Block 0286, lot 007
312 Sutter St
- City’s use
- Commercial Office
- Built
- 1909
- Stories
- 6
- Units
- 2
- Rooms
- 7 bathrooms
- Building
- 46,538 sq ft
- Lot
- 6,612 sq ft
- Zoning
- C3R
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
34 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 7, 2023 | In progress issued Nov 2023 | 312 Sutter St | Rise Rigging Llc | ext facade masonry repairs. bldg rear & east elevation: remove outer wythe of damaged brick & repair in-kind. clean & treat steel w/zinc rich primer. bldg front on sutter st repair 2 damaged terra cotta pieces, apply sealant to (e) cracking in brick.Details
ext facade masonry repairs. bldg rear & east elevation: remove outer wythe of damaged brick & repair in-kind. clean & treat steel w/zinc rich primer. bldg front on sutter st repair 2 damaged terra cotta pieces, apply sealant to (e) cracking in brick. | $40,000 |
| Dec 9, 2020 | Completed final sign-off Mar 2023 | 312 Sutter St | Johnson Controls Security Solutions Llc | modify existing 6 story mixed use, fully sprinklered, sprinkler monitoring system replace with (new) system monitoring. add (m) smoke detector above (new) facp. ref ti permit: 2017 0919 8950.Details
modify existing 6 story mixed use, fully sprinklered, sprinkler monitoring system replace with (new) system monitoring. add (m) smoke detector above (new) facp. ref ti permit: 2017 0919 8950. | $1,500 |
| Sep 24, 2018 | Completed final sign-off Nov 2018 | 312 Sutter St | E B W Builders Inc | t.i. on level 4. scope of work includes: removal and construction of interior non-load bearing partitions, ceiling. electrical lighting and mechanical to be completed under a sep permit. no sturctural orplumbing work.Details
t.i. on level 4. scope of work includes: removal and construction of interior non-load bearing partitions, ceiling. electrical lighting and mechanical to be completed under a sep permit. no sturctural orplumbing work. | $71,250 |
| Sep 19, 2017 | Completed final sign-off Feb 2018 | 312 Sutter St | E B W Builders Inc | 2nd floor - removal & construction of interior non-rated non-load bearing partitions, ceiling & lighting modifications & finish patching. electrical & fire life safety under separate permit.Details
2nd floor - removal & construction of interior non-rated non-load bearing partitions, ceiling & lighting modifications & finish patching. electrical & fire life safety under separate permit. | $37,702 |
| Feb 19, 2016 | Completed final sign-off Jul 2016 | 312 Sutter St | E B W Builders Inc | 6th floor: partial remodel including under ceiling partition demolition, new finishes, and ada upgrades. electrical and mechanical deferred submittal.Details
6th floor: partial remodel including under ceiling partition demolition, new finishes, and ada upgrades. electrical and mechanical deferred submittal. | $82,720 |
| Apr 11, 2012 | Completed final sign-off Oct 2012 | 312 Sutter St | Cci Com'l Constr & Improv**See 985808*** | tenant improvement at suites #510 work includes construction of new non-load bearing partitions, interior finish upgrades, minor ceiling & lighting. electrical, plumbing retrofits & accessibility upgrades. mech, elec & plumbing udner separate permits.Details
tenant improvement at suites #510 work includes construction of new non-load bearing partitions, interior finish upgrades, minor ceiling & lighting. electrical, plumbing retrofits & accessibility upgrades. mech, elec & plumbing udner separate permits. | $28,000 |
| Apr 10, 2012 | Completed final sign-off Jun 2012 | 312 Sutter St | Peacock Construction Inc | install new ada compliant sink and base cainbets. provide new dedicated outlet and gfi outlet at breakroomDetails
install new ada compliant sink and base cainbets. provide new dedicated outlet and gfi outlet at breakroom | $19,500 |
| Mar 27, 2012 | Completed final sign-off Oct 2012 | 312 Sutter St | Cci Com'l Constr & Improv**See 985808*** | tenant improvement at suites #401. work includes demo (e) non-load bearing partitoins & construction of new non-load bearing partitions, interior finish upgrades, ceiling & lighting retrofit. mech, elec, lighting, plumbing under sep permitDetails
tenant improvement at suites #401. work includes demo (e) non-load bearing partitoins & construction of new non-load bearing partitions, interior finish upgrades, ceiling & lighting retrofit. mech, elec, lighting, plumbing under sep permit | $45,000 |
