Miguel Guzman
- Listed as
- authorized agent-others, contractor
- Firm
- Guzman Construction Group Inc.
- Based in
- San Francisco
- On San Francisco permits
- May 2015 to Sep 2026
170 permits since 2000 (contractor on 168 permits, authorized agent-others on 17 permits): 111 completed, 38 in progress, 17 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 170.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 1515 South Van Ness Av | Guzman Construction Group Inc. | install convience battery backup system for non-life safety systems. primarily for convience plugs and additional light due to occupants being elderly or disabled. this pa to supplement 202306059259 & 202411074565Details
install convience battery backup system for non-life safety systems. primarily for convience plugs and additional light due to occupants being elderly or disabled. this pa to supplement 202306059259 & 202411074565 | $350,000 |
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 80 Julian Av | Guzman Construction Group Inc. | pid only permit for pid review of plumbing and storm water control plan plumbing scope.Details
pid only permit for pid review of plumbing and storm water control plan plumbing scope. | |
| Aug 14, 2026 | Completed final sign-off Aug 2026 | 2330 Bush St | Guzman Construction Group Inc. | to obtain final inspection for work approved under pa#: 202404129941. all work is complete.Details
to obtain final inspection for work approved under pa#: 202404129941. all work is complete. | |
| Aug 14, 2026 | Completed final sign-off Aug 2026 | 2390 Bush St | Guzman Construction Group Inc. | to obtain final inspection for work approved under pa#: 202403157918. all work is complete.Details
to obtain final inspection for work approved under pa#: 202403157918. all work is complete. | |
| Jul 30, 2026 | In progress issued Aug 2026 | 700 Missouri St | Guzman Construction Group Inc. | post demolition installation of permanent fence to protect remaining site. ref potrero hope phase 3 demolition 202604038875, fence not to impead on public access.Details
post demolition installation of permanent fence to protect remaining site. ref potrero hope phase 3 demolition 202604038875, fence not to impead on public access. | $160,000 |
| Jul 29, 2026 | Completed final sign-off Aug 2026 | 1055 Ellis St | Guzman Construction Group Inc. | temporary ada ramp to provide accessible entrance while elevator work is in progress. ref permit 202312212924Details
temporary ada ramp to provide accessible entrance while elevator work is in progress. ref permit 202312212924 | $10,000 |
| Jun 12, 2026 | Completed final sign-off Sep 2026 | 4101 Noriega St | Guzman Construction Group Inc. | to obtain final inspection for work approved under pa# 202303133537. all work is complete.Details
to obtain final inspection for work approved under pa# 202303133537. all work is complete. | |
| Jun 9, 2026 | In progress issued Aug 2026 | 105 Wisteria Ln | Guzman Construction Group Inc. | installation of the tower crane for the project balboa reservoir building a. the tower crane foundation permit is included in site permit addendum 1: 202503313370-s1.Details
installation of the tower crane for the project balboa reservoir building a. the tower crane foundation permit is included in site permit addendum 1: 202503313370-s1. | $100,000 |
| Jun 3, 2026 | In progress filed Jun 2026, not yet issued | 870 Mcallister St | Guzman Construction Group Inc. | demolish type 5b 12 unit residential buildingDetails
demolish type 5b 12 unit residential building | $47,880 |
| Jun 3, 2026 | In progress filed Jun 2026, not yet issued | 898 Mcallister St | Guzman Construction Group Inc. | demolish type 5b 12 unit residential buildingDetails
demolish type 5b 12 unit residential building | $47,880 |
| Jun 2, 2026 | In progress issued Jun 2026 | 1100 Ellis St | Guzman Construction Group Inc. | deferred electrical plans for pa #202604179653Details
deferred electrical plans for pa #202604179653 | $86,000 |
| May 29, 2026 | Completed final sign-off Jun 2026 | 105 Wisteria Ln | administrative permit to document change of address of pa#202503313370 from 11 frida kahlo way apn 3180-190 to 105 wisteria lane apn 3180-201.Details
administrative permit to document change of address of pa#202503313370 from 11 frida kahlo way apn 3180-190 to 105 wisteria lane apn 3180-201. | ||
| May 27, 2026 | In progress issued Jun 2026 | 1100 Ellis St | Guzman Construction Group Inc. | 1/fl-revision 202604179653- m/p modifications. existing base building system is not in scope and is to remain.Details
1/fl-revision 202604179653- m/p modifications. existing base building system is not in scope and is to remain. | $100,000 |
| May 5, 2026 | In progress issued Sep 2026 | 101 Santos St | Cahill Guzman Construction Group Jv | block 7 - ebm system - deffered permit under pa #202211297323Details
