Permit GraphShortlistSan Francisco building permits since 2000

Block 3995, lot 022

595 Mariposa St

City’s use
Multi-Family Residential
Built
2019
Stories
5
Units
20
Building
25,000 sq ft
Lot
3,705 sq ft
Zoning
UMU
Construction type
NA

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

22 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 13, 2022Completed
final sign-off Aug 2022
595 Mariposa StGuzman Construction Group Inc.to obtain final inspection for work approved under bpa#201705176834. all work complete.
Details
Permit
202204132121
Permit issued
Apr 13, 2022
Final sign-off
Aug 18, 2022

to obtain final inspection for work approved under bpa#201705176834. all work complete.

Open the permit page

May 27, 2021Never finaled
issued Jul 2021, no final
601 Tennessee Sterrcs upgrade - revision to pa #2015-0806-3607-s6 1. reprogram frequencies per ccsf dt 2. replace rooftop yagi antenna 3. re-test errcs per ab #2.04 2019 4. coordinate inspections w/ccsf dt & sffd
Details
Permit
202105271228
Permit issued
Jul 22, 2021

errcs upgrade - revision to pa #2015-0806-3607-s6 1. reprogram frequencies per ccsf dt 2. replace rooftop yagi antenna 3. re-test errcs per ab #2.04 2019 4. coordinate inspections w/ccsf dt & sffd

Open the permit page

Apr 15, 2019Never finaled
issued Apr 2019, no final
595 Mariposa Ststrret space
Details
Permit
M1066127
Permit issued
Apr 15, 2019

strret space

Open the permit page

Apr 11, 2019Never finaled
filed Apr 2019, never issued
595 Mariposa Ststreet space
Details
Permit
M1064547

street space

Open the permit page

Mar 18, 2019Completed
final sign-off Jun 2019
595 Mariposa StGuzman Construction Group Inc.as built revision to 201508063607 s6. antennas removed on floors 3 and 4, the floors passed coverage test
Details
Permit
201903185451
Permit issued
Mar 18, 2019
Final sign-off
Jun 14, 2019

as built revision to 201508063607 s6. antennas removed on floors 3 and 4, the floors passed coverage test

Open the permit page

Feb 22, 2019Never finaled
issued Feb 2019, no final
595 Mariposa Ststreet space
Details
Permit
M1042407
Permit issued
Feb 22, 2019

street space

Open the permit page

Feb 20, 2019Never finaled
issued Feb 2019, no final
595 Mariposa StMadden Plumbing, Llcremove 1 sprinkler head in elevator control room. ref 201704285141 maher na
Details
Permit
201902203420
Permit issued
Feb 20, 2019

remove 1 sprinkler head in elevator control room. ref 201704285141 maher na

Open the permit page

$250
Jan 31, 2019Completed
final sign-off Aug 2022
595 Mariposa StGuzman Construction Group Inc.revision to pa 2015-0806-3607 s3 to add elevator shaft access door
Details
Permit
201901311764
Permit issued
Feb 1, 2019
Final sign-off
Aug 18, 2022

revision to pa 2015-0806-3607 s3 to add elevator shaft access door

Open the permit page

Dec 13, 2018Never finaled
issued Dec 2018, no final
595 Mariposa Ststreet space
Details
Permit
M1017247
Permit issued
Dec 13, 2018

street space

Open the permit page

Sep 14, 2018Never finaled
issued Sep 2018, no final
595 Mariposa Ststreet space
Details
Permit
M979387
Permit issued
Sep 14, 2018

street space

Open the permit page

Sep 10, 2018Completed
final sign-off Aug 2022
595 Mariposa Strevision to pa 201508063607 addendum 3 door size to bike room. unit 103: winder stairs, fancoil unit relocated to soffit, unit 102 bath exhaust, gas bbq on roof deck & fire rated shafts as indicated
Details
Permit
201809109560
Permit issued
Sep 28, 2018
Final sign-off
Aug 18, 2022

revision to pa 201508063607 addendum 3 door size to bike room. unit 103: winder stairs, fancoil unit relocated to soffit, unit 102 bath exhaust, gas bbq on roof deck & fire rated shafts as indicated

