Block 0857, lot 007
55 Laguna St
- City’s use
- Multi-Family Residential
- Lot
- 14,786 sq ft
- Zoning
- NC3
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
30 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 23, 2026 | In progress issued Jul 2026 | 55 Laguna St | Bobcomm Llc Dba Pacific Das Llc. | ref 202107134220-replacing bi directional amplifier to meet sfdt requirments.Details
ref 202107134220-replacing bi directional amplifier to meet sfdt requirments. | $21,000 |
| Dec 19, 2025 | In progress issued Dec 2025 | 95 Laguna St | United Systems Fire And Security Llc | to verify existing sound levels in sleeping areas compying w sffc section 1103.7.6.1Details
to verify existing sound levels in sleeping areas compying w sffc section 1103.7.6.1 | |
| Dec 19, 2025 | In progress issued Dec 2025 | 55 Laguna St | United Systems Fire And Security Llc | to verify existing sound level in sleeping areas complying with sff section 1103,7.6.1Details
to verify existing sound level in sleeping areas complying with sff section 1103,7.6.1 | |
| Dec 1, 2022 | Completed final sign-off Jan 2023 | 75 Laguna St | Potter Fire Protection | relocate (3) fire sprinklers. ref bpa#202210244979Details
relocate (3) fire sprinklers. ref bpa#202210244979 | $1,600 |
| Oct 24, 2022 | Completed final sign-off Mar 2023 | 75 Laguna St | Angotti & Reilly Inc. | 1/f & 2/f: subdivide 1 large office into 3 offices, replace lighting in meeting room, add automatic door opener to (4) restroom doors. fire alarm/sprinklers under sep permits.Details
1/f & 2/f: subdivide 1 large office into 3 offices, replace lighting in meeting room, add automatic door opener to (4) restroom doors. fire alarm/sprinklers under sep permits. | $228,597 |
| Jul 13, 2021 | Completed final sign-off May 2022 | 95 Laguna St | Weckworth Electric Group Inc | red cloud to replace the errcs bda head end unit as well as the donor "roof" antenna to comply w/ sf fraquencies, all other components remain unchanged. ref# 201811014814.Details
red cloud to replace the errcs bda head end unit as well as the donor "roof" antenna to comply w/ sf fraquencies, all other components remain unchanged. ref# 201811014814. | |
| Nov 13, 2020 | Completed final sign-off Feb 2021 | 75 Laguna St | James E Roberts-Obayashi Corporation | caulk and repair dry wall only located at basement, first, and second floor (senior center)Details
caulk and repair dry wall only located at basement, first, and second floor (senior center) | $120,000 |
| Jan 30, 2020 | Completed final sign-off Feb 2020 | 75 Laguna St | Arana Group, Inc. | evacuation map.Details
evacuation map. | $1,500 |
| Nov 22, 2019 | Never finaled filed Nov 2019, never issued | 75 Laguna St | change of occupancy load calculation only. reference permit application #201908148714. **maher n/a**Details
change of occupancy load calculation only. reference permit application #201908148714. **maher n/a** | ||
| Oct 30, 2019 | Completed final sign-off Mar 2020 | 75 Laguna St | Pac Integrations Inc | fire alarm system ti: add 10 new smoke detectors for fsds shut down, add 3 new manual pull stations and 3 new horn strobes (one exterior) on basement and first floorDetails
fire alarm system ti: add 10 new smoke detectors for fsds shut down, add 3 new manual pull stations and 3 new horn strobes (one exterior) on basement and first floor | $9,000 |
| Oct 24, 2019 | Completed final sign-off Feb 2020 | 75 Laguna St | Arana Group, Inc. | add fire dampers to mechanical system for fire rated walls added under app#201908148714. n/a for maherDetails
add fire dampers to mechanical system for fire rated walls added under app#201908148714. n/a for maher | $5,000 |
| Oct 17, 2019 | Never finaled issued Oct 2019, no final | 75 Laguna St | Arana Group, Inc. | street spaceDetails
street space | |
| Aug 14, 2019 | Completed final sign-off Nov 2019 | 75 Laguna St | Arana Group, Inc. | change occupancy class on 1st story & basement to i-4 (adult day care) with required upgrades. create 1-hour enclosure at lobbies and corridors. maher n/a.Details
change occupancy class on 1st story & basement to i-4 (adult day care) with required upgrades. create 1-hour enclosure at lobbies and corridors. maher n/a. | |