| Mar 26, 2012 | Completed final sign-off Aug 2012 | 314 Sutter St | Terra Nova Industries | cosmetic remodel - interior renovation of (e) restaurant space involve installation of new finishes, millwork, bar equipment, stair railing & guardrail @ 2nd floor. no work will be done to ext.kitchen, storage, banquette rooms. mep under separate permit.Details
cosmetic remodel - interior renovation of (e) restaurant space involve installation of new finishes, millwork, bar equipment, stair railing & guardrail @ 2nd floor. no work will be done to ext.kitchen, storage, banquette rooms. mep under separate permit. | $130,000 |
| Mar 14, 2012 | Completed final sign-off Jul 2012 | 314 Sutter St | Terra Nova Industries, Zebra Awning Co Inc | fabricate & install (3) triangle style steele frame fabric cover. install on (3) mezzanine windows. graphics on center awning.Details
fabricate & install (3) triangle style steele frame fabric cover. install on (3) mezzanine windows. graphics on center awning. | $6,000 |
| Mar 14, 2012 | Completed final sign-off Jul 2012 | 314 Sutter St | Terra Nova Industries, Zebra Awning Co Inc | erect (2) wall projecting, non electric ,double faced sign.Details
erect (2) wall projecting, non electric ,double faced sign. | $6,000 |
| Mar 14, 2012 | Completed final sign-off Aug 2012 | 314 Sutter St | Terra Nova Industries | new paint 1st + mezzanie level. new door hardware including pust button ada access. (2) new lite nenu boards. (e) light location. new fixtures cladding of entry door and window system with trespa wood. ext. store front to remain ext shutters. (n) wood applied.Details
new paint 1st + mezzanie level. new door hardware including pust button ada access. (2) new lite nenu boards. (e) light location. new fixtures cladding of entry door and window system with trespa wood. ext. store front to remain ext shutters. (n) wood applied. | $30,000 |
| Mar 22, 2011 | Completed final sign-off May 2011 | 312 Sutter St | Bullard's Heating & Air Inc. | provide and install one 24,000 btu heat pump and related ductwork. modify extg ductwork to accomodate new floor plan. install 2 rr exhaust fans and related duct work.Details
provide and install one 24,000 btu heat pump and related ductwork. modify extg ductwork to accomodate new floor plan. install 2 rr exhaust fans and related duct work. | $15,500 |
| Mar 4, 2011 | Completed final sign-off May 2011 | 312 Sutter St | Incom Mechanical Inc | 3rd floor - modify extg fire sprinkler system to accomodate new tenant space layout.Details
3rd floor - modify extg fire sprinkler system to accomodate new tenant space layout. | $2,700 |
| Feb 8, 2011 | Completed final sign-off May 2011 | 312 Sutter St | Cci Com'l Constr & Improv**See 985808*** | ti to join 2 e suites on 3rd fl. soft demo non load bearing partitions, new non load bearing partitionDetails
ti to join 2 e suites on 3rd fl. soft demo non load bearing partitions, new non load bearing partition | $101,400 |
| Jun 30, 2010 | Completed final sign-off Aug 2010 | 312 Sutter St | Comfort Dynamics Inc. | remove and replace duct and heating/cooling units (3) ref. arch 201004029512.Details
remove and replace duct and heating/cooling units (3) ref. arch 201004029512. | $31,000 |
| Apr 20, 2010 | Completed final sign-off Aug 2010 | 312 Sutter St | R L H Fire Protection Inc | 5th floor-t.i. on an (e) fire sprinkler system for the book club of california. relocate 26 heads, add 2 heads & remove 10 headsDetails
5th floor-t.i. on an (e) fire sprinkler system for the book club of california. relocate 26 heads, add 2 heads & remove 10 heads | $5,600 |
| Apr 2, 2010 | Completed final sign-off Aug 2010 | 312 Sutter St | Field Construction Inc. | 5th floor - demolition of non-structural interior partitions, construction of new private offices and reading and library rooms including new suspended ceiling, cabinets and finishes. mechanical, sprinklers, electrical and life safety are design build under separate permit.Details
5th floor - demolition of non-structural interior partitions, construction of new private offices and reading and library rooms including new suspended ceiling, cabinets and finishes. mechanical, sprinklers, electrical and life safety are design build under separate permit. | $250,000 |
| Feb 4, 2010 | Completed final sign-off Jul 2010 | 312 Sutter St | upgrade elevator car components & 5th floor restrooms to provide osmpliance wirh bldg code accessibility requirements.Details
upgrade elevator car components & 5th floor restrooms to provide osmpliance wirh bldg code accessibility requirements. | $75,000 | |
