Back to bathroom remodel contractors
Angotti & Reilly Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Jan 2026
- Last 24 months
- 5 permits filed
203 permits since 2000: 139 completed, 7 in progress, 34 never finaled, 23 expired or cancelled.
Of the 34 never-finaled permits, 4 are 3 to 5 years old, 9 are 5 to 10 years old, 21 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 8 completed, 5 never finaled. Typically 15 days from filing to permit and 239 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2021 | Completed final sign-off Apr 2026 | 2700 21st St | convert 1/f commercial space to 1 residential unit with 3-bedrooms & 2 baths. (e) residential unit to remain (e) detached garage structure to remain. (e) rear yard and seve as common usage outdoor space to remain. new sprinkler system sep permit nfpa-13d.Details
convert 1/f commercial space to 1 residential unit with 3-bedrooms & 2 baths. (e) residential unit to remain (e) detached garage structure to remain. (e) rear yard and seve as common usage outdoor space to remain. new sprinkler system sep permit nfpa-13d. | $300,000 |
| Mar 9, 2021 | Completed final sign-off Oct 2024 | 15 Crescent Av | exterior- rebuild front entry stair, repair/restore (e) horizontal wood siding on entire structure. (n) addition & deck at rear. replace all wood windows. interior- renovate (e) kitchen & bath. repair (e) finishes & wood framing. (n) bath in (n) rear addition.Details
exterior- rebuild front entry stair, repair/restore (e) horizontal wood siding on entire structure. (n) addition & deck at rear. replace all wood windows. interior- renovate (e) kitchen & bath. repair (e) finishes & wood framing. (n) bath in (n) rear addition. | $217,351 |
| May 24, 2019 | Never finaled issued Jun 2019, no final | 50 08th St | remodel interior. construction non structural wall. convert (e) hotel suite to 2 hotel guestrooms. remodel (e) guestrooms & bathrooms. revision to 201904238756Details
remodel interior. construction non structural wall. convert (e) hotel suite to 2 hotel guestrooms. remodel (e) guestrooms & bathrooms. revision to 201904238756 | $50,000 |
| Mar 11, 2019 | Never finaled issued Mar 2019, no final | 1300 Columbus Av | gypsum board repairs at guestrooms, guest bathrooms and and corridors on floors 1-5 to abate mold (hazardous material) discovered in construction of barriel removal upgrade permit 2018-1012-3068Details
gypsum board repairs at guestrooms, guest bathrooms and and corridors on floors 1-5 to abate mold (hazardous material) discovered in construction of barriel removal upgrade permit 2018-1012-3068 | $10,000 |
| Feb 3, 2016 | Completed final sign-off May 2016 | 345 Taylor St | interior renovation of existing non-accessible hotel guest bathrooms. work includes removal & replacement of (e) plumbing fixtures & finishes in bathrooms.no change to occupancy or egress. maher n/aDetails
interior renovation of existing non-accessible hotel guest bathrooms. work includes removal & replacement of (e) plumbing fixtures & finishes in bathrooms.no change to occupancy or egress. maher n/a | $132,000 |
| Jul 30, 2015 | Completed final sign-off Dec 2017 | 2961 Mission St | change of use. ti to convert grd floor retail space to cooking school and full service restaurant, work include; new entry/exits, new ada bathrooms, installation of cooking school equipment, install cooking school equipment, replacement of storefront glazing, reveal concealed storefront clerestory.Details
change of use. ti to convert grd floor retail space to cooking school and full service restaurant, work include; new entry/exits, new ada bathrooms, installation of cooking school equipment, install cooking school equipment, replacement of storefront glazing, reveal concealed storefront clerestory. | $250,000 |
| Dec 23, 2014 | Never finaled issued Jan 2015, no final | 950 Mason St | new fixtures finishes & equipment in 3 specialty suites bathrooms in main building and tower. non structural modifications to partition layout, relocate bathrooms, no exterior work. sprinkler modifications under seperate permit. n/a ordinance #155-13.Details
new fixtures finishes & equipment in 3 specialty suites bathrooms in main building and tower. non structural modifications to partition layout, relocate bathrooms, no exterior work. sprinkler modifications under seperate permit. n/a ordinance #155-13. | $105,000 |
| Oct 21, 2014 | Never finaled issued Oct 2014, no final | 46 Rausch St | interior remodel of (e) 2nd flr unit including new bathrm, kitchen remodle, rear bath remodel, replace window @ porch (3 total), remove rear stairs to 2nd flr & infill flr, remove int walls at rear, new closets @ (e) room, new laundry rm, new lighting, new gas furnace & water heater.Details
interior remodel of (e) 2nd flr unit including new bathrm, kitchen remodle, rear bath remodel, replace window @ porch (3 total), remove rear stairs to 2nd flr & infill flr, remove int walls at rear, new closets @ (e) room, new laundry rm, new lighting, new gas furnace & water heater. | $160,000 |
| Jul 28, 2014 | Never finaled issued Dec 2014, no final | 33 Powell St | voluntary seismic upgrade from basement to underside of 2nd floor. plus plywood sheathing at floors 2-6. (n) public bathrooms in basement. ** maher: compliance with ordinance no# 155-13 not required **Details
voluntary seismic upgrade from basement to underside of 2nd floor. plus plywood sheathing at floors 2-6. (n) public bathrooms in basement. ** maher: compliance with ordinance no# 155-13 not required ** | $1,200,000 |
| Mar 19, 2010 | Completed final sign-off Jun 2010 | 3303 Fillmore St | replace kitchen cabinets & appliances, replace bathroom tile (2 bathrooms), replace sink & toilet. replace 3 windows on 3rd floor, 1 visible from street, no structural work or egress changes. lighting shall comply with cec 150kDetails
replace kitchen cabinets & appliances, replace bathroom tile (2 bathrooms), replace sink & toilet. replace 3 windows on 3rd floor, 1 visible from street, no structural work or egress changes. lighting shall comply with cec 150k | $45,000 |
| Apr 4, 2006 | Completed final sign-off Feb 2007 | 1835 Franklin St | renovate kitchen & (2) bathrooms. to comply with nov#200230589 item#3.Details
renovate kitchen & (2) bathrooms. to comply with nov#200230589 item#3. | $110,000 |
| Dec 29, 2005 | Completed final sign-off Mar 2006 | 230 West Portal Av | revision to bathroom job pa# 2005/11/10/7898.Details
revision to bathroom job pa# 2005/11/10/7898. | |
| Aug 11, 2005 | Completed final sign-off Jan 2006 | 3024 Washington St | remodel existing bathroom, new toilet, vanity, shower. reviste existing plumbing. new exhaust fanDetails
remodel existing bathroom, new toilet, vanity, shower. reviste existing plumbing. new exhaust fan | $25,000 |