Permits filed here
45 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2023 | Completed final sign-off Oct 2024 | 988 Howard St | Siemens Industry, Inc. | fire only work "to verify (e) sound levels in sleeping areas, complying with sffc section 1103.7.6.1." no ref bpa.Details
fire only work "to verify (e) sound levels in sleeping areas, complying with sffc section 1103.7.6.1." no ref bpa. | |
| May 1, 2023 | Expired or cancelled cancelled Jan 2026 | 185 06th St | Arana Group, Inc. | remove drinking fountain/replace w/a sink with cabinetsDetails
remove drinking fountain/replace w/a sink with cabinets | $5,000 |
| Nov 1, 2022 | Completed final sign-off Mar 2024 | 988 Howard St | Mastec Network Solutions Inc | sprint/t-mobile decommission and removal. removing coax and cables, ice bridge, antennas, rru's, cabinets.Details
sprint/t-mobile decommission and removal. removing coax and cables, ice bridge, antennas, rru's, cabinets. | $20,000 |
| Jul 27, 2022 | Completed final sign-off Jan 2024 | 988 Howard St | Modus Rex Llc | dish wireless: install 5(n) antennas, 10(n) rrus, 1(n) platform, 1(n) cabinet, 2(n) batteriesDetails
dish wireless: install 5(n) antennas, 10(n) rrus, 1(n) platform, 1(n) cabinet, 2(n) batteries | $135,000 |
| Feb 11, 2022 | Completed final sign-off Mar 2022 | 988 Howard St | Smart Building Inc. | unit 305. include all associated works to comply with nov #202185250. install new kitchen cabinets, countertops, electric range hood, sink and associated plumbing following the original layout.Details
unit 305. include all associated works to comply with nov #202185250. install new kitchen cabinets, countertops, electric range hood, sink and associated plumbing following the original layout. | $5,540 |
| Dec 9, 2019 | Never finaled issued Dec 2019, no final | 990 Howard St | per owner's request, cfc was issued on 10/20/2006, to document the address in building; 988 howard st is residential address, 185, 193-6th street are commercial addresses, delete not used address; 990, 998 howard street.Details
per owner's request, cfc was issued on 10/20/2006, to document the address in building; 988 howard st is residential address, 185, 193-6th street are commercial addresses, delete not used address; 990, 998 howard street. | ||
| Mar 23, 2018 | Completed final sign-off Dec 2018 | 988 Howard St | Metropolitan Electrical Construction | sprint - r&r (e) antenna add 3 new rru maher naDetails
sprint - r&r (e) antenna add 3 new rru maher na | $12,000 |
| Dec 9, 2013 | Expired or cancelled cancelled Jan 2026 | 988 Howard St | Overland Contracting Inc | revision to pa 201205150469 - cable attachement details were revised. no other changes to antennas or equipment.Details
revision to pa 201205150469 - cable attachement details were revised. no other changes to antennas or equipment. | $45,000 |
| Apr 30, 2013 | Completed final sign-off Apr 2015 | 988 Howard St | Overland Contracting Inc | revised drawings for previously approved pa# 201205150469. cable tray route was revised. no other changes to antennas or equipment.Details
revised drawings for previously approved pa# 201205150469. cable tray route was revised. no other changes to antennas or equipment. | $6,000 |
| Jan 2, 2013 | Never finaled issued Jan 2013, no final | 988 Howard St | street space, sidewalk repair and mta parkingDetails
street space, sidewalk repair and mta parking | ||
| May 15, 2012 | Expired or cancelled cancelled Jun 2018 | 988 Howard St | Overland Contracting Inc | wireless facility modification: replace 3 panel antennas w/ 3 (n) panel antennas; replace 2 (e) equipment cabinets w/ 2 (n) equipment cabinets; no power upgradeDetails
wireless facility modification: replace 3 panel antennas w/ 3 (n) panel antennas; replace 2 (e) equipment cabinets w/ 2 (n) equipment cabinets; no power upgrade | $45,000 |
| Jun 10, 2011 | Completed final sign-off Aug 2011 | 193 06th St | Starlite Electric Inc. | subway. install 3 horn/strobes and 1 pull station on 1st/ground floorDetails
subway. install 3 horn/strobes and 1 pull station on 1st/ground floor | $3,000 |
| May 19, 2011 | Completed final sign-off Sep 2011 | 185 06th St | Nikolay Zilinskiy | tenant improvement to existing fire sprinkler system. relocate and remove fire sprinkler heads per tenant improvement (3 relocates) (14 adds)Details
