Michael Murphy
- Listed as
- architect, engineer
- Firm
- Ware Malcomb
- On San Francisco permits
- Sep 2015 to Jun 2025
14 permits since 2000 (engineer on 11 permits, architect on 3 permits): 4 completed, 10 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 9, 2025 | In progress issued Jul 2025 | 73 Erie St | Bcci Construction Company | the scope of work includes a proposed type v, 1 story pre-fabricated trailer by others- plan approval #mac-cm 10067 along with associated flatwork. flatwork improvements including grading of onsite concrete and asphalt areas surrounding the building & the accessible paths of travel fromDetails
the scope of work includes a proposed type v, 1 story pre-fabricated trailer by others- plan approval #mac-cm 10067 along with associated flatwork. flatwork improvements including grading of onsite concrete and asphalt areas surrounding the building & the accessible paths of travel from | $70,000 |
| May 5, 2025 | In progress issued Jun 2025 | 140 14th St | Bcci Construction Company | revision to permit 202210194657 and 202501299326. temporary light relocation to permanent location. update of electrical equipment locations and electrical yard. re-striping of stalls and drive aisles to provide new u-turn lane, fencing, gate updates. add lota devices.Details
revision to permit 202210194657 and 202501299326. temporary light relocation to permanent location. update of electrical equipment locations and electrical yard. re-striping of stalls and drive aisles to provide new u-turn lane, fencing, gate updates. add lota devices. | |
| May 5, 2025 | In progress issued Jun 2025 | 73 Erie St | Bcci Construction Company | revision to 202210194663 & 202501299316. updated utility connection, relocation of (e) temporary lights/ install permanent lights, update of electrical equipment locations, add lota devicesDetails
revision to 202210194663 & 202501299316. updated utility connection, relocation of (e) temporary lights/ install permanent lights, update of electrical equipment locations, add lota devices | |
| Jan 29, 2025 | In progress issued Mar 2025 | 55 Erie St | Bcci Construction Company, Richlen Construction | revision to 202210194666 included: replace 2 abb 184 chargers w/ 2 abba 400 chargers, added utility trench detail. update erosion control notes, added fence & gate detailDetails
revision to 202210194666 included: replace 2 abb 184 chargers w/ 2 abba 400 chargers, added utility trench detail. update erosion control notes, added fence & gate detail | |
| Jan 29, 2025 | In progress issued Mar 2025 | 73 Erie St | Bcci Construction Company, Richlen Construction | revision to permit# 202210194663: added utility trench detail, updated erovsion control notes, added fence and gate detail.Details
revision to permit# 202210194663: added utility trench detail, updated erovsion control notes, added fence and gate detail. | |
| Jan 29, 2025 | In progress issued Mar 2025 | 140 14th St | Bcci Construction Company | revision to pa # 2022-1019-4657 replace 4 abb 184 chargers with 4 abb a400 chargers; added utility trench detail; updated erosion control notes; added fence & gate detail. no work in public right of wayDetails
revision to pa # 2022-1019-4657 replace 4 abb 184 chargers with 4 abb a400 chargers; added utility trench detail; updated erosion control notes; added fence & gate detail. no work in public right of way | |
| Oct 19, 2022 | In progress issued Nov 2023 | 150 14th St | Richlen Construction | lot 3: install (6) ev chargers for 12 vehicles, convert from vehicle storage lot to fleet charging use.Details
lot 3: install (6) ev chargers for 12 vehicles, convert from vehicle storage lot to fleet charging use. | $500,000 |
| Oct 19, 2022 | In progress issued Nov 2023 | 55 Erie St | Richlen Construction | install 8 ev charges for 16 vehicles convert from vehicle storage lot to fleet charging use.Details
install 8 ev charges for 16 vehicles convert from vehicle storage lot to fleet charging use. | $500,000 |
| Oct 19, 2022 | In progress issued Nov 2023 | 73 Erie St | Richlen Construction | install 13 ev charges for 26 vehicles convert from vehicle storage lot to fleet charging use.Details
install 13 ev charges for 26 vehicles convert from vehicle storage lot to fleet charging use. | $500,000 |
| Oct 19, 2022 | In progress issued Nov 2023 | 150 14th St | Richlen Construction | lot 5: install (5) ev chargersfor 10 vehicles for spob 71-80, convert from vehicle storage lot to fleet charging use.Details
lot 5: install (5) ev chargersfor 10 vehicles for spob 71-80, convert from vehicle storage lot to fleet charging use. | $500,000 |
| Mar 24, 2022 | Completed final sign-off Jun 2022 | 1900 Noriega St | installation of 4 new ev charging station. striping and signage for charging stalls. not open to general public only to the patron of the bank/officers. for accessory use for the bank clientsDetails
installation of 4 new ev charging station. striping and signage for charging stalls. not open to general public only to the patron of the bank/officers. for accessory use for the bank clients | $240,000 | |
| Mar 23, 2021 | Completed final sign-off Sep 2021 | 640 Townsend St | Phoenix Construction And Management | use of power door operators in lieu of level landing at doors.Details
use of power door operators in lieu of level landing at doors. | $10,000 |
| Oct 23, 2015 | Completed final sign-off Feb 2016 | 2598 Taylor St | Reeve-Knight Construction Inc. | revision to pa#201509298348 structural revision. n/a ordinance #155-13Details
revision to pa#201509298348 structural revision. n/a ordinance #155-13 | $15,000 |
| Sep 29, 2015 | Completed final sign-off Feb 2016 | 2598 Taylor St | Reeve-Knight Construction Inc. | replace 250 sq ft +/- of exterior concrete steps with a concrete ramp, maher not requiredDetails
replace 250 sq ft +/- of exterior concrete steps with a concrete ramp, maher not required | $50,000 |