Back to kitchen remodel contractors
Angotti & Reilly Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Jan 2026
- Last 24 months
- 5 permits filed
203 permits since 2000: 139 completed, 7 in progress, 34 never finaled, 23 expired or cancelled.
Of the 34 never-finaled permits, 4 are 3 to 5 years old, 9 are 5 to 10 years old, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 14 completed, 1 in progress, 3 never finaled, 2 expired or cancelled. Typically 4 days from filing to permit and 236 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2025 | In progress issued Mar 2025 | 1998 Broadway | interior alteration to a single existing condominium unit on the 12th fl. of a 15- story residential building. all work interior, non structural. no change in use or occupancy. no increase in floor area. no exterior alterations. remodel existing kitchen counter, cabinets and appliancesDetails
interior alteration to a single existing condominium unit on the 12th fl. of a 15- story residential building. all work interior, non structural. no change in use or occupancy. no increase in floor area. no exterior alterations. remodel existing kitchen counter, cabinets and appliances | $325,000 |
| Oct 13, 2021 | Completed final sign-off May 2022 | 5401 Geary Bl | repair dry rot floor in kitchen repair in kind. replace floor drain.Details
repair dry rot floor in kitchen repair in kind. replace floor drain. | $20,000 |
| Mar 9, 2021 | Completed final sign-off Oct 2024 | 15 Crescent Av | exterior- rebuild front entry stair, repair/restore (e) horizontal wood siding on entire structure. (n) addition & deck at rear. replace all wood windows. interior- renovate (e) kitchen & bath. repair (e) finishes & wood framing. (n) bath in (n) rear addition.Details
exterior- rebuild front entry stair, repair/restore (e) horizontal wood siding on entire structure. (n) addition & deck at rear. replace all wood windows. interior- renovate (e) kitchen & bath. repair (e) finishes & wood framing. (n) bath in (n) rear addition. | $217,351 |
| Aug 9, 2019 | Completed final sign-off Sep 2019 | 799 Bryant St | repair fire seperation between prep kitchen on ground fl. add 2nd fl office with 5/8 type x gyp bd to match existing.Details
repair fire seperation between prep kitchen on ground fl. add 2nd fl office with 5/8 type x gyp bd to match existing. | $30,000 |
| Jul 19, 2019 | Completed final sign-off Aug 2019 | 501 06th St | g/f restaurant;-repair fire separation ceiling between 2/f above pre kitchen area. replace t bar approx. 200 sf; no other work.Details
g/f restaurant;-repair fire separation ceiling between 2/f above pre kitchen area. replace t bar approx. 200 sf; no other work. | $11,000 |
| Jun 14, 2019 | Completed final sign-off Sep 2019 | 2757 Polk St | unit 3: remodel unit. new copper cold water supply, new electrical service, and new kitchen cabinets. install (1) new window in kitchen. repaint apartment and refinish floors. window faces south light well.Details
unit 3: remodel unit. new copper cold water supply, new electrical service, and new kitchen cabinets. install (1) new window in kitchen. repaint apartment and refinish floors. window faces south light well. | $88,000 |
| Oct 19, 2017 | Completed final sign-off Aug 2018 | 8 Octavia St | unit 307: first time ti, g/f -mnor wall framing, electrical, light and kitchenette. vacant space to be used at retail, no structural work. no change facade, no excavation, total square footage 650 sq. ft.Details
unit 307: first time ti, g/f -mnor wall framing, electrical, light and kitchenette. vacant space to be used at retail, no structural work. no change facade, no excavation, total square footage 650 sq. ft. | $30,000 |
| Oct 5, 2016 | Completed final sign-off Jan 2017 | 228 Grant Av | 4th floor: add 1 ada accessible restroom. remodel kitchen/breakroom and existing restroom.Details
4th floor: add 1 ada accessible restroom. remodel kitchen/breakroom and existing restroom. | $70,000 |
| Jul 13, 2016 | Completed final sign-off Jun 2017 | 498 Sanchez St | current restaurant, new owner, upgrade kitchen facilitiies, add hvac unit. install 2 handsinks and prepsink per health dept code. install new led, lighting new counter, and finishes. no external changes. see drawing sheet a0.01 for clear description of work.Details
current restaurant, new owner, upgrade kitchen facilitiies, add hvac unit. install 2 handsinks and prepsink per health dept code. install new led, lighting new counter, and finishes. no external changes. see drawing sheet a0.01 for clear description of work. | $100,000 |
| Oct 21, 2014 | Never finaled issued Oct 2014, no final | 46 Rausch St | interior remodel of (e) 2nd flr unit including new bathrm, kitchen remodle, rear bath remodel, replace window @ porch (3 total), remove rear stairs to 2nd flr & infill flr, remove int walls at rear, new closets @ (e) room, new laundry rm, new lighting, new gas furnace & water heater.Details