block 7 - ebm system - deffered permit under pa #202211297323 | $50,000 |
| Apr 17, 2026 | In progress issued May 2026 | 1100 Ellis St | Guzman Construction Group Inc. | 1/fl-reconfiguration of (e) admin offices and classroom. a unisex restroom will be made accessibleDetails
1/fl-reconfiguration of (e) admin offices and classroom. a unisex restroom will be made accessible | $340,536 |
| Apr 16, 2026 | In progress filed Apr 2026, not yet issued | 860 Mcallister St | Guzman Construction Group Inc. | demolish type 5b 12 unit residential buildingDetails
demolish type 5b 12 unit residential building | $47,880 |
| Apr 3, 2026 | In progress issued Apr 2026 | 0 Situs To Be Assigned | Guzman Construction Group Inc. | building d-18: demolish of a type-v, 2-story, 8 unit residential r-2. (aka 700-714 missouri st)Details
building d-18: demolish of a type-v, 2-story, 8 unit residential r-2. (aka 700-714 missouri st) | $60,000 |
| Apr 3, 2026 | Completed final sign-off Aug 2026 | 700 Missouri St | Guzman Construction Group Inc. | building a-3: demolish of a type-v, 2-story, 2 unit mix use residential r-3,b .Details
building a-3: demolish of a type-v, 2-story, 2 unit mix use residential r-3,b . | $60,000 |
| Apr 3, 2026 | Completed final sign-off Aug 2026 | 1 Watchman Wy | Guzman Construction Group Inc. | building c-13: demolish of a type-v, 2-story, 8 unit residential r-2 .Details
building c-13: demolish of a type-v, 2-story, 8 unit residential r-2 . | $60,000 |
| Apr 3, 2026 | Completed final sign-off Aug 2026 | 1 Turner Tr | Guzman Construction Group Inc. | building c-9: demolish of a type-v, 2-story, 6 unit residential r-2 .Details
building c-9: demolish of a type-v, 2-story, 6 unit residential r-2 . | $60,000 |
| Apr 3, 2026 | Completed final sign-off Aug 2026 | 700 Missouri St | Guzman Construction Group Inc. | building c-12: demolish of a type-v, 2-story, 7 unit residential r-2 .Details
building c-12: demolish of a type-v, 2-story, 7 unit residential r-2 . | $60,000 |
| Apr 3, 2026 | Completed final sign-off Aug 2026 | 700 Missouri St | Guzman Construction Group Inc. | building d-21: demolish of a type-v, 2-story, 8 unit residential r-2 .Details
building d-21: demolish of a type-v, 2-story, 8 unit residential r-2 . | $60,000 |
| Apr 3, 2026 | Completed final sign-off Sep 2026 | 97 Watchman Wy | Guzman Construction Group Inc. | building c-16: demolish of a type-v, 2-story, 7 unit residential r-2 .Details
building c-16: demolish of a type-v, 2-story, 7 unit residential r-2 . | $60,000 |
| Apr 3, 2026 | In progress issued Apr 2026 | 0 Situs To Be Assigned | Guzman Construction Group Inc. | building d-20: demolish of a type-v, 2-story, 7 unit residential r-2 . (aka 762-774 missouri st)Details
building d-20: demolish of a type-v, 2-story, 7 unit residential r-2 . (aka 762-774 missouri st) | $60,000 |
| Apr 3, 2026 | Completed final sign-off Aug 2026 | 1 Turner Tr | Guzman Construction Group Inc. | building c-8: demolish of a type-v, 2-story, 8 unit residential r-2 .Details
building c-8: demolish of a type-v, 2-story, 8 unit residential r-2 . | $60,000 |
| Apr 3, 2026 | Completed final sign-off Sep 2026 | 65 Turner Tr | Guzman Construction Group Inc. | building c-10: demolish of a type-v, 2-story, 8 unit residential r-2 .Details
building c-10: demolish of a type-v, 2-story, 8 unit residential r-2 . | $60,000 |
| Apr 3, 2026 | Completed final sign-off Aug 2026 | 1 Turner Tr | Guzman Construction Group Inc. | building b-4: demolish of a type-v, 2-story, 6 unit residential r-2 .Details
building b-4: demolish of a type-v, 2-story, 6 unit residential r-2 . | $60,000 |
| Apr 3, 2026 | Completed final sign-off Aug 2026 | 1 Watchman Wy | Guzman Construction Group Inc. | building c-15: demolish of a type-v, 2-story, 7 unit residential r-2 .Details
building c-15: demolish of a type-v, 2-story, 7 unit residential r-2 . | $60,000 |
| Apr 3, 2026 | Completed final sign-off Aug 2026 | 1 Turner Tr | Guzman Construction Group Inc. | building a-1: demolish of a type-v, 2-story, 6 unit residential r-2 .Details
building a-1: demolish of a type-v, 2-story, 6 unit residential r-2 . | $60,000 |
| Apr 3, 2026 | Completed final sign-off Aug 2026 | 700 Missouri St | Guzman Construction Group Inc. | building b-6: demolish of a type-v, 2-story, 6 unit residential r-2 .Details
building b-6: demolish of a type-v, 2-story, 6 unit residential r-2 . | $60,000 |
| Apr 3, 2026 | Completed final sign-off Aug 2026 | 1 Turner Tr | Guzman Construction Group Inc. | building c-11: demolish of a type-v, 2-story, 8 unit residential r-2 .Details
building c-11: demolish of a type-v, 2-story, 8 unit residential r-2 . | $60,000 |
