Block 3510, lot 059
120 10th St
- City’s use
- Commercial Hotel
- Built
- 1907
- Stories
- 3
- Units
- 12
- Rooms
- 5 bathrooms
- Building
- 6,708 sq ft
- Lot
- 3,746 sq ft
- Zoning
- CM
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
17 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 2, 2024 | In progress filed Aug 2024, not yet issued | 120 10th St | Aura Fire Safety | as built revision for permit # 202407237086. installing 2 heat detectors instead of smoke detectors due to proximity to kitchen space.Details
as built revision for permit # 202407237086. installing 2 heat detectors instead of smoke detectors due to proximity to kitchen space. | |
| Jul 23, 2024 | In progress issued Jul 2024 | 120 10th St | Aura Fire Safety | upgrade fire alarm system to comply with 1103.7.6.1 and add necessary devices to bring system up to sffc 2022 requirements. to comply with 202422540 (nov)Details
upgrade fire alarm system to comply with 1103.7.6.1 and add necessary devices to bring system up to sffc 2022 requirements. to comply with 202422540 (nov) | $29,460 |
| Jun 12, 2018 | Never finaled filed Jun 2018, never issued | 122 10th St | no physical work proposed as part of permit. change of use from medical cannabis dispensary to cannabis retail per planning code section 190. all work was completed under permit app #2015-0723-2261.Details
no physical work proposed as part of permit. change of use from medical cannabis dispensary to cannabis retail per planning code section 190. all work was completed under permit app #2015-0723-2261. | ||
| Sep 23, 2015 | Never finaled issued Sep 2015, no final | 120 10th St | street space permitDetails
street space permit | ||
| Jul 29, 2015 | Never finaled issued Jul 2015, no final | 120 10th St | street space & mta permitDetails
street space & mta permit | ||
| Jul 23, 2015 | Expired or cancelled expired Mar 2025 | 122 10th St | remodel of extg medical annbis dispensary. extg ada restroom to remain. new display area, new office new finishes. n/a for maher. no change to egress, occupancy or occupant load.Details
remodel of extg medical annbis dispensary. extg ada restroom to remain. new display area, new office new finishes. n/a for maher. no change to egress, occupancy or occupant load. | $60,000 | |
| Jun 10, 2015 | Completed final sign-off Mar 2016 | 120 10th St | S F Garage Company Inc. | soft story retrofit: structural upgrade. install shear walls & (1) moment frame, per chapter 34b, 2012 iebc appendix a-4 (for residential only). n/a maher ordinanceDetails
soft story retrofit: structural upgrade. install shear walls & (1) moment frame, per chapter 34b, 2012 iebc appendix a-4 (for residential only). n/a maher ordinance | $40,000 |
| Jun 10, 2015 | Completed final sign-off Mar 2016 | 122 10th St | S F Garage Company Inc. | soft story retrofit: structural upgrade. install shear walls & (1) moment frame, per chapter 34b, 2012 iebc appendix a-4 (for commercial only). n/a maher ordinanceDetails
soft story retrofit: structural upgrade. install shear walls & (1) moment frame, per chapter 34b, 2012 iebc appendix a-4 (for commercial only). n/a maher ordinance | $10,000 |
| May 29, 2015 | Never finaled issued May 2015, no final | 120 10th St | streetspaceDetails
streetspace | ||
| Apr 20, 2015 | Never finaled issued Apr 2015, no final | 120 10th St | street space and mtaDetails
street space and mta | ||
| Mar 5, 2015 | Completed final sign-off May 2016 | 120 10th St | Comm'l Factors Inc. Dba Newpane.Com | replace all windows in kind with wood material windows.Details
replace all windows in kind with wood material windows. | $29,741 |
| Jan 8, 2015 | Completed final sign-off Mar 2016 | 120 10th St | S F Garage Company Inc. | remodel kitchen & bathroom in kind to find leaks & dry rot for all units, replace all lath & plaster with 5/8 type gyp board on 2nd & 3rd flrs; maher n/aDetails
remodel kitchen & bathroom in kind to find leaks & dry rot for all units, replace all lath & plaster with 5/8 type gyp board on 2nd & 3rd flrs; maher n/a | $70,000 |
| Nov 4, 2013 | Never finaled issued Jan 2014, no final | 120 10th St | revision to 201304225111. relocate soldier bears onto 1415 mission. tiebacks with internal bracingDetails
revision to 201304225111. relocate soldier bears onto 1415 mission. tiebacks with internal bracing | ||
| Apr 22, 2013 | Never finaled issued Aug 2013, no final | 120 10th St | Build Group Inc. | underpinning & tie backss as a result of adjacent new construction at 1415 mission st project. (ref pa#200810315586s)Details
underpinning & tie backss as a result of adjacent new construction at 1415 mission st project. (ref pa#200810315586s) | $110,000 |
| Sep 28, 2011 | Completed final sign-off Dec 2011 | 120 10th St | Clear Channel Outdoor | the owner of general advertising sign located at 120-122 10th st. clear channel outdoor inc will remove this sign voluntarily. sign no. 1578Details
the owner of general advertising sign located at 120-122 10th st. clear channel outdoor inc will remove this sign voluntarily. sign no. 1578 | $500 |
| May 18, 2007 | Completed final sign-off Aug 2009 | 122 10th St | widen entry doors and replace ramp at front entry. ada upgrades in existing restroom. legalize mediacl cannabis dispensory. no smoking to be done on site . remove mezzanine and stairs.Details
widen entry doors and replace ramp at front entry. ada upgrades in existing restroom. legalize mediacl cannabis dispensory. no smoking to be done on site . remove mezzanine and stairs. | $12,000 | |
| Dec 15, 2000 | Expired or cancelled expired Jun 2001 | 120 10th St | remodel restroom comply to ada remodel entrance comply to adaDetails
remodel restroom comply to ada remodel entrance comply to ada | $9,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- S F Garage Company Inc. (3), Aura Fire Safety (2), Build Group Inc., Clear Channel Outdoor, Comm'l Factors Inc. Dba Newpane.Com
- Architects
- Ian Birchall
- Engineers
- Harold Howell (2), Timothy Mathison (2), Vincent Kevin Kelly
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.