| Jul 3, 2019 | Completed final sign-off Feb 2020 | 75 Laguna St | M C Metal Inc | rev to 201902142980; add steel stair details.Details
rev to 201902142980; add steel stair details. | |
| Jun 14, 2019 | Completed final sign-off Feb 2020 | 75 Laguna St | Red Hawk Fire & Security Ca Llc | revision to pa 201905221345. use of flexible dropsDetails
revision to pa 201905221345. use of flexible drops | |
| Jun 13, 2019 | Completed final sign-off Jul 2020 | 75 Laguna St | Pac Integrations Inc | basement and 1st floor: adding fire alarm devices to existing fire alarm system at this building.Details
basement and 1st floor: adding fire alarm devices to existing fire alarm system at this building. | $20,000 |
| Jun 7, 2019 | Never finaled issued Jun 2019, no final | 75 Laguna St | street spaceDetails
street space | ||
| Jun 7, 2019 | Never finaled filed Jun 2019, never issued | 75 Laguna St | street space | ||
| May 22, 2019 | Completed final sign-off Feb 2020 | 75 Laguna St | Red Hawk Fire & Security Ca Llc | add and relocate sprinklers in area of work to provide adequate sprinkler coverage to new tenant improvement walls and ceilings in area of work onlyDetails
add and relocate sprinklers in area of work to provide adequate sprinkler coverage to new tenant improvement walls and ceilings in area of work only | $28,000 |
| Mar 19, 2019 | Never finaled issued Mar 2019, no final | 95 Laguna St | street spaceDetails
street space | ||
| Mar 19, 2019 | Never finaled filed Mar 2019, never issued | 95 Laguna St | streetspace | ||
| Feb 14, 2019 | Completed final sign-off Feb 2020 | 75 Laguna St | Arana Group, Inc. | tenant improvement in shell space partitions, stairway, hvac, lighting, finishes, extend sprinkler and alarm systemDetails
tenant improvement in shell space partitions, stairway, hvac, lighting, finishes, extend sprinkler and alarm system | $2,500,000 |
| Nov 1, 2018 | Never finaled issued Dec 2018, no final | 95 Laguna St | James E Roberts-Obayashi Corporation | installation of emergency responder radio coverage system. reference pa# 2015/07/06/0668. ** maher: n/a **Details
installation of emergency responder radio coverage system. reference pa# 2015/07/06/0668. ** maher: n/a ** | $50,000 |
| Oct 31, 2018 | Completed final sign-off May 2019 | 95 Laguna St | Garnett Signs Llc | installation of 20 evacuation map signs.Details
installation of 20 evacuation map signs. | $12,000 |
| Sep 13, 2018 | Never finaled issued Sep 2018, no final | 95 Laguna St | street spaceDetails
street space | ||
| Aug 31, 2018 | Completed final sign-off Jun 2020 | 95 Laguna St | James E Roberts-Obayashi Corporation | storm water control plan review. building under permit application #2015/0706/0668sDetails
storm water control plan review. building under permit application #2015/0706/0668s | $50,000 |
| Mar 13, 2018 | Never finaled issued Mar 2018, no final | 95 Laguna St | street spaceDetails
street space | ||
| Feb 5, 2018 | Never finaled issued Feb 2018, no final | 95 Laguna St | Westates Mechanical Corporation Inc | install 31' of 6" underground ductile iron cement lined from city curb to inside of bldg for fire service. includes 6" ames 300osy/colt 300n bfp above ground ref app#201507060668(s)4 n/a for maherDetails
install 31' of 6" underground ductile iron cement lined from city curb to inside of bldg for fire service. includes 6" ames 300osy/colt 300n bfp above ground ref app#201507060668(s)4 n/a for maher | $12,000 |
| Nov 15, 2017 | Completed final sign-off Apr 2019 | 95 Laguna St | James E Roberts-Obayashi Corporation | erect tower crane for construction of 79 unit senior residence ref pa 2015-0706-0668. will be erecting a potain mdt 219-510 jib 131ft, hook 114'Details
erect tower crane for construction of 79 unit senior residence ref pa 2015-0706-0668. will be erecting a potain mdt 219-510 jib 131ft, hook 114' | $40,000 |
| Jul 6, 2015 | Completed final sign-off Jul 2020 | 95 Laguna St | James E Roberts-Obayashi Corporation, Pac Integrations Inc | to erect 6 stories, no basement, 79 units residential senior center building.Details
to erect 6 stories, no basement, 79 units residential senior center building. | $21,000,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.