Back to bathroom remodel contractors
Centric Construction Inc
- Based in
- Brisbane
- On San Francisco permits
- Mar 2007 to Oct 2026
- Last 24 months
- 14 permits filed
313 permits since 2000: 237 completed, 6 in progress, 58 never finaled, 12 expired or cancelled.
Of the 58 never-finaled permits, 3 are 3 to 5 years old, 23 are 5 to 10 years old, 32 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 16 completed, 3 never finaled. Typically 47 days from filing to permit and 308 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2022 | Completed final sign-off Apr 2023 | 145 Leavenworth St | revision to pa 201804136335-s3. revised walls with unit bathrooms. revised wall layout with community laundry space.Details
revision to pa 201804136335-s3. revised walls with unit bathrooms. revised wall layout with community laundry space. | |
| Mar 31, 2022 | Completed final sign-off Apr 2023 | 361 Turk St | revision to pa# 201804136327 s3. revised walls with unit bathrooms. revised wall layout with community laundry space.Details
revision to pa# 201804136327 s3. revised walls with unit bathrooms. revised wall layout with community laundry space. | |
| Feb 4, 2022 | Completed final sign-off Aug 2022 | 450 Powell St | rev to pa202107094114. changes include revised layouts for womens, mens and gender newtual bathrooms.Details
rev to pa202107094114. changes include revised layouts for womens, mens and gender newtual bathrooms. | |
| Aug 31, 2021 | Completed final sign-off Nov 2023 | 450 Powell St | guestroom remodel for levels 3-20: non-structural demo of interior finishes and fixtures of (e) hotel rooms partial remodel of ada rooms and suites to achieve accessibility reqs.partial remodel of non-accessible rooms to suites and premium rooms with enlarged bathrooms. see plans for add'l room workDetails
guestroom remodel for levels 3-20: non-structural demo of interior finishes and fixtures of (e) hotel rooms partial remodel of ada rooms and suites to achieve accessibility reqs.partial remodel of non-accessible rooms to suites and premium rooms with enlarged bathrooms. see plans for add'l room work | $1,049,000 |
| Dec 19, 2019 | Completed final sign-off Nov 2021 | 400 Winston Dr | new non load bearing walls (n) interior doors (n) ada compliant public bathrooms,(n) employee bathroom & shower room, elec closet, (n) janitors closet, (n) dressing rooms, elec, mech, plumbing, fire sprinkler under sep permitDetails
new non load bearing walls (n) interior doors (n) ada compliant public bathrooms,(n) employee bathroom & shower room, elec closet, (n) janitors closet, (n) dressing rooms, elec, mech, plumbing, fire sprinkler under sep permit | $1,000,000 |
| Jul 11, 2019 | Never finaled issued Aug 2019, no final | 1333 Columbus Av | fire repair exterior and interior: new accessible restroom on ground floor. new bathroom 3rd floor residence. new interior stairs throughout, new elevator, new storefront at ground floor. comply with nov #201876901. tenant improvement under separate permitDetails
fire repair exterior and interior: new accessible restroom on ground floor. new bathroom 3rd floor residence. new interior stairs throughout, new elevator, new storefront at ground floor. comply with nov #201876901. tenant improvement under separate permit | $320,000 |
| May 24, 2018 | Completed final sign-off Oct 2019 | 140 Mason St | layout revision to app#201611152731. scope of work includes revisions to proposed accessible guestroom bath types, standard bathrooms, and shared kitchen/jaundry, mep, fa, fs under seperate permit. no increase to occupancy. no rduction to sro count. to comply with nov 201459891.Details
layout revision to app#201611152731. scope of work includes revisions to proposed accessible guestroom bath types, standard bathrooms, and shared kitchen/jaundry, mep, fa, fs under seperate permit. no increase to occupancy. no rduction to sro count. to comply with nov 201459891. | |
| Nov 15, 2016 | Completed final sign-off Oct 2019 | 140 Mason St | comply with nov# 201459891. cpmplete renovation of all m.e.p. systems on building. addition of 37 guest bathroom & conversion of dining room & basement into restaurant on basement & ground floor. upgrade includes installation of new gurney sized elevator. sprinkler & fire alarm under seperate permitDetails
comply with nov# 201459891. cpmplete renovation of all m.e.p. systems on building. addition of 37 guest bathroom & conversion of dining room & basement into restaurant on basement & ground floor. upgrade includes installation of new gurney sized elevator. sprinkler & fire alarm under seperate permit | $5,500,000 |
| Nov 23, 2015 | Completed final sign-off May 2016 | 2575 Marin St | demo of (e) entry door & exterior windows; (n) storefront entry & (n) aluminum windows, replace in kind; (n) stand alone 2 story office bldg, (n) load bearing & non-load bearing partitions, 3 (n) ada compliant bathrooms & 1 drinking fountainDetails
