John Gish
- Listed as
- architect, authorized agent-others
- Firm
- Callson Architects, P.C.
- Based in
- Seattle
- On San Francisco permits
- Aug 2002 to Jan 2012
13 permits since 2000 (architect on 12 permits, authorized agent-others on 1 permit): 9 completed, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 4, 2012 | Completed final sign-off Oct 2012 | 299 Valencia St | Jps Builders | tenant improvement of exg leased space for a branch bank of 3205 sq ft.work includes non structural partitions, ceilings, overhead grille, tellerline, interior atms, restrooms, lounge, hvac, plumbing and electrical.Details
tenant improvement of exg leased space for a branch bank of 3205 sq ft.work includes non structural partitions, ceilings, overhead grille, tellerline, interior atms, restrooms, lounge, hvac, plumbing and electrical. | $220,000 |
| Aug 10, 2011 | Completed final sign-off Dec 2011 | 101 Montgomery St | Gidel & Kocal Construction Co Inc | revision to pa# 2010.11.22.5422. addition of 663 sqft of office space on 2nd fl to create a 6,555 gross sqft branck bank (chase), and revision to non struc partitions, int. doors, int.windows, exterior finishes on entrance from stucco to marble, clgs, sqft, interior finishes,hvac,plbg,electrical.Details
revision to pa# 2010.11.22.5422. addition of 663 sqft of office space on 2nd fl to create a 6,555 gross sqft branck bank (chase), and revision to non struc partitions, int. doors, int.windows, exterior finishes on entrance from stucco to marble, clgs, sqft, interior finishes,hvac,plbg,electrical. | $70,000 |
| Aug 8, 2011 | Completed final sign-off Nov 2011 | 3981 Alemany Bl | Deb Construction Llc | change of occupancy from retail to bank (chase)new interior atm, non struc partitions, clgs, soffits, finishes, furniture and related hvac, elec and plbg. work at ground floorDetails
change of occupancy from retail to bank (chase)new interior atm, non struc partitions, clgs, soffits, finishes, furniture and related hvac, elec and plbg. work at ground floor | $625,000 |
| Aug 10, 2010 | Completed final sign-off Nov 2010 | 595 Market St | Gidel & Kocal Construction Co Inc | revision to pa# 2010-0510-2073-value engineering glazing system changed to aluminum frame curtain wall system. revise mechanical system, electrical circuiting & plumbing to correspond to bldg req. data rm encloser added per landlord req. addition of bullet resistan glass at teller lineDetails
revision to pa# 2010-0510-2073-value engineering glazing system changed to aluminum frame curtain wall system. revise mechanical system, electrical circuiting & plumbing to correspond to bldg req. data rm encloser added per landlord req. addition of bullet resistan glass at teller line | |
| Feb 10, 2010 | Expired or cancelled expired Feb 2014 | 1040 Grant Av | Dbsi Inc Dba Design Build Solutions & In | 1st-floor-remove (e) shaft behind teller to create workable space for ada counter 2nd floor-install motorized interior blindsDetails
1st-floor-remove (e) shaft behind teller to create workable space for ada counter 2nd floor-install motorized interior blinds | $58,500 |
| May 20, 2009 | Completed final sign-off Dec 2009 | 100 Pine St | Gidel & Kocal Construction Co Inc | t.i. for commercial bank at ground floor: demolition of existing non-structural walls, finishes, and install of new finishes, non-structural wals, and millwork, minor electrical and mechanical.Details
t.i. for commercial bank at ground floor: demolition of existing non-structural walls, finishes, and install of new finishes, non-structural wals, and millwork, minor electrical and mechanical. | $96,415 |
| May 18, 2009 | Completed final sign-off Sep 2010 | 401 California St | Dbsi Inc Dba Design Build Solutions & In | demolition of existing finishes, non structural partitions and millwork. rework includes new interior storefront at foyer, new finishes, minor electrical and mechanicalDetails
demolition of existing finishes, non structural partitions and millwork. rework includes new interior storefront at foyer, new finishes, minor electrical and mechanical | $100,000 |
| May 18, 2009 | Completed final sign-off Feb 2010 | 3998 24th St | demolition of existing finishes, non structural partitions, ceiling. rework includes new finishes, new walls, fixtures. some electric and mechanical workDetails
demolition of existing finishes, non structural partitions, ceiling. rework includes new finishes, new walls, fixtures. some electric and mechanical work | $116,312 | |
| May 4, 2009 | Never finaled issued Sep 2009, no final | 2900 Mission St | Turner Construction Co | rework main entry including new perimeter footing at area of work and correction of current foyer slope at atms. interior work includes demo of non structural partitions, ceiling, flooring. new ceiling,walls,flooring, elec,mechDetails
rework main entry including new perimeter footing at area of work and correction of current foyer slope at atms. interior work includes demo of non structural partitions, ceiling, flooring. new ceiling,walls,flooring, elec,mech | $156,323 |
| Apr 21, 2009 | Completed final sign-off Apr 2010 | 2300 16th St | Turner Construction Co | ti consisting of demolition of existing floor finishes, ceiling soffits, non structural partitons. patch back of ceiling, new flooring, and reconfigure wall layout for new tellerline and conference room. some electrical and mechanical workDetails
ti consisting of demolition of existing floor finishes, ceiling soffits, non structural partitons. patch back of ceiling, new flooring, and reconfigure wall layout for new tellerline and conference room. some electrical and mechanical work | $238,000 |
| Apr 14, 2009 | Completed final sign-off Nov 2009 | 360 Bay St | Turner Construction Co | demo of existing soffit and non-structural partitions, patch back ceiling, patch back flooring, new non-structural partitions, and minor electric and hvac.Details
demo of existing soffit and non-structural partitions, patch back ceiling, patch back flooring, new non-structural partitions, and minor electric and hvac. | $195,513 |
| Apr 4, 2008 | Expired or cancelled expired Mar 2010 | 2454 Noriega St | Lem Construction Inc., Eric F Anderson Incorporated | tenant improvement consisting of build out of a leased space in an existing one story bldg. work includes exterior finishes, non-structural partitions, ceilings, finishes, mechanical, electrical, plbg & structural.Details
tenant improvement consisting of build out of a leased space in an existing one story bldg. work includes exterior finishes, non-structural partitions, ceilings, finishes, mechanical, electrical, plbg & structural. | $115,000 |
| Aug 2, 2002 | Expired or cancelled expired Nov 2003 | 301 Clement St | ti-new ada ramp,accessubke restroom,non structural partitions, new furniture&finishes throughout.Details
ti-new ada ramp,accessubke restroom,non structural partitions, new furniture&finishes throughout. | $150,000 |