Mark Hale
- Listed as
- engineer
- Firm
- Charlile Macy
- Based in
- Santa Rosa
- On San Francisco permits
- Dec 2010 to Jul 2026
7 permits since 2000 (engineer on 7 permits): 5 completed, 2 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 30, 2026 | In progress issued Aug 2026 | 700 Missouri St | Guzman Construction Group Inc. | post demolition installation of permanent fence to protect remaining site. ref potrero hope phase 3 demolition 202604038875, fence not to impead on public access.Details
post demolition installation of permanent fence to protect remaining site. ref potrero hope phase 3 demolition 202604038875, fence not to impead on public access. | $160,000 |
| Sep 3, 2025 | In progress issued Apr 2026 | 700 Missouri St | Guzman Construction Group Inc. | building c-7: demolition of a type-v, 2-story, 8 unit residential apt building.Details
building c-7: demolition of a type-v, 2-story, 8 unit residential apt building. | $35,000 |
| Aug 18, 2022 | Completed final sign-off Feb 2024 | 1620 25th St | Cahill Contractors Llc. | construction of a half-court baseketball court on grade on the north side residential building 1620 25th street & east of 1700 25th street off of 25th street within the potrero sfha bounderies.Details
construction of a half-court baseketball court on grade on the north side residential building 1620 25th street & east of 1700 25th street off of 25th street within the potrero sfha bounderies. | $150,000 |
| Mar 17, 2016 | Completed final sign-off Oct 2019 | 1101 Connecticut St | Cahill Const Service Inc, Value Fire Protection Inc, Fire Detection Unlimited, Errc Systems Inc (Former Dishnet Direct) | erect 5 story, 1 basement, 72 units, 100% affordable housing, located on two lots, 001a & 007.Details
erect 5 story, 1 basement, 72 units, 100% affordable housing, located on two lots, 001a & 007. | $21,800,000 |
| Dec 17, 2010 | Completed final sign-off Apr 2014 | 1 Cashmere St | Cahill-Nibbi Joint Venture | grading (on 3 legal parcels) for construction of an accessible pedestrian walkway between the non hunters view development and the existing cashmere constr.Details
grading (on 3 legal parcels) for construction of an accessible pedestrian walkway between the non hunters view development and the existing cashmere constr. | $40,000 |
| Dec 17, 2010 | Completed final sign-off Apr 2014 | 1 Cashmere St | Cahill-Nibbi Joint Venture | grading (on 3 legal parcels) for construction of an accessible pedestrian walkway between the non hunters view development and the existing cashmere constr.Details
grading (on 3 legal parcels) for construction of an accessible pedestrian walkway between the non hunters view development and the existing cashmere constr. | $40,000 |
| Dec 17, 2010 | Completed final sign-off Apr 2014 | 98 West Point Rd | Cahill-Nibbi Joint Venture | grading (on 3 legal parcels) for construction of an accessible pedestrian walkway between the non hunters view development and the existing cashmere constr.Details
grading (on 3 legal parcels) for construction of an accessible pedestrian walkway between the non hunters view development and the existing cashmere constr. | $40,000 |