tenant improvement to existing fire sprinkler system. relocate and remove fire sprinkler heads per tenant improvement (3 relocates) (14 adds) | $4,000 |
| Apr 8, 2011 | Never finaled issued Apr 2011, no final | 988 Howard St | Real Signs And Lighting | erect electrical single faced signDetails
erect electrical single faced sign | $2,300 |
| Apr 6, 2011 | Never finaled issued Apr 2011, no final | 988 Howard St | Real Signs And Lighting | to erect double faced non-illuminated projecting sign.Details
to erect double faced non-illuminated projecting sign. | $500 |
| Feb 23, 2011 | Completed final sign-off Jun 2022 | 193 06th St | Tony Ng Plumbing Co | drop existing sprinkler heads on new ceiling total 20 heads at ground floor subway restaurantDetails
drop existing sprinkler heads on new ceiling total 20 heads at ground floor subway restaurant | $4,000 |
| Feb 8, 2011 | Never finaled issued Feb 2011, no final | 185 06th St | street space permitDetails
street space permit | ||
| May 27, 2010 | Never finaled issued Sep 2010, no final | 193 06th St | Alves Bayarea Construction, Lucrum Builders | tenant improvement. add new non structural walls. 20 electrical & plumbing per plans. install type ii hood. install lighting. equipment, fixtures & finishes necessary to produce subway sandwich store.Details
tenant improvement. add new non structural walls. 20 electrical & plumbing per plans. install type ii hood. install lighting. equipment, fixtures & finishes necessary to produce subway sandwich store. | $75,000 |
| Apr 15, 2010 | Completed final sign-off Jun 2010 | 988 Howard St | Plant Construction Company Lp | remove and replace exterior wood veneer panels as part of manufacturer warranty work. replacement in-kind & color pattern on panels to remain the same.Details
remove and replace exterior wood veneer panels as part of manufacturer warranty work. replacement in-kind & color pattern on panels to remain the same. | $80,000 |
| Dec 3, 2009 | Completed final sign-off Sep 2011 | 185 06th St | Anton Kalafati | tenant improvement of 1st floor & basement fo the plaza apts for a 99-sear black-box theater with support spaces consisting of: 1st floor- lobby, office, basement-lobby, restrooms, green room, black box performance space, tech, booth, dressing room & storage. note: see fire comments below.Details
tenant improvement of 1st floor & basement fo the plaza apts for a 99-sear black-box theater with support spaces consisting of: 1st floor- lobby, office, basement-lobby, restrooms, green room, black box performance space, tech, booth, dressing room & storage. note: see fire comments below. | $347,500 |
| Apr 8, 2009 | Completed final sign-off Jun 2009 | 988 Howard St | Cccs, Inc | renew pa# 2007/09/12/2502 to complete work & obtain final inspection.Details
renew pa# 2007/09/12/2502 to complete work & obtain final inspection. | $2,200 |
| Mar 3, 2009 | Never finaled issued Mar 2009, no final | 988 Howard St | street space only.Details
street space only. | ||
| Feb 20, 2009 | Completed final sign-off Mar 2009 | 988 Howard St | Siemens Industry, Inc. | at 1st fl: add 1 pull, 2 strobes, 1 horn strobe to tenant space.Details
at 1st fl: add 1 pull, 2 strobes, 1 horn strobe to tenant space. | $4,000 |
| Feb 6, 2009 | Completed final sign-off Mar 2009 | 988 Howard St | Alwest Fire Protection | add 1 fire sprinkler in restroom ceiling. t/i pa #200709122502.Details
add 1 fire sprinkler in restroom ceiling. t/i pa #200709122502. | $500 |
| Jan 29, 2009 | Never finaled issued Jan 2009, no final | 988 Howard St | street space only.Details
street space only. | ||
| Oct 31, 2008 | Completed final sign-off Jun 2009 | 988 Howard St | Cccs, Inc | revision to appl #200709122502 to relocate atm machine to be at the exteropr wall setback 3'-0" from the property line. also mechanical electrical & plumbing tenant improvements are included.Details
revision to appl #200709122502 to relocate atm machine to be at the exteropr wall setback 3'-0" from the property line. also mechanical electrical & plumbing tenant improvements are included. | $20,000 |
| Sep 12, 2007 | Never finaled issued Sep 2007, no final | 988 Howard St | t.i. of ground floor space, to create new bank, offices, storage. 1st time tenant. sprinkler & fire alarm under seperate permit. storefront envelope & mechanical hvac seperate permit.Details