| Apr 3, 2026 | In progress issued Apr 2026 | 0 Situs To Be Assigned | Guzman Construction Group Inc. | building d-19: demolish of a type-v, 2-story, 8 unit residential r-2 . (aka 730-744 missouri st)Details
building d-19: demolish of a type-v, 2-story, 8 unit residential r-2 . (aka 730-744 missouri st) | $60,000 |
| Apr 3, 2026 | Completed final sign-off Aug 2026 | 700 Missouri St | Guzman Construction Group Inc. | building d-22: demolish of a type-v, 2-story, 6 unit residential r-2 .Details
building d-22: demolish of a type-v, 2-story, 6 unit residential r-2 . | $60,000 |
| Apr 3, 2026 | Completed final sign-off Aug 2026 | 1 Watchman Wy | Guzman Construction Group Inc. | building b-5: demolish of a type-v, 2-story, 6 unit residential r-2 .Details
building b-5: demolish of a type-v, 2-story, 6 unit residential r-2 . | $60,000 |
| Apr 3, 2026 | Completed final sign-off Aug 2026 | 1 Turner Tr | Guzman Construction Group Inc. | building a-2: demolish of a type-v, 2-story, 1 unit mix use residential r-2/b .Details
building a-2: demolish of a type-v, 2-story, 1 unit mix use residential r-2/b . | $60,000 |
| Apr 3, 2026 | Completed final sign-off Aug 2026 | 1 Watchman Wy | Guzman Construction Group Inc. | building c-14: demolish of a type-v, 2-story, 7 unit residential r-2 .Details
building c-14: demolish of a type-v, 2-story, 7 unit residential r-2 . | $60,000 |
| Apr 3, 2026 | Completed final sign-off Sep 2026 | 901 Missouri St | Guzman Construction Group Inc. | building c-17: demolish of a type-v, 2-story, 7 unit residential r-2. the building spans over two lots 4167/004 and 4223/001Details
building c-17: demolish of a type-v, 2-story, 7 unit residential r-2. the building spans over two lots 4167/004 and 4223/001 | $60,000 |
| Mar 9, 2026 | Completed final sign-off Aug 2026 | 1 Watchman Wy | Guzman Construction Group Inc. | building d-23: demolition of a type-v, 2-story, 8 unit residential apt building. aka address 65-79 watchman way- the building spans over two lots 4167/004 and 4223/001.Details
building d-23: demolition of a type-v, 2-story, 8 unit residential apt building. aka address 65-79 watchman way- the building spans over two lots 4167/004 and 4223/001. | $35,000 |
| Jan 21, 2026 | In progress issued Aug 2026 | 1055 Ellis St | Guzman Construction Group Inc. | revision to pa 202510248084 underpinning method to replace shoring previously approved associated (n) elevator shoring & foundation. ref pa 202312212924.Details
revision to pa 202510248084 underpinning method to replace shoring previously approved associated (n) elevator shoring & foundation. ref pa 202312212924. | |
| Jan 12, 2026 | In progress issued May 2026 | 3300 Mission St | Guzman Construction Group Inc. | errcs for pa 2023-1025-9516Details
errcs for pa 2023-1025-9516 | $10,000 |
| Jan 8, 2026 | In progress issued Jul 2026 | 80 Julian Av | Guzman Construction Group Inc. | alt site pa202212098043 ed13-01: increase units to 36.remove lvl b2.lvl 1:lobby space to be restaurant space.lvl 2: office spaces replaced w/ proposed tech hub.lvl 3:dental care becomes behavorial health floor.lvl 4: med care floor to become residential floor. lvl 5 & 6: minor layout changes.Details
alt site pa202212098043 ed13-01: increase units to 36.remove lvl b2.lvl 1:lobby space to be restaurant space.lvl 2: office spaces replaced w/ proposed tech hub.lvl 3:dental care becomes behavorial health floor.lvl 4: med care floor to become residential floor. lvl 5 & 6: minor layout changes. | |
| Dec 19, 2025 | In progress filed Dec 2025, not yet issued | 3300 Mission St | Guzman Construction Group Inc. | revision to 202310259516 addendum 2, revision 4: change to mechanical fire rating. elimination of select rated ceilings, change in wall ratings, added duct wrap, added fsdsDetails
revision to 202310259516 addendum 2, revision 4: change to mechanical fire rating. elimination of select rated ceilings, change in wall ratings, added duct wrap, added fsds | $10,000 |
| Nov 26, 2025 | In progress filed Nov 2025, not yet issued | 600 07th St | Guzman Construction Group Inc. | change locksets on horizontal exit doors level 2-7 to be electronically locked and release in the event of power outage or on command from the fire alarm control center.Details
change locksets on horizontal exit doors level 2-7 to be electronically locked and release in the event of power outage or on command from the fire alarm control center. | $6,000 |
| Nov 21, 2025 | Completed final sign-off Feb 2026 | 1010 Eddy St | Guzman Construction Group Inc. | to comply with nov #202544498 related to damage to part of an existing site retaining wall. including demolition of the damaged portion of the wall and replacement with a new reinforced concrete wall.Details
to comply with nov #202544498 related to damage to part of an existing site retaining wall. including demolition of the damaged portion of the wall and replacement with a new reinforced concrete wall. | $10,000 |
