Kevin Butler
- Listed as
- engineer
- On San Francisco permits
- Sep 2025 to Sep 2025
1 permit since 2000 (engineer on 1 permit): 1 in progress.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 3, 2025 | In progress issued Oct 2025 | 1 South Van Ness Av | W E Lyons Construction Co | revison to pa# 202203079381: create a temporary structural floor opening in existing deck floor. construction consists of structural support and new pan deck welded back with dowels in concrete after equipment is installedDetails
revison to pa# 202203079381: create a temporary structural floor opening in existing deck floor. construction consists of structural support and new pan deck welded back with dowels in concrete after equipment is installed | $10,000 |