Open the permit page

Aug 22, 2018Completed
final sign-off Sep 2022
601 Tennessee StGarnett Signs Llcinstall 10 evac signs
Details
Permit
201808227975
Permit issued
Aug 22, 2018
Final sign-off
Sep 2, 2022

install 10 evac signs

Open the permit page

$6,000
Aug 15, 2018Never finaled
issued Aug 2018, no final
593 Mariposa Stper pa #201508063607, add address to block 3995, lot 022 as; 601 tennessee street, 593, 597. 599 mariposa street.
Details
Permit
M964787
Permit issued
Aug 15, 2018

per pa #201508063607, add address to block 3995, lot 022 as; 601 tennessee street, 593, 597. 599 mariposa street.

Open the permit page

Jun 22, 2018Never finaled
issued Jun 2018, no final
595 Mariposa Ststreet space permit - renewal of permit # m842087
Details
Permit
M943407
Permit issued
Jun 25, 2018

street space permit - renewal of permit # m842087

Open the permit page

May 24, 2018Completed
final sign-off Mar 2022
595 Mariposa StAllcom Electric Inc.ref# 2015008063607; fire alarm & 2 way commuincators n/a maher
Details
Permit
201805240113
Final sign-off
Mar 29, 2022

ref# 2015008063607; fire alarm & 2 way commuincators n/a maher

Open the permit page

$87,000
Nov 28, 2017Never finaled
issued Dec 2017, no final
595 Mariposa Ststreet space permit - renewal of permit #m842087
Details
Permit
M859387
Permit issued
Dec 8, 2017

street space permit - renewal of permit #m842087

Open the permit page

Oct 10, 2017Never finaled
issued Oct 2017, no final
595 Mariposa Ststreet space
Details
Permit
M842087
Permit issued
Oct 10, 2017

street space

Open the permit page

Oct 10, 2017Never finaled
issued Oct 2017, no final
595 Mariposa Ststreet space
Details
Permit
M841967
Permit issued
Oct 10, 2017

street space

Open the permit page

May 17, 2017Expired or cancelled
expired Aug 2022
595 Mariposa StGuzman Construction Group Inc.revision to addenda 1 of 201508063607. foundation revisionr along south property line. mat slab revised be supported on drilled & cat-in-place concrete pier along southern property line
Details
Permit
201705176834
Permit issued
Jul 12, 2017

revision to addenda 1 of 201508063607. foundation revisionr along south property line. mat slab revised be supported on drilled & cat-in-place concrete pier along southern property line

Open the permit page

$40,000
Apr 28, 2017Completed
final sign-off Aug 2019
595 Mariposa StMadden Plumbing, Llcinstall (261) new fire sprinklers for entire building per nfpa 13, wet stand pipe per nfpa 14 & underground per nfpa 24', ref bldg pa #201508063607s/r-2.
Details
Permit
201704285141
Permit issued
Apr 28, 2017
Final sign-off
Aug 15, 2019

install (261) new fire sprinklers for entire building per nfpa 13, wet stand pipe per nfpa 14 & underground per nfpa 24', ref bldg pa #201508063607s/r-2.

Open the permit page

$80,000
Mar 7, 2017Never finaled
filed Mar 2017, never issued
595 Mariposa Ststreet space
Details
Permit
M766487

street space

Open the permit page

Aug 6, 2015Completed
final sign-off Aug 2022
595 Mariposa StGuzman Construction Group Inc., Bcci Construction Companyto erect 5 stories, type va over i, no basement, 20 units residential building. future address of 601 tennessee. maher compliance required.
Details
Permit
201508063607
Permit issued
Jan 26, 2017
Final sign-off
Aug 18, 2022

to erect 5 stories, type va over i, no basement, 20 units residential building. future address of 601 tennessee. maher compliance required.

Open the permit page

$2,513,550

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Guzman Construction Group Inc. (5), Madden Plumbing, Llc (2), Allcom Electric Inc., Bcci Construction Company, Garnett Signs Llc
Architects
Riyad Ghannam (3), David Strandberg
Engineers
David Strandberg
Authorized agents
Ryan Pine
Pmt consultant/expediters
Mike Scribner

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.