Back to kitchen remodel contractors
Maverick Construction & Project Executio
- Based in
- San Leandro
- On San Francisco permits
- Jun 2020 to Jun 2023
- Last 24 months
- 0 permits filed
5 permits since 2000: 4 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 147 days from filing to permit and 114 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 16, 2022 | Completed final sign-off Dec 2022 | 224 Filbert St | replace kitchen cabinets/counters, and overhood. add a few recessed lights. @ top unitDetails
replace kitchen cabinets/counters, and overhood. add a few recessed lights. @ top unit | $50,000 |
| Dec 3, 2020 | Never finaled issued Sep 2021, no final | 321 Topeka Av | remove wall between living room & kitchen & replace cabinets & countertops. add lighting. legalizing unwarranted addition. remove wetbar (planning dept required)Details
remove wall between living room & kitchen & replace cabinets & countertops. add lighting. legalizing unwarranted addition. remove wetbar (planning dept required) | $20,000 |