Block 0345, lot 012
138 Hyde St
- City’s use
- Multi-Family Residential
- Built
- 1915
- Stories
- 3
- Units
- 23
- Rooms
- 23 bathrooms
- Building
- 10,860 sq ft
- Lot
- 4,809 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 31, 2018 | Never finaled issued Nov 2018, no final | 138 Hyde St | Five Star General Contractors | #7: remodel kitchen, very small with new cabinets and sink, remodel bathroom very small bathroom.Details
#7: remodel kitchen, very small with new cabinets and sink, remodel bathroom very small bathroom. | $5,000 |
| Oct 23, 2017 | Completed final sign-off Mar 2018 | 138 Hyde St | Five Star General Contractors | to comply with nov #201304991 , unit #4; remove 3 old cabinets i kitchen , sink and faucet in kitchen, replace as new. new flooring, paint as needed laundry room remodel at basement.Details
to comply with nov #201304991 , unit #4; remove 3 old cabinets i kitchen , sink and faucet in kitchen, replace as new. new flooring, paint as needed laundry room remodel at basement. | $4,000 |
| Jun 20, 2017 | Never finaled issued Jun 2017, no final | 138 Hyde St | Five Star General Contractors | unit 14: make necessary repairs to tubs/showers, r/r sheetrock as needed, firetape & mude, paint 2 coats, repair damaged walls & ceilings using waterproof gymsum. fire tape, mud paint two coats, comply with nov #201782321. maher na.Details
unit 14: make necessary repairs to tubs/showers, r/r sheetrock as needed, firetape & mude, paint 2 coats, repair damaged walls & ceilings using waterproof gymsum. fire tape, mud paint two coats, comply with nov #201782321. maher na. | $1,200 |
| Aug 21, 2015 | Never finaled issued Aug 2015, no final | 138 Hyde St | Alpha Construction Co *Stop Issusing* | to comply with nov #201304991; to complete work and to obtain final inspection for work approved under pa#201306038539.Details
to comply with nov #201304991; to complete work and to obtain final inspection for work approved under pa#201306038539. | $2,500 |
| Feb 12, 2015 | Never finaled issued Feb 2015, no final | 138 Hyde St | **See Note** Alpha Design & Const Inc | remodeling kitchen and bathroom, new flooring, kitchen cabinets, painting, kitchen area about 3000 sf, (ne) light fixtures, plumbing fixtures in unit 3, lighting & control in kitchen per cec 150(k)Details
remodeling kitchen and bathroom, new flooring, kitchen cabinets, painting, kitchen area about 3000 sf, (ne) light fixtures, plumbing fixtures in unit 3, lighting & control in kitchen per cec 150(k) | $12,000 |
| Apr 24, 2014 | Completed final sign-off Aug 2014 | 138 Hyde St | Alpha Construction Co *Stop Issusing* | renovation of unist #15 & 23 to replace kitchen cabinets, sheet rock, light fixtures, plumbing fixtures, paint kitchen area 30 sq ft for each unitDetails
renovation of unist #15 & 23 to replace kitchen cabinets, sheet rock, light fixtures, plumbing fixtures, paint kitchen area 30 sq ft for each unit | $12,500 |
| Jun 3, 2013 | Expired or cancelled expired Apr 2015 | 138 Hyde St | Occidental Express | comply with nov#201304991-converting ground floor storage room to laundry roomDetails
comply with nov#201304991-converting ground floor storage room to laundry room | $5,000 |
| Jan 24, 2011 | Never finaled issued Jan 2011, no final | 138 Hyde St | Occidental Express | minor remodeling of 23 kitchens and bathrooms including replacing cabinets, counter tops,plmg,& electrical fixtures and retiling bathrooms. min 50% light wattage in kchn shall be from high efficancy light fixture.Details
minor remodeling of 23 kitchens and bathrooms including replacing cabinets, counter tops,plmg,& electrical fixtures and retiling bathrooms. min 50% light wattage in kchn shall be from high efficancy light fixture. | $230,000 |
| Nov 24, 2010 | Expired or cancelled cancelled Mar 2011 | 138 Hyde St | Occidental Express | remodeling kitchens including replacing cabinets, counter tops and fixtures in units #4,16,22 & 28; at least 50% high efficacy lighting (by wattage) no change to exhaust systemDetails
remodeling kitchens including replacing cabinets, counter tops and fixtures in units #4,16,22 & 28; at least 50% high efficacy lighting (by wattage) no change to exhaust system | $25,000 |
| Aug 24, 2006 | Never finaled issued Jan 2007, no final | 138 Hyde St | underpinning and shoringDetails
underpinning and shoring | $30,000 | |
| Mar 5, 2002 | Expired or cancelled expired Jul 2002 | 138 Hyde St | street spaceDetails
street space | ||
| Nov 16, 2001 | Expired or cancelled expired May 2002 | 138 Hyde St | Hai's Roofing Company | reroofingDetails
reroofing | $12,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.