t.i. of ground floor space, to create new bank, offices, storage. 1st time tenant. sprinkler & fire alarm under seperate permit. storefront envelope & mechanical hvac seperate permit. | $75,000 | |
| May 9, 2006 | Completed final sign-off Dec 2006 | 988 Howard St | Metropolitan Electrical Construction | the project consists install& operation antenna's & associated equipment cabinets for sprint spectrum's personal communication services wireless telecommunications network. total of 4 equipment cabinets & 3 antennas with the appropriate cables & conduit are proposed at this site.Details
the project consists install& operation antenna's & associated equipment cabinets for sprint spectrum's personal communication services wireless telecommunications network. total of 4 equipment cabinets & 3 antennas with the appropriate cables & conduit are proposed at this site. | $125,000 |
| Jan 24, 2006 | Never finaled issued Jan 2006, no final | 988 Howard St | streetspaceDetails
streetspace | ||
| Nov 17, 2005 | Never finaled issued Nov 2005, no final | 988 Howard St | streetspaceDetails
streetspace | ||
| Sep 14, 2005 | Never finaled issued Sep 2005, no final | 988 Howard St | streetspaceDetails
streetspace | ||
| Mar 17, 2005 | Never finaled issued Mar 2005, no final | 988 Howard St | street spaceDetails
street space | ||
| Mar 11, 2005 | Completed final sign-off Oct 2006 | 988 Howard St | revision to app #200305215221s1 for approved bsmnt mat foundation due to extg conditions changesDetails
revision to app #200305215221s1 for approved bsmnt mat foundation due to extg conditions changes | $65,000 | |
| Feb 15, 2005 | Completed final sign-off Oct 2006 | 988 Howard St | defered submittal for stair review. stair are design build. stair review was a plan check comment toDetails
defered submittal for stair review. stair are design build. stair review was a plan check comment to | $12,500 | |
| Nov 1, 2004 | Completed final sign-off Oct 2006 | 988 Howard St | Nibbi Brothers Construction | for buidinga 9 story concrete structure, erecting a tower crane "as built" to pa#2003/05/21/5221Details
for buidinga 9 story concrete structure, erecting a tower crane "as built" to pa#2003/05/21/5221 | $80,000 |
| Oct 5, 2004 | Completed final sign-off Oct 2006 | 988 Howard St | Edward W. Scott | install conduit, wiring, detection & notification devices, fire alarm panel & annunciator panelDetails
install conduit, wiring, detection & notification devices, fire alarm panel & annunciator panel | $60,000 |
| Sep 17, 2004 | Completed final sign-off Oct 2006 | 988 Howard St | Allied Fire Protection | watted dry stand pipes, new automatic sprinkler system for enire structure.Details
watted dry stand pipes, new automatic sprinkler system for enire structure. | $160,000 |
| Sep 2, 2004 | Never finaled issued Sep 2004, no final | 988 Howard St | street space permitDetails
street space permit | ||
| Aug 13, 2004 | Never finaled issued Aug 2004, no final | 988 Howard St | street spaceDetails
street space | ||
| Dec 4, 2003 | Completed final sign-off Nov 2004 | 988 Howard St | demolish a two story, 37 unit mixed use buildingDetails
demolish a two story, 37 unit mixed use building | ||
| May 21, 2003 | Completed final sign-off Oct 2006 | 988 Howard St | .Details
. | ||
| Mar 13, 2003 | Completed final sign-off Oct 2006 | 988 Howard St | Value Fire Protection Inc | install sprinkler system throughout comply w/sprinkler ordinance 170-02.Details
install sprinkler system throughout comply w/sprinkler ordinance 170-02. | $80,000 |
| Feb 3, 2003 | Completed final sign-off May 2006 | 988 Howard St | installation of hardwired smoke detectors, gate & interior fence alterationDetails
installation of hardwired smoke detectors, gate & interior fence alteration | $100,000 | |
| Aug 16, 2000 | Completed final sign-off Mar 2001 | 988 Howard St | one-stop, instll 5 wireless communication cabinets & 6 pcs antennas on the roof.Details
one-stop, instll 5 wireless communication cabinets & 6 pcs antennas on the roof. | $40,000 | |
| Jun 19, 2000 | Completed final sign-off Oct 2000 | 988 Howard St | Occidental Express | comply w/ n.o.v. 199928608 for installing of exhaust vent in top floor public bathroom trhough roofDetails
comply w/ n.o.v. 199928608 for installing of exhaust vent in top floor public bathroom trhough roof | $500 |