Back to bathroom remodel contractors
Donald Wu
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Aug 2026
- Last 24 months
- 5 permits filed
30 permits since 2000: 21 completed, 4 in progress, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 10 completed, 1 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 167 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Aug 2026 | 2150 Hyde St | unit 1 interior remodel ref#202507020071 & 202607275624: remove (e) non-bearing kitchen wall & door. extend bathroom by removing (e) non-bearing interior wall & constructing (n) non-bearing wall. remove (e) closets & construct 2 (n) closets. (e) covered window opening on lightwell will be re...Details
unit 1 interior remodel ref#202507020071 & 202607275624: remove (e) non-bearing kitchen wall & door. extend bathroom by removing (e) non-bearing interior wall & constructing (n) non-bearing wall. remove (e) closets & construct 2 (n) closets. (e) covered window opening on lightwell will be re... | $10,000 |
| Jul 2, 2025 | Completed final sign-off Aug 2026 | 2150 Hyde St | comply nov# 202307274 #2: unit #1; remodel kitchen, remodel 2 bathrooms, repair floor, paint unit interior.Details
comply nov# 202307274 #2: unit #1; remodel kitchen, remodel 2 bathrooms, repair floor, paint unit interior. | $50,000 |
| Aug 11, 2023 | Completed final sign-off Aug 2026 | 125 Colon Av | remodel (e) bathrooms & kitchen at 2nd fl. relocate (e) stair from 2nd to ground fl. new rooms downstair. replace (e) foundation & slap, footing with post at ground fl. replace (e) gypbd with new 5/8" type x. no exterior work.Details
remodel (e) bathrooms & kitchen at 2nd fl. relocate (e) stair from 2nd to ground fl. new rooms downstair. replace (e) foundation & slap, footing with post at ground fl. replace (e) gypbd with new 5/8" type x. no exterior work. | $90,000 |
| Jun 11, 2019 | Completed final sign-off Jun 2021 | 423 11th Av | 2nd fl - convert (e) dining to (n) kitchen. convert (e) powder to (n) laundry. convert (e) kitchen to (n) bedroom. add 2 baths; 3rd fl - convert (e) dining to (n) kitchen. convert (e) powder to (n) laundry. convert (e) kitchen to (n) bedroom. add 1 bath, 1 master bath (4 - fixture)Details
2nd fl - convert (e) dining to (n) kitchen. convert (e) powder to (n) laundry. convert (e) kitchen to (n) bedroom. add 2 baths; 3rd fl - convert (e) dining to (n) kitchen. convert (e) powder to (n) laundry. convert (e) kitchen to (n) bedroom. add 1 bath, 1 master bath (4 - fixture) | $100,000 |
| May 12, 2017 | Completed final sign-off May 2018 | 319 21st Av | front entry hallway, replace drywall, (basement) replace drywall remodel bathroom (first flr) remodel kitchen & bathroom, replace all drywalls in unit 1a (second flr) remodel bathroom ,replace s.wall drywalls, replace windows in back & lgihtwell repair siding in back & sideDetails
front entry hallway, replace drywall, (basement) replace drywall remodel bathroom (first flr) remodel kitchen & bathroom, replace all drywalls in unit 1a (second flr) remodel bathroom ,replace s.wall drywalls, replace windows in back & lgihtwell repair siding in back & side | $150,000 |
| Aug 23, 2016 | Completed final sign-off Dec 2016 | 27 Alta St | remodel (2) bathrooms on first floor.Details
remodel (2) bathrooms on first floor. | $8,000 |
| Jun 8, 2016 | Completed final sign-off Jul 2016 | 418 Arguello Bl | apt 5: remodel bathroom: sink, light, fixtures, outlets, cabinets. remodel kitchen: cabs, sink, light, fixtures, switch & plugs.Details
apt 5: remodel bathroom: sink, light, fixtures, outlets, cabinets. remodel kitchen: cabs, sink, light, fixtures, switch & plugs. | $5,000 |
| Feb 22, 2011 | Completed final sign-off Jul 2011 | 1714 27th Av | divide (e) bedroom in basement (garage) into 2 bedrooms, relocate (e) full bathroom, add a family room and a new furnace for the basement rooms. remodel (e) full bathroom & add a new bathroom. remodel (e) kitchen on 2nd floorDetails
divide (e) bedroom in basement (garage) into 2 bedrooms, relocate (e) full bathroom, add a family room and a new furnace for the basement rooms. remodel (e) full bathroom & add a new bathroom. remodel (e) kitchen on 2nd floor | $30,000 |
| Feb 17, 2009 | Completed final sign-off Jun 2009 | 589 Alvarado St | remodel bath, remodel kitchen, replace 5 windows, same size and location, no structural work, u-factor, 0.67 max.Details
remodel bath, remodel kitchen, replace 5 windows, same size and location, no structural work, u-factor, 0.67 max. | $9,000 |
| Mar 24, 2008 | Completed final sign-off Sep 2008 | 341 Dorantes Av | remodel (e) kitchen, bath room,and add one new bathroom at 2nd floor. construct one bedroom, 2 bathrooms, sauna room and remodel (e) fam.room at ground floorDetails
remodel (e) kitchen, bath room,and add one new bathroom at 2nd floor. construct one bedroom, 2 bathrooms, sauna room and remodel (e) fam.room at ground floor | $76,000 |
| Nov 9, 2007 | Expired or cancelled expired Aug 2008 | 48 Manzanita Av | work on #48 - add new private interior stair from 2/fl to 1/fl. convert (e) 1/fl social rm area to (n) family rm, master suite incl. powder rm, master bath. convert kitchen to wet bar. replace (e) ground floor single glazed alum windows w/ new dual glazed vinyl & expand family rm window to door.Details
work on #48 - add new private interior stair from 2/fl to 1/fl. convert (e) 1/fl social rm area to (n) family rm, master suite incl. powder rm, master bath. convert kitchen to wet bar. replace (e) ground floor single glazed alum windows w/ new dual glazed vinyl & expand family rm window to door. | $15,000 |
| Sep 24, 2007 | Expired or cancelled expired Jan 2010 | 2150 Hyde St | to comply w/nov#200717372. interior remodel of unit310 @ 6th fl. remodel kitchen , bathrooms. (no structural work). install new washer and dryer and water heater.Details
to comply w/nov#200717372. interior remodel of unit310 @ 6th fl. remodel kitchen , bathrooms. (no structural work). install new washer and dryer and water heater. | $18,000 |
| Dec 16, 2005 | Completed final sign-off Mar 2006 | 162 12th Av | remodel bathroom in unit 164 only,replace toilet,sink,bath & tile.Details
remodel bathroom in unit 164 only,replace toilet,sink,bath & tile. | $2,500 |