| Jun 17, 2009 | Never finaled issued Jun 2009, no final | 314 Sutter St | Aaa Restaurant Fire Control/Dba Aaa Fire | rework & repair the (e) ul300 fure system on the ground floorDetails
rework & repair the (e) ul300 fure system on the ground floor | $3,000 |
| Jun 5, 2009 | Completed final sign-off Jun 2009 | 314 Sutter St | Modern Mechanical Corporation | replace horizontal sections of grease duct (type i duct), that where damaged by a duct fire. reinstall duct fire wrap. replace fan umt on roof- in kind.Details
replace horizontal sections of grease duct (type i duct), that where damaged by a duct fire. reinstall duct fire wrap. replace fan umt on roof- in kind. | $50,000 |
| Feb 12, 2007 | Never finaled issued Feb 2007, no final | 314 Sutter St | to erect electrical signDetails
to erect electrical sign | ||
| Feb 6, 2007 | Expired or cancelled cancelled Jan 2026 | 314 Sutter St | painted electric indirect replacement sign.Details
painted electric indirect replacement sign. | ||
| Jun 15, 2006 | Never finaled issued Jun 2006, no final | 314 Sutter St | street space permitDetails
street space permit | ||
| Jun 7, 2006 | Expired or cancelled expired Apr 2011 | 312 Sutter St | D C Taylor Co | reroofingDetails
reroofing | $86,000 |
| May 3, 2006 | Completed final sign-off Sep 2007 | 312 Sutter St | Skyline Construction | remove & reinstall new roofing to existing cooling tower, install new circuit cooling tower, boiler & relocate existing pumps. remove existing cooling tower after new cooling tower is installed, provide electrical power to new cooling tower.Details
remove & reinstall new roofing to existing cooling tower, install new circuit cooling tower, boiler & relocate existing pumps. remove existing cooling tower after new cooling tower is installed, provide electrical power to new cooling tower. | $85,000 |
| Apr 7, 2005 | Completed final sign-off May 2005 | 312 Sutter St | Plant Construction Company Lp | remove (e) abandoned fire escape at rear of building to eliminate pigeon roosting & droppings probleDetails
remove (e) abandoned fire escape at rear of building to eliminate pigeon roosting & droppings proble | $3,500 |
| Dec 1, 2004 | Completed final sign-off May 2005 | 312 Sutter St | R L H Fire Protection Inc | install new dry standpipe & fire hose values to (e) structure insie one stairwayDetails
install new dry standpipe & fire hose values to (e) structure insie one stairway | $9,600 |
| Nov 2, 2004 | Completed final sign-off Feb 2005 | 314 Sutter St | Cisco Fire Sprinklers, Inc. | re-locate existing fire sprinkler drops to new ceiling layout & elevation in basement.Details
re-locate existing fire sprinkler drops to new ceiling layout & elevation in basement. | $8,000 |
| Oct 19, 2004 | Completed final sign-off Feb 2005 | 314 Sutter St | Terra Nova Industries | interior remodel of (e)storage room in basement of an (e) restaurant/bar.construction includesDetails
interior remodel of (e)storage room in basement of an (e) restaurant/bar.construction includes | $35,000 |
| Sep 19, 2000 | Completed final sign-off Nov 2000 | 312 Sutter St | oti-3 sp 3rd floorDetails
oti-3 sp 3rd floor | $1,500 | |
| Aug 10, 2000 | Completed final sign-off Nov 2000 | 312 Sutter St | oti-2 3rd floor lighting/mechanicalDetails
oti-2 3rd floor lighting/mechanical | $10,000 | |
| Aug 4, 2000 | Completed final sign-off Nov 2000 | 312 Sutter St | oti-1 3rd floor el, me, spDetails
oti-1 3rd floor el, me, sp | $50,000 | |
| Jul 26, 2000 | Completed final sign-off Oct 2000 | 312 Sutter St | Bcci Construction Company | renew expired appl #9913621, 9912665, 9915034Details
renew expired appl #9913621, 9912665, 9915034 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Terra Nova Industries (5), Cci Com'l Constr & Improv**See 985808*** (3), E B W Builders Inc (3), R L H Fire Protection Inc (2), Zebra Awning Co Inc (2), Aaa Restaurant Fire Control/Dba Aaa Fire, Bcci Construction Company, Bullard's Heating & Air Inc., Cisco Fire Sprinklers, Inc., Comfort Dynamics Inc., D C Taylor Co, Field Construction Inc., Incom Mechanical Inc, Johnson Controls Security Solutions Llc, Modern Mechanical Corporation, Peacock Construction Inc, Plant Construction Company Lp, Rise Rigging Llc, Skyline Construction
- Architects
- Adam Wing (3), Douglas Tom (3), Adam Winig, Frederic Cote, James Stefanski, John Hood
- Engineers
- Jeffrey Weber
- Authorized agent-otherss
- Michael O'connor