| Oct 24, 2025 | In progress issued Nov 2025 | 1055 Ellis St | Guzman Construction Group Inc. | provide soil shoring at (n) elevator shoring + foundation. ref pa 202312212924.Details
provide soil shoring at (n) elevator shoring + foundation. ref pa 202312212924. | |
| Oct 17, 2025 | In progress issued Dec 2025 | 2970 16th St | Guzman Construction Group Inc. | reference bpa#202508253788.temporary bracing of neighboring shared wall.structural onlyDetails
reference bpa#202508253788.temporary bracing of neighboring shared wall.structural only | $500,000 |
| Oct 7, 2025 | Completed final sign-off Oct 2025 | 15 Dakota St | Guzman Construction Group Inc. | relocation of existing garden gazebo from 32 watchman wy to 15 dakota st. construct four new foundation footing to support existing gazebo.Details
relocation of existing garden gazebo from 32 watchman wy to 15 dakota st. construct four new foundation footing to support existing gazebo. | $2,000 |
| Oct 1, 2025 | In progress issued Jan 2026 | 1055 Ellis St | Guzman Construction Group Inc. | (n) entrance to the third floor of the la salle building and remnovation of the interior thrid floor of the la salle building to include non structural demo of interior partitions and finishes and mep systems to be replaced with new. no work in the public right of way and not facing street.Details
(n) entrance to the third floor of the la salle building and remnovation of the interior thrid floor of the la salle building to include non structural demo of interior partitions and finishes and mep systems to be replaced with new. no work in the public right of way and not facing street. | $5,000,000 |
| Sep 3, 2025 | In progress issued Apr 2026 | 700 Missouri St | Guzman Construction Group Inc. | building c-7: demolition of a type-v, 2-story, 8 unit residential apt building.Details
building c-7: demolition of a type-v, 2-story, 8 unit residential apt building. | $35,000 |
| Jul 18, 2025 | Completed final sign-off Jun 2026 | 1515 South Van Ness Av | Guzman Construction Group Inc. | plumbing plan review only for storm water control plan. ref pa #202306059259Details
plumbing plan review only for storm water control plan. ref pa #202306059259 | $9,688 |
| Jun 2, 2025 | In progress issued Jul 2026 | 880 Mcallister St | Guzman Construction Group Inc. | 100% afforable senior housing for a 104,000sf type 1, 7 story/115 unit with commerical ground floor. 81 1-bedroom and 35-2 bedroom units. 2 ground floor landscape courtyard and roof terrace.Details
100% afforable senior housing for a 104,000sf type 1, 7 story/115 unit with commerical ground floor. 81 1-bedroom and 35-2 bedroom units. 2 ground floor landscape courtyard and roof terrace. | $70,000,000 |
| May 1, 2025 | Completed final sign-off Nov 2025 | 940 Laguna Honda Bl | Guzman Construction Group Inc. | alterations to bathrooms to make accessible.Details
alterations to bathrooms to make accessible. | $200,000 |
| May 1, 2025 | In progress filed May 2025, not yet issued | 3300 Mission St | Guzman Construction Group Inc. | priority - temporary shoring of the elevator pit including driven piles and horizontal braces.Details
priority - temporary shoring of the elevator pit including driven piles and horizontal braces. | $10,000 |
| Apr 24, 2025 | Completed final sign-off Sep 2026 | 4101 Noriega St | Guzman Construction Group Inc. | revision to permit 202303133537. relocating main switchgear location to adjacent wall, inside the garage. 100% affortable project.Details
revision to permit 202303133537. relocating main switchgear location to adjacent wall, inside the garage. 100% affortable project. | $100,000 |
| Apr 14, 2025 | In progress issued Sep 2025 | 11 Frida Kahlo Wy | Guzman Construction Group Inc. | mayoral ed13-01: erect 6 story type 1b 159 residential unit affordable housingDetails
mayoral ed13-01: erect 6 story type 1b 159 residential unit affordable housing | $97,000,000 |
| Mar 10, 2025 | In progress issued May 2025 | 1501 Sunnydale Av | Guzman Construction Group Inc. | priority processing. mayor's dir #17-02. sunnydale block 7: construction of tower crane foundation. this foundation will be intergral with the mat foundation of the building.Details
priority processing. mayor's dir #17-02. sunnydale block 7: construction of tower crane foundation. this foundation will be intergral with the mat foundation of the building. | $100,000 |
| Nov 21, 2024 | In progress issued Jan 2025 | 1515 South Van Ness Av | Guzman Construction Group Inc. | ed 13-01. priority prj - alter site to pa# 202306059259 s: construction type changed to 1-b from 1-a. early childhood education center occupancy type changed to 1-4 from e.revision from issued site permit present on g001,g400,g401,a300 & a302. all other sheets are indentical to approved site permit.Details
