Block 1075, lot 001
2434 Post St
- City’s use
- Multi-Family Residential
- Built
- 1943
- Stories
- 3
- Units
- 136
- Lot
- 113,434 sq ft
- Zoning
- RM1
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
37 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 21, 2025 | Completed final sign-off Sep 2025 | 1525 Broderick St | Lindquist Custom Construction Inc | replace cracked and damaged concrete at parking lot (private) and driveway in kind. 4100sf.Details
replace cracked and damaged concrete at parking lot (private) and driveway in kind. 4100sf. | $30,000 |
| Nov 8, 2018 | Completed final sign-off Nov 2018 | 1501 Broderick St | International Fire Inc | due to interior remodel in basement area for day care space, new notification appliance initiating devices will be for complete coverage and tie in to existing control panel in elec room ti 201411030516, 201807275718Details
due to interior remodel in basement area for day care space, new notification appliance initiating devices will be for complete coverage and tie in to existing control panel in elec room ti 201411030516, 201807275718 | $6,500 |
| Nov 8, 2018 | Completed final sign-off Nov 2018 | 2545 Sutter St | International Fire Inc | as built ti 201805159164. revised notification devices placement due to relcatocation of ada unit 226 to 2nd fl to tie in to ec control panelDetails
as built ti 201805159164. revised notification devices placement due to relcatocation of ada unit 226 to 2nd fl to tie in to ec control panel | |
| Aug 22, 2018 | Never finaled issued Aug 2018, no final | 2511 Sutter St | street spaceDetails
street space | ||
| Aug 17, 2018 | Never finaled issued Aug 2018, no final | 1400 Baker St | street spaceDetails
street space | ||
| Jul 27, 2018 | Never finaled issued Jul 2018, no final | 2511 Sutter St | International Fire Inc | as builts for 201804247200 remove sprinkler bell from matrix, not exist. change devices to low freq sounder in standard )not ada) room #131 maher naDetails
as builts for 201804247200 remove sprinkler bell from matrix, not exist. change devices to low freq sounder in standard )not ada) room #131 maher na | $1,000 |
| Jul 27, 2018 | Completed final sign-off Nov 2018 | 1501 Broderick St | International Fire Inc | installation of fire alarm ststem w/new control panel, smk det, pull stations, radio communicator. low greq sounders in every unit, monitor module to tie-in to (e) flow switch to new panel ref 201511051905 maher naDetails
installation of fire alarm ststem w/new control panel, smk det, pull stations, radio communicator. low greq sounders in every unit, monitor module to tie-in to (e) flow switch to new panel ref 201511051905 maher na | $30,000 |
| May 16, 2018 | Never finaled issued May 2018, no final | 2511 Sutter St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| May 15, 2018 | Never finaled issued Jul 2018, no final | 2545 Sutter St | International Fire Inc | installation of new fire system with new control panel, radio comm poer supply, pull station at every exit in partly sprk bldg. comb smoke /co detectros with low freq sounder base in every unit. notifications devices in common area monitor mode for flow. 201511051899Details
installation of new fire system with new control panel, radio comm poer supply, pull station at every exit in partly sprk bldg. comb smoke /co detectros with low freq sounder base in every unit. notifications devices in common area monitor mode for flow. 201511051899 | $28,000 |
| May 15, 2018 | Never finaled issued May 2018, no final | 2569 Sutter St | International Fire Inc | as builts to pa 2017-1106-3218 due to interior remodeling in the basement, new strobe & horn/strobe will be installed and tie into existing circuit. remove sprinkler bell. not existing ref pa 2017-0929-9943Details
as builts to pa 2017-1106-3218 due to interior remodeling in the basement, new strobe & horn/strobe will be installed and tie into existing circuit. remove sprinkler bell. not existing ref pa 2017-0929-9943 | |
| May 8, 2018 | Never finaled issued May 2018, no final | 2511 Sutter St | street spaceDetails
street space | ||
| May 4, 2018 | Never finaled issued May 2018, no final | 2557 Sutter St | International Fire Inc | as built 201709016697. relocate devices and control panel to sutter st side. remove sperinker bell from plan, not existDetails
as built 201709016697. relocate devices and control panel to sutter st side. remove sperinker bell from plan, not exist | |