interior remodel of (e) 2nd flr unit including new bathrm, kitchen remodle, rear bath remodel, replace window @ porch (3 total), remove rear stairs to 2nd flr & infill flr, remove int walls at rear, new closets @ (e) room, new laundry rm, new lighting, new gas furnace & water heater. | $160,000 |
| Sep 12, 2014 | Completed final sign-off Dec 2015 | 1034 Kearny St | remodel of 2,012 sf first floor, including new enclosed + open offices, new restrooms + staff kitchenette, new skylights. electrical + mechanical systems under separate permit. permit includes change of use from vacant adult theater to non profit organization's office on ground floor.Details
remodel of 2,012 sf first floor, including new enclosed + open offices, new restrooms + staff kitchenette, new skylights. electrical + mechanical systems under separate permit. permit includes change of use from vacant adult theater to non profit organization's office on ground floor. | $105,000 |
| Oct 16, 2013 | Never finaled issued Oct 2013, no final | 821 Sansome St | interior improvements with new interior partitions, upgrade of stair & handrails. upgrade o fexisting kitchenette with new ada compliant counter & sink.Details
interior improvements with new interior partitions, upgrade of stair & handrails. upgrade o fexisting kitchenette with new ada compliant counter & sink. | $18,850 |
| Oct 20, 2010 | Completed final sign-off Sep 2011 | 74 New Montgomery St | ground fl-change of use from office to retail. t.i. work includes construction of private offices & storage rooms, updating m.e.p system & finishes. construction of communal sink & kitchenette. change of use from office to retailDetails
ground fl-change of use from office to retail. t.i. work includes construction of private offices & storage rooms, updating m.e.p system & finishes. construction of communal sink & kitchenette. change of use from office to retail | $185,000 |
| Mar 19, 2010 | Completed final sign-off Jun 2010 | 3303 Fillmore St | replace kitchen cabinets & appliances, replace bathroom tile (2 bathrooms), replace sink & toilet. replace 3 windows on 3rd floor, 1 visible from street, no structural work or egress changes. lighting shall comply with cec 150kDetails
replace kitchen cabinets & appliances, replace bathroom tile (2 bathrooms), replace sink & toilet. replace 3 windows on 3rd floor, 1 visible from street, no structural work or egress changes. lighting shall comply with cec 150k | $45,000 |
| Dec 22, 2008 | Completed final sign-off Oct 2009 | 50 Scott St | revision to 200610104538 r1: relief dampers added at window o. ceiling plan revised to reflect mechanical changes. kitchen 1 hr ceiling deleted. access panel relocated to revised fire smoke damper location. combustion airduct added @ rehersal room west wall. return air grill added @ rehersal rm westDetails
revision to 200610104538 r1: relief dampers added at window o. ceiling plan revised to reflect mechanical changes. kitchen 1 hr ceiling deleted. access panel relocated to revised fire smoke damper location. combustion airduct added @ rehersal room west wall. return air grill added @ rehersal rm west | $23,000 |
| Dec 22, 2008 | Completed final sign-off Oct 2009 | 50 Scott St | provide fire smoke dampers, access panels. light fixtures deleted, fire/smoke damaper access hatch added, hv supply grill shown. 1 hr ceiling and 1 hr access panels addes. 1 hr kitchen ceiling added, hv-1 cfm changed to 800. revise air supply, flue from uh-1 retouted, air volume @ registers revisedDetails
provide fire smoke dampers, access panels. light fixtures deleted, fire/smoke damaper access hatch added, hv supply grill shown. 1 hr ceiling and 1 hr access panels addes. 1 hr kitchen ceiling added, hv-1 cfm changed to 800. revise air supply, flue from uh-1 retouted, air volume @ registers revised | $25,000 |
| Feb 5, 2008 | Expired or cancelled expired Oct 2009 | 50 Scott St | revision to 200610104538 r1, modify duct work in 1st floor restroom and place heating unit on floor. modify duct work in kitchen and restroom on ground floor.Details
revision to 200610104538 r1, modify duct work in 1st floor restroom and place heating unit on floor. modify duct work in kitchen and restroom on ground floor. | |
| Apr 4, 2006 | Completed final sign-off Feb 2007 | 1835 Franklin St | renovate kitchen & (2) bathrooms. to comply with nov#200230589 item#3.Details
renovate kitchen & (2) bathrooms. to comply with nov#200230589 item#3. | $110,000 |
| Dec 21, 2005 | Expired or cancelled expired Sep 2008 | 1335 Guerrero St | remodel 2 existing kitchens with removal of 2 walls and upgrade of existing equipmentDetails
remodel 2 existing kitchens with removal of 2 walls and upgrade of existing equipment | $30,000 |
| Mar 14, 2005 | Never finaled issued Mar 2005, no final | 999 Green St | replace kitchen cabinets and appliances, remove nonbearing wall for pass through from kitchen to lr.Details
replace kitchen cabinets and appliances, remove nonbearing wall for pass through from kitchen to lr. | $55,000 |