ed 13-01. priority prj - alter site to pa# 202306059259 s: construction type changed to 1-b from 1-a. early childhood education center occupancy type changed to 1-4 from e.revision from issued site permit present on g001,g400,g401,a300 & a302. all other sheets are indentical to approved site permit. | $60,708,870 |
| Oct 21, 2024 | In progress issued Mar 2025 | 1055 Ellis St | Guzman Construction Group Inc. | conversion of existing classroom into training room with recovery equipment and an office.Details
conversion of existing classroom into training room with recovery equipment and an office. | $375,000 |
| Sep 24, 2024 | Completed final sign-off Oct 2024 | 1515 South Van Ness Av | Guzman Construction Group Inc., Asbetos Management Group | ref 202407237064- abatement of asbestos and lead containing material report number r1247352Details
ref 202407237064- abatement of asbestos and lead containing material report number r1247352 | $50,000 |
| Aug 27, 2024 | In progress issued Nov 2024 | 3300 Mission St | Guzman Construction Group Inc. | demo a 3-story commercial & residential bldg.Details
demo a 3-story commercial & residential bldg. | $200,000 |
| Aug 13, 2024 | Completed final sign-off Feb 2025 | 7070 California St | Guzman Construction Group Inc. | rev 202403198159- to include keeping an (e) exterior door that was planned to be removed and additional foundation work required.Details
rev 202403198159- to include keeping an (e) exterior door that was planned to be removed and additional foundation work required. | $15,000 |
| Aug 6, 2024 | Completed final sign-off Dec 2024 | 333 Dolores St | Guzman Construction Group Inc. | record of passing emergency radio responder controls benchmark testing report for new construction project at 333 dolres st.Details
record of passing emergency radio responder controls benchmark testing report for new construction project at 333 dolres st. | |
| Jul 23, 2024 | Completed final sign-off Dec 2024 | 1515 South Van Ness Av | Guzman Construction Group Inc. | priority mohcd. 100% affordable project ed 13-01. - to demolish a 1-story, type ii-b, commercial building.Details
priority mohcd. 100% affordable project ed 13-01. - to demolish a 1-story, type ii-b, commercial building. | |
| Jul 11, 2024 | In progress filed Jul 2024, not yet issued | 333 Dolores St | Guzman Construction Group Inc. | revision to addendum #3 of 202209071941 to memorialize allowable age group in specific classrooms per 2019 cbc occupancy group e definitionsDetails
revision to addendum #3 of 202209071941 to memorialize allowable age group in specific classrooms per 2019 cbc occupancy group e definitions | |
| May 14, 2024 | Completed final sign-off Nov 2024 | 333 Dolores St | Guzman Construction Group Inc. | revision to addendum #2 (foundation and structure) of pa# 202209071941: to remove (2) windows from east elevation in accordance with changes made during plan check revisions of addendum #3 (amep).Details
revision to addendum #2 (foundation and structure) of pa# 202209071941: to remove (2) windows from east elevation in accordance with changes made during plan check revisions of addendum #3 (amep). | |
| Apr 4, 2024 | Completed final sign-off Nov 2024 | 333 Dolores St | Guzman Construction Group Inc. | rev to pa2022-0907-1941 to remove fire rating from window 111e. opening to be projected with water curtain per cbc.705.8.2 exceptionDetails
rev to pa2022-0907-1941 to remove fire rating from window 111e. opening to be projected with water curtain per cbc.705.8.2 exception | |
| Mar 19, 2024 | Completed final sign-off Feb 2025 | 7070 California St | Guzman Construction Group Inc. | interior renovation of (e) backstage, storage area on level 1 to capture and convert (e) pe storage room as part of interior conditioning space expansion of upper level mezzanine to create a 2nd level for open office space work to include lighting electrical and mech to service renovated areas extDetails
interior renovation of (e) backstage, storage area on level 1 to capture and convert (e) pe storage room as part of interior conditioning space expansion of upper level mezzanine to create a 2nd level for open office space work to include lighting electrical and mech to service renovated areas ext | $200,000 |
| Jan 18, 2024 | Completed final sign-off Nov 2024 | 333 Dolores St | Guzman Construction Group Inc. | revision to pa# 202209071941, amep to incorporate machine room for lula elevator into the propose design.Details
revision to pa# 202209071941, amep to incorporate machine room for lula elevator into the propose design. | $5,000 |
