Angotti & Reilly Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Jan 2026
- Last 24 months
- 5 permits filed
203 permits since 2000: 139 completed, 7 in progress, 34 never finaled, 23 expired or cancelled.
Of the 34 never-finaled permits, 4 are 3 to 5 years old, 9 are 5 to 10 years old, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 6 completed, 3 never finaled. Typically 3 days from filing to permit and 104 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 7, 2025 | Completed final sign-off Jun 2025 | 248 West Portal Av | repair dry rotted stair and deck at rear door way <50% in kind. ref code nov #202429702; add hand rails to both sides of each stair assembly., (n) 1-hr fire rated wall and foundation @ property line for stair protection.Details
repair dry rotted stair and deck at rear door way <50% in kind. ref code nov #202429702; add hand rails to both sides of each stair assembly., (n) 1-hr fire rated wall and foundation @ property line for stair protection. | $11,500 |
| Mar 9, 2021 | Completed final sign-off Oct 2024 | 15 Crescent Av | exterior- rebuild front entry stair, repair/restore (e) horizontal wood siding on entire structure. (n) addition & deck at rear. replace all wood windows. interior- renovate (e) kitchen & bath. repair (e) finishes & wood framing. (n) bath in (n) rear addition.Details
exterior- rebuild front entry stair, repair/restore (e) horizontal wood siding on entire structure. (n) addition & deck at rear. replace all wood windows. interior- renovate (e) kitchen & bath. repair (e) finishes & wood framing. (n) bath in (n) rear addition. | $217,351 |
| Aug 24, 2015 | Completed final sign-off Oct 2015 | 530 Bush St | (e) conneting stair between 7th and 8th floors to be enclosed with new shaft wall construction, (e) mechanical duct to be rerouted around stair, electrical lights over stair to be disconnectedDetails
(e) conneting stair between 7th and 8th floors to be enclosed with new shaft wall construction, (e) mechanical duct to be rerouted around stair, electrical lights over stair to be disconnected | $10,000 |
| Dec 9, 2014 | Completed final sign-off Mar 2015 | 134 Maiden Ln | new interior non structural partitions, new finishes, modification to existing stair, new lighting,no change to mechanical system. no change to exterior.Details
new interior non structural partitions, new finishes, modification to existing stair, new lighting,no change to mechanical system. no change to exterior. | $285,000 |
| Nov 10, 2014 | Never finaled issued Nov 2014, no final | 134 Maiden Ln | demolish portion of interior fit-out per ab-017. include a portion of stair landing, exterior eling and brick paving o pdroperty behind construction barricade. remove awning, sign fabric. new construction barricade with vinyl graphics. t.i. under separate permit.Details
demolish portion of interior fit-out per ab-017. include a portion of stair landing, exterior eling and brick paving o pdroperty behind construction barricade. remove awning, sign fabric. new construction barricade with vinyl graphics. t.i. under separate permit. | $11,500 |
| Oct 21, 2014 | Never finaled issued Oct 2014, no final | 46 Rausch St | interior remodel of (e) 2nd flr unit including new bathrm, kitchen remodle, rear bath remodel, replace window @ porch (3 total), remove rear stairs to 2nd flr & infill flr, remove int walls at rear, new closets @ (e) room, new laundry rm, new lighting, new gas furnace & water heater.Details
interior remodel of (e) 2nd flr unit including new bathrm, kitchen remodle, rear bath remodel, replace window @ porch (3 total), remove rear stairs to 2nd flr & infill flr, remove int walls at rear, new closets @ (e) room, new laundry rm, new lighting, new gas furnace & water heater. | $160,000 |
| Oct 16, 2013 | Never finaled issued Oct 2013, no final | 821 Sansome St | interior improvements with new interior partitions, upgrade of stair & handrails. upgrade o fexisting kitchenette with new ada compliant counter & sink.Details
interior improvements with new interior partitions, upgrade of stair & handrails. upgrade o fexisting kitchenette with new ada compliant counter & sink. | $18,850 |
| Dec 29, 2011 | Completed final sign-off May 2012 | 425 North Point St | demolition of e lobby storage closet to creat extended open space at lobby for concierge services or lobby library. also involves accesssibility upgrade to 1st fl reception area, 1st fl public restrooms and handrails at 2 sets of stairs off e lobbyDetails
demolition of e lobby storage closet to creat extended open space at lobby for concierge services or lobby library. also involves accesssibility upgrade to 1st fl reception area, 1st fl public restrooms and handrails at 2 sets of stairs off e lobby | $80,000 |
| Feb 1, 2011 | Completed final sign-off Dec 2011 | 2360 03rd St | revision to pa# 2010-0909-0558. rebuild interior stairs on 2nd floor. revise stair handrail extension in lobby #2.Details
revision to pa# 2010-0909-0558. rebuild interior stairs on 2nd floor. revise stair handrail extension in lobby #2. | $3,000 |