Maverick Construction & Project Executio
- Based in
- San Leandro
- On San Francisco permits
- Jun 2020 to Jun 2023
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 12, 2023 | Completed final sign-off Jun 2023 | 928 Van Ness Av | revision to bpa#202112204686, remove scissor gates from exterior from apprvd scope, keep (e) roll down shutters, relocate ada counter, add wall into inventory room. no concumption on site dph n/a on original permitDetails
revision to bpa#202112204686, remove scissor gates from exterior from apprvd scope, keep (e) roll down shutters, relocate ada counter, add wall into inventory room. no concumption on site dph n/a on original permit | $500 |
| Aug 16, 2022 | Completed final sign-off Dec 2022 | 224 Filbert St | replace kitchen cabinets/counters, and overhood. add a few recessed lights. @ top unitDetails
replace kitchen cabinets/counters, and overhood. add a few recessed lights. @ top unit | $50,000 |
| Dec 20, 2021 | Completed final sign-off Jun 2023 | 928 Van Ness Av | change of use of 3000 sf under the planning code from retail to cannabis retail with no change in occupancy code on the ground floor of a one story building over basement. interior: new product display, interior wall, floor finishes, new accessible restroom for customers. patch and repair as needed.Details
change of use of 3000 sf under the planning code from retail to cannabis retail with no change in occupancy code on the ground floor of a one story building over basement. interior: new product display, interior wall, floor finishes, new accessible restroom for customers. patch and repair as needed. | $60,000 |
| Dec 3, 2020 | Never finaled issued Sep 2021, no final | 321 Topeka Av | remove wall between living room & kitchen & replace cabinets & countertops. add lighting. legalizing unwarranted addition. remove wetbar (planning dept required)Details
remove wall between living room & kitchen & replace cabinets & countertops. add lighting. legalizing unwarranted addition. remove wetbar (planning dept required) | $20,000 |
| Jun 25, 2020 | Completed final sign-off Apr 2021 | 1255 California St | bathroom in kind in place. full bathDetails
bathroom in kind in place. full bath | $5,000 |