| Dec 21, 2023 | In progress issued Oct 2025 | 1055 Ellis St | Guzman Construction Group Inc. | alterations to(e)lobby:demo & const of stairs & ramp,reception desk,guardrails & handrails.(e)(3)story elevator will be installed @ an adjacent location.finishes will be replaced incld paint,ceiling & floor.(n)arch lighting to be provided.mech & elec work limited to upgrades for renov & elevator.Details
alterations to(e)lobby:demo & const of stairs & ramp,reception desk,guardrails & handrails.(e)(3)story elevator will be installed @ an adjacent location.finishes will be replaced incld paint,ceiling & floor.(n)arch lighting to be provided.mech & elec work limited to upgrades for renov & elevator. | $1,600,000 |
| Dec 15, 2023 | In progress issued Jan 2024 | 1055 Ellis St | Guzman Construction Group Inc. | lobby: provide electrical, mechanical, and plumbing work for 2 new conference rooms in existing lobby space. ref ti permit 202306150165Details
lobby: provide electrical, mechanical, and plumbing work for 2 new conference rooms in existing lobby space. ref ti permit 202306150165 | $42,000 |
| Nov 29, 2023 | Completed final sign-off Jun 2025 | 78 Haight St | Guzman Construction Group Inc. | emergency shoring to support foundation and exterior wall of 68 haight st. 68 haight application #202311281518.Details
emergency shoring to support foundation and exterior wall of 68 haight st. 68 haight application #202311281518. | |
| Nov 10, 2023 | Completed final sign-off Sep 2025 | 600 07th St | Guzman Construction Group Inc. | elevator smoke detector access panel, ref bpa#20210196871-s8Details
elevator smoke detector access panel, ref bpa#20210196871-s8 | $5,000 |
| Oct 25, 2023 | In progress issued Jul 2024 | 3300 Mission St | Guzman Construction Group Inc. | priority processing: new 6-story type iiia over type 1a mixed-use bldg with 35 studio units (100% affordable housing mayor ed 13-01), residential community space, and commercial/retail space on 1st floor. preserve (e) 2-story facade along mission st and 29th st.Details
priority processing: new 6-story type iiia over type 1a mixed-use bldg with 35 studio units (100% affordable housing mayor ed 13-01), residential community space, and commercial/retail space on 1st floor. preserve (e) 2-story facade along mission st and 29th st. | $17,000,000 |
| Aug 30, 2023 | In progress issued Jan 2024 | 4 Embarcadero Center | Guzman Construction Group Inc. | suite 101: demolition of (e) casework and booths, new bar casework, new partition walls, new all infill, new butler door, new light fixtures and new bar and handwash sinks. patch and repair of (e) floor tiles, new paint finishDetails
suite 101: demolition of (e) casework and booths, new bar casework, new partition walls, new all infill, new butler door, new light fixtures and new bar and handwash sinks. patch and repair of (e) floor tiles, new paint finish | $200,000 |
| Aug 16, 2023 | In progress issued Mar 2024 | 2205 Mission St | Guzman Construction Group Inc. | demolition of a 3 story, type v-b commercial structure.Details
demolition of a 3 story, type v-b commercial structure. | $5,000 |
| Aug 4, 2023 | Completed final sign-off Nov 2024 | 333 Dolores St | Guzman Construction Group Inc. | civil stormwatr design & building plumbing design associated with bpa#202209071941Details
civil stormwatr design & building plumbing design associated with bpa#202209071941 | |
| Jun 15, 2023 | Completed final sign-off Sep 2025 | 1055 Ellis St | Guzman Construction Group Inc. | provide 2 new conference rooms in (e) lobby space.Details
provide 2 new conference rooms in (e) lobby space. | $186,000 |
| Jun 5, 2023 | In progress issued Jun 2024 | 1515 South Van Ness Av | Guzman Construction Group Inc., Guzman-Marinship Joint Venture | mohcd. 100% affordable project ed 13-01. to erect 9 stories, no basement, type i-a, 168 units residential apartments with mixed use building. (r-2,e)Details
mohcd. 100% affordable project ed 13-01. to erect 9 stories, no basement, type i-a, 168 units residential apartments with mixed use building. (r-2,e) | $59,568,292 |
| Mar 13, 2023 | Expired or cancelled expired Sep 2026 | 4101 Noriega St | Guzman Construction Group Inc. | revision to previously approved permits: 202110130352 & 202301069718. sow:interior-electrical. replace main switchgear. 100% affordable projectDetails
revision to previously approved permits: 202110130352 & 202301069718. sow:interior-electrical. replace main switchgear. 100% affordable project | |
| Jan 23, 2023 | Completed final sign-off Sep 2023 | 333 Dolores St | Guzman Construction Group Inc. | demolition of three (3) existing portable buildings and other miscellaneous site elements in preparation for a new construction project. no work at the existing st. joseph's hall building.Details
demolition of three (3) existing portable buildings and other miscellaneous site elements in preparation for a new construction project. no work at the existing st. joseph's hall building. | $17,000 |
