Block 1924, lot 004
1601 19th Ave
- City’s use
- Commercial Misc
- Built
- 2002
- Stories
- 4
- Units
- 120
- Rooms
- 129 bathrooms
- Building
- 90,539 sq ft
- Lot
- 99,370 sq ft
- Zoning
- RH2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 2, 2024 | Completed final sign-off Sep 2024 | 1601 19th Av | Aura Fire Safety | sleeping area compliance/pillow test complete.Details
sleeping area compliance/pillow test complete. | |
| Jul 27, 2023 | Never finaled filed Jul 2023, never issued | 1601 19th Av | S R Bray Llc/Dba: Power Plus | install new 125kw diesel generator. replace existing 600a automatic transfer switch. as an optional standyby system.Details
install new 125kw diesel generator. replace existing 600a automatic transfer switch. as an optional standyby system. | $117,000 |
| Jul 28, 2021 | Completed final sign-off Feb 2022 | 1601 19th Av | Matrix Hg Inc | replace 2 castiron hot water boilers with 2 new castiron boilers. reconfigure piping to accommodate new boilers. install new 80 gallon vertical buffer tank and pipe to the new boiler.Details
replace 2 castiron hot water boilers with 2 new castiron boilers. reconfigure piping to accommodate new boilers. install new 80 gallon vertical buffer tank and pipe to the new boiler. | $126,019 |
| Nov 23, 2011 | Never finaled issued Nov 2011, no final | 1601 19th Av | Gateway Roofing And Water Proofing Inc | reroofingDetails
reroofing | $13,500 |
| Oct 25, 2005 | Completed final sign-off Jan 2006 | 1601 19th Av | Hankins Construction | tenant improvement for alzheimer unit & beauty salon. smoke detectors for alzheimer unit. control modules for doors with delayeo egress.Details
tenant improvement for alzheimer unit & beauty salon. smoke detectors for alzheimer unit. control modules for doors with delayeo egress. | $24,000 |
| Aug 1, 2005 | Completed final sign-off May 2006 | 1601 19th Av | Hankins Construction | demo of existing residential units remodel wrk resulting in a new activity area new landscape gardenDetails
demo of existing residential units remodel wrk resulting in a new activity area new landscape garden | $75,000 |
| Nov 27, 2001 | Completed final sign-off Mar 2002 | 1730 20th Av | revision to 9913022s:reflect field conditions, dwring construxction ofl model homes ducting plumbingDetails
revision to 9913022s:reflect field conditions, dwring construxction ofl model homes ducting plumbing | ||
| Nov 9, 2001 | Completed final sign-off Mar 2002 | 1730 20th Av | submitted of roof truss detailsDetails
submitted of roof truss details |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hankins Construction (2), Aura Fire Safety, Gateway Roofing And Water Proofing Inc, Matrix Hg Inc, S R Bray Llc/Dba: Power Plus
- Engineers
- Alan Wright, Hassan Assaf
- Authorized agent-otherss
- Justin Weed
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.