demo of (e) entry door & exterior windows; (n) storefront entry & (n) aluminum windows, replace in kind; (n) stand alone 2 story office bldg, (n) load bearing & non-load bearing partitions, 3 (n) ada compliant bathrooms & 1 drinking fountain | $750,000 |
| Sep 15, 2015 | Never finaled issued Feb 2016, no final | 1023 Mission St | construction of (n) non-load bearing partitions, doors & paint. (n) concrete slab for car wash. (n) anchor support for car lifts. 2 dad compliant bathrooms & drinking foundation. mep, f/a and sprinklers deferred. n/a maher ordinanceDetails
construction of (n) non-load bearing partitions, doors & paint. (n) concrete slab for car wash. (n) anchor support for car lifts. 2 dad compliant bathrooms & drinking foundation. mep, f/a and sprinklers deferred. n/a maher ordinance | $900,000 |
| Aug 10, 2015 | Completed final sign-off Nov 2015 | 2575 Marin St | demo (e) non-compliant exterior concrete stairs, ramps & guardrails, construct (n) exterior concrete stairs & pedestrian ramp, (n) guardrails & 2 (n) bathrooms. n/a ordinance #155-13Details
demo (e) non-compliant exterior concrete stairs, ramps & guardrails, construct (n) exterior concrete stairs & pedestrian ramp, (n) guardrails & 2 (n) bathrooms. n/a ordinance #155-13 | $400,000 |
| Dec 19, 2012 | Never finaled issued Aug 2013, no final | 474 Ofarrell St | umb seismic retrofit, ada bathroom.Details
umb seismic retrofit, ada bathroom. | $250,000 |
| Oct 22, 2012 | Completed final sign-off Jun 2013 | 450 Powell St | 2nd & 3rd floors-3rd fl-reconfiguration of 3 rooms to refinish guest bathrooms. 2nd fl-replacing sinks in (e) restrooms & replacing a ramp handrail & stair handrailDetails
2nd & 3rd floors-3rd fl-reconfiguration of 3 rooms to refinish guest bathrooms. 2nd fl-replacing sinks in (e) restrooms & replacing a ramp handrail & stair handrail | $75,000 |
| Oct 16, 2012 | Completed final sign-off Jun 2013 | 799 Van Ness Av | basement level-revision to pa# 2012-0809-6937-relocation of accessibile bathroom & storage area. parking layout re-configuredDetails
basement level-revision to pa# 2012-0809-6937-relocation of accessibile bathroom & storage area. parking layout re-configured | |
| Sep 25, 2012 | Completed final sign-off Jun 2014 | 500 Sansome St | consturction of new accessible bathrooms and drinking fountains at vacant first floor and mezzanineDetails
consturction of new accessible bathrooms and drinking fountains at vacant first floor and mezzanine | $75,000 |
| Aug 9, 2012 | Completed final sign-off Jun 2013 | 799 Van Ness Av | install non-load bearing partitions, doors, ceilings. install new lighting & power on all floors (basmt,1st & 2nd flr), construction of four (4) new ada bathrooms on all floors (basmt,1st & 2nd flr). install two (2) new drinking fountains on 2nd floor.Details
install non-load bearing partitions, doors, ceilings. install new lighting & power on all floors (basmt,1st & 2nd flr), construction of four (4) new ada bathrooms on all floors (basmt,1st & 2nd flr). install two (2) new drinking fountains on 2nd floor. | $350,000 |
| Jul 2, 2012 | Completed final sign-off Jun 2014 | 500 Sansome St | 7th floor: removal of existing bathrooms. construction of new accessible bathrooms & drinking fountains. 8th floor: removal of existing non-load bearing walls at vacant suite. removal of existing bathrooms. construction of new accessible bathrooms & drinking fountains.Details
7th floor: removal of existing bathrooms. construction of new accessible bathrooms & drinking fountains. 8th floor: removal of existing non-load bearing walls at vacant suite. removal of existing bathrooms. construction of new accessible bathrooms & drinking fountains. | $300,000 |
| Mar 7, 2012 | Completed final sign-off Apr 2013 | 631 Howard St | int. voluntary seismic & shell improvements on basement, 1st & 2nd flrs.work includes demo of (e)slabs (n) concrete reinforcing panels, strengthening floor diaphragms. (n) partitions (n) bathrooms.(n) concrete stairways. no exterior work. fire protection under separate permit.Details
int. voluntary seismic & shell improvements on basement, 1st & 2nd flrs.work includes demo of (e)slabs (n) concrete reinforcing panels, strengthening floor diaphragms. (n) partitions (n) bathrooms.(n) concrete stairways. no exterior work. fire protection under separate permit. | $420,000 |
| Jan 9, 2012 | Completed final sign-off Jun 2013 | 301 Twin Peaks Bl | revision to pa #200810295441: add guardrail closets, bedrm, data closet,bath,concrete planters,stairs,landing, storage space & associated doors,wall are removed. panty,toilet rm,elevator doors are reconfigured. balcony rails are glass & custom metal. stairs are reconfigured,balcony is cantileavered.Details
revision to pa #200810295441: add guardrail closets, bedrm, data closet,bath,concrete planters,stairs,landing, storage space & associated doors,wall are removed. panty,toilet rm,elevator doors are reconfigured. balcony rails are glass & custom metal. stairs are reconfigured,balcony is cantileavered. | $3,000 |