| Jan 23, 2023 | Completed final sign-off Aug 2023 | 200 Randolph St | Guzman Construction Group Inc. | revision to previously approved permit pa #202103237113. revise height of concrete retaining wall at platform lift shaft to 8' correction for civil & structural.Details
revision to previously approved permit pa #202103237113. revise height of concrete retaining wall at platform lift shaft to 8' correction for civil & structural. | |
| Jan 6, 2023 | Completed final sign-off Sep 2023 | 4101 Noriega St | Guzman Construction Group Inc. | reduction in scope: mep only previously approved bpa 202110130352, original scope to replace main switchboard, the main switchboard to remain.Details
reduction in scope: mep only previously approved bpa 202110130352, original scope to replace main switchboard, the main switchboard to remain. | |
| Dec 12, 2022 | Completed final sign-off May 2025 | 100 Masonic Av | Guzman Construction Group Inc. | prop h: interior remodel &play area improvements for non-profit child development center. remodeling classrooms for infants & toddlers age-group, renovate (e) bathrooms, add additional unisex restrooms, remodel (e) offices & add additional lounge. (n) accessible path. remodel (e) play area at back.Details
prop h: interior remodel &play area improvements for non-profit child development center. remodeling classrooms for infants & toddlers age-group, renovate (e) bathrooms, add additional unisex restrooms, remodel (e) offices & add additional lounge. (n) accessible path. remodel (e) play area at back. | $1,600,000 |
| Nov 29, 2022 | In progress issued Jun 2024 | 1501 Sunnydale Av | Guzman Construction Group Inc. | priority processing. mayor's dir #17-02. erect a 5-story,89 dwelling units,with parking,assembly and offices. type va.Details
priority processing. mayor's dir #17-02. erect a 5-story,89 dwelling units,with parking,assembly and offices. type va. | $45,000,000 |
| Nov 14, 2022 | Completed final sign-off Oct 2023 | 4101 Noriega St | Guzman Construction Group Inc. | 100% affordable deferred submittal for approve bpa 202110130352 add fire escapes to 7 above ground public housing apartments. replace in-kind, juliet balcony + guardrail + (e).Details
100% affordable deferred submittal for approve bpa 202110130352 add fire escapes to 7 above ground public housing apartments. replace in-kind, juliet balcony + guardrail + (e). | $10,000 |
| Sep 7, 2022 | Completed final sign-off Nov 2024 | 333 Dolores St | Guzman Construction Group Inc. | erect a 1 story preschool bldg,no dwelling,no basement.type -vDetails
erect a 1 story preschool bldg,no dwelling,no basement.type -v | $7,500,000 |
| Jun 27, 2022 | Completed final sign-off May 2023 | 2550 Irving St | Guzman Construction Group Inc. | demolish a 2 story, 2 basement, office building.Details
demolish a 2 story, 2 basement, office building. | |
| May 5, 2022 | Never finaled issued Jun 2023, no final | 2550 Irving St | Eco Fire Sprinklers Inc, Guzman Construction Group Inc., Crime Watch Security Sys Llc, J O'driscoll Electrical Inc | to erect 7-story, type i-b, 90 dwelling units bldg with zero basements. to include residential support service office, property management office, bike parking, serice space, & residential parking with puzzle lift and pit stacker system. (100% affordable housing) mayor dir 13-01.Details
to erect 7-story, type i-b, 90 dwelling units bldg with zero basements. to include residential support service office, property management office, bike parking, serice space, & residential parking with puzzle lift and pit stacker system. (100% affordable housing) mayor dir 13-01. | $50,000,000 |
| Apr 13, 2022 | Completed final sign-off Aug 2022 | 595 Mariposa St | Guzman Construction Group Inc. | to obtain final inspection for work approved under bpa#201705176834. all work complete.Details
to obtain final inspection for work approved under bpa#201705176834. all work complete. | |
| Apr 13, 2022 | Never finaled issued Apr 2022, no final | 1100 Ellis St | Guzman Construction Group Inc. | to obtain final inspection for work approved under bpa#201805118869. all work complete.Details
to obtain final inspection for work approved under bpa#201805118869. all work complete. | |
| Mar 24, 2022 | Completed final sign-off Aug 2022 | 600 07th St | Guzman Construction Group Inc. | torque down piles- indicator/test piles reference site pa# 2020-1019-6871Details
torque down piles- indicator/test piles reference site pa# 2020-1019-6871 | $100,000 |
| Dec 9, 2021 | Completed final sign-off Feb 2022 | 885 Folsom St | Guzman Construction Group Inc. | new stair in e 2 story type vb building per approved permit 202011199331Details
new stair in e 2 story type vb building per approved permit 202011199331 | $15,000 |
