x2"x3/16" plate washer. | $750 |
| Dec 16, 2005 | Completed final sign-off Mar 2006 | 162 12th Av | remodel bathroom in unit 164 only,replace toilet,sink,bath & tile.Details
remodel bathroom in unit 164 only,replace toilet,sink,bath & tile. | $2,500 |
| Oct 17, 2005 | Completed final sign-off Nov 2005 | 132 Judson Av | reroofingDetails
reroofing | $12,000 |