| Nov 24, 2021 | Never finaled issued Dec 2021, no final | 885 Folsom St | Guzman Construction Group Inc. | rev to pa# 2020-1119-9331: vertical platfom lift deleted from scope of work, kitchenette relocated to level 01, configuring area located to level 02, offices relocated on levels 01 and 02 access to patio via sliding door, one step added between level 01 entry lobby and office areas, ramp elongatedDetails
rev to pa# 2020-1119-9331: vertical platfom lift deleted from scope of work, kitchenette relocated to level 01, configuring area located to level 02, offices relocated on levels 01 and 02 access to patio via sliding door, one step added between level 01 entry lobby and office areas, ramp elongated | |
| Oct 13, 2021 | Completed final sign-off Oct 2023 | 4101 Noriega St | Guzman Construction Group Inc. | full rehab of units and small community room w/ kitchenette and toilet room. new windows, and doors throughout, new exterior finishes, new fixtures, appliances and mechanical equipment. no work in public right of way. partially sprinklered. fire alarm under deferred submittal. 100% affordableDetails
full rehab of units and small community room w/ kitchenette and toilet room. new windows, and doors throughout, new exterior finishes, new fixtures, appliances and mechanical equipment. no work in public right of way. partially sprinklered. fire alarm under deferred submittal. 100% affordable | $6,670,000 |
| Sep 27, 2021 | Completed final sign-off Sep 2023 | 2206 Great Hy | Guzman Construction Group Inc. | priority processing: 100% affordable housing. rehabilitation of 6 public housing town homes in south building: units 2243, 2252, 2253, 2260, 2263, 2268. windows and doors to be replaced throughout, (n) roofing, exterior finishes, fixtures & appliances. (n) mep fixtures. repair central carport.Details
priority processing: 100% affordable housing. rehabilitation of 6 public housing town homes in south building: units 2243, 2252, 2253, 2260, 2263, 2268. windows and doors to be replaced throughout, (n) roofing, exterior finishes, fixtures & appliances. (n) mep fixtures. repair central carport. | $5,000,000 |
| Sep 27, 2021 | Completed final sign-off Sep 2023 | 2206 Great Hy | Guzman Construction Group Inc. | priority processing: 100% affordable housing. rehabilitation of 10 public housing in north bldg: units 2206, 2210, 2215, 2217, 2020, 2222, 2225, 2227, 2228, 2232. replace windows & doors throughout. (n) roof, exterior finishes, fixtures & appliances. (n) mep fixtures. replace north carport in kind.Details
priority processing: 100% affordable housing. rehabilitation of 10 public housing in north bldg: units 2206, 2210, 2215, 2217, 2020, 2222, 2225, 2227, 2228, 2232. replace windows & doors throughout. (n) roof, exterior finishes, fixtures & appliances. (n) mep fixtures. replace north carport in kind. | $6,000,000 |
| Sep 23, 2021 | Completed final sign-off Apr 2022 | 343 08th St | Guzman Construction Group Inc. | dbi review of t 24 tco exception associated with 201707121715Details
dbi review of t 24 tco exception associated with 201707121715 | |
| Aug 26, 2021 | Completed final sign-off Apr 2022 | 345 08th St | Guzman Construction Group Inc. | to obtain a final inspection for work approved under previous permit application 201902132830. all work is completeDetails
to obtain a final inspection for work approved under previous permit application 201902132830. all work is complete | |
| Jul 6, 2021 | Completed final sign-off Aug 2023 | 200 Randolph St | Guzman Construction Group Inc. | priority 100% affordable housing. bldg a:2 of 3 structures. proposed rehabilitation of 10 of 16 public housing apts. replacement of cement plaster cladding, new windows & roofing. rearragement of int. walls at 1 mobility unit. related bldg permits: bldg b pa#202107063835; bldg c pa#202103237113.Details
priority 100% affordable housing. bldg a:2 of 3 structures. proposed rehabilitation of 10 of 16 public housing apts. replacement of cement plaster cladding, new windows & roofing. rearragement of int. walls at 1 mobility unit. related bldg permits: bldg b pa#202107063835; bldg c pa#202103237113. | $3,000,000 |
| Jul 6, 2021 | Completed final sign-off Aug 2023 | 200 Randolph St | Guzman Construction Group Inc. | priority 100% affordable housing. bldg b:3 of 3 structures. proposed rehabilitation of 6 of 16 public housing apts, replacement of cement plaster cladding, new windows & roofing. related bldg permits: bldg a pa# 202107063834; bldg c pa#202103237113.Details
priority 100% affordable housing. bldg b:3 of 3 structures. proposed rehabilitation of 6 of 16 public housing apts, replacement of cement plaster cladding, new windows & roofing. related bldg permits: bldg a pa# 202107063834; bldg c pa#202103237113. | $3,000,000 |