| Apr 24, 2018 | Never finaled issued Apr 2018, no final | 2511 Sutter St | International Fire Inc | installation of new fire alarm system with new control panel. radio communicator power supply in the basment in partly sprinklered bldg. install pull stations at every exists, low frequency sounder in every unit, notifcation devices throuhgout common areas. install monitor modules to tie in sprinkleDetails
installation of new fire alarm system with new control panel. radio communicator power supply in the basment in partly sprinklered bldg. install pull stations at every exists, low frequency sounder in every unit, notifcation devices throuhgout common areas. install monitor modules to tie in sprinkle | $16,000 |
| Apr 24, 2018 | Completed final sign-off Mar 2019 | 1501 Broderick St | Community Playgrounds Inc. | playground renovation only 2415 sf (e) playground - replace playstructures install new surfacing, furnishing, maintenance shed, new hose bibb. located in (e) publically funded housing developmentDetails
playground renovation only 2415 sf (e) playground - replace playstructures install new surfacing, furnishing, maintenance shed, new hose bibb. located in (e) publically funded housing development | $50,000 |
| Apr 6, 2018 | Completed final sign-off Aug 2018 | 2569 Sutter St | Rcm Fire Protection Inc. | modify extg fire sprinkler. ref app#201709299943. n/a for maherDetails
modify extg fire sprinkler. ref app#201709299943. n/a for maher | $8,500 |
| Feb 22, 2018 | Never finaled issued Feb 2018, no final | 2511 Sutter St | street spaceDetails
street space | ||
| Nov 6, 2017 | Never finaled issued Nov 2017, no final | 2569 Sutter St | International Fire Inc | installation of (n) fire control system w/(n) panel, radio communicator & power supply. combination smoke/co detector w/low frequency sounder base will be installed inside every unit install monitor module to tie-in (e) flow switch pa 2015-1105-1901Details
installation of (n) fire control system w/(n) panel, radio communicator & power supply. combination smoke/co detector w/low frequency sounder base will be installed inside every unit install monitor module to tie-in (e) flow switch pa 2015-1105-1901 | $35,000 |
| Nov 2, 2017 | Never finaled issued Nov 2017, no final | 1400 Baker St | Details
| ||
| Sep 29, 2017 | Completed final sign-off Sep 2019 | 2569 Sutter St | Nibbi Bros Assoc Inc. | revision to #2015-11-05-1901. addition of laundry room to existing basement, serviced gy a new accessible ramp. entry will be a new door in an existing window. the dryer ductwork will fend to the exterior wall with new louvered vents in the existing exterior wall. maher n/aDetails
revision to #2015-11-05-1901. addition of laundry room to existing basement, serviced gy a new accessible ramp. entry will be a new door in an existing window. the dryer ductwork will fend to the exterior wall with new louvered vents in the existing exterior wall. maher n/a | |
| Sep 1, 2017 | Never finaled issued Sep 2017, no final | 2557 Sutter St | International Fire Inc | installation of new fire system w/new control unit, readio communicator & power supply. install pull stations at every exit in partly sprinkled bldg combo cmoke det w/lf sounded base will be install in every unit. install monitor module to tie-in exist flow switch. ref #201511051898.Details
installation of new fire system w/new control unit, readio communicator & power supply. install pull stations at every exit in partly sprinkled bldg combo cmoke det w/lf sounded base will be install in every unit. install monitor module to tie-in exist flow switch. ref #201511051898. | $37,000 |
| Sep 1, 2017 | Completed final sign-off Apr 2019 | 2511 Sutter St | Nibbi Bros Assoc Inc. | new 3 bin trash enclosure with accessible path to pneumatic hatch doors. additon of new concrete steps with canopy to access office entrance at bldg off sutter st. various civil site utility improvmentsDetails
new 3 bin trash enclosure with accessible path to pneumatic hatch doors. additon of new concrete steps with canopy to access office entrance at bldg off sutter st. various civil site utility improvments | $60,000 |
| Aug 10, 2017 | Never finaled issued Aug 2017, no final | 2569 Sutter St | street space permit - renewal of permit # m759047Details
street space permit - renewal of permit # m759047 | ||
| Aug 10, 2017 | Never finaled filed Aug 2017, never issued | 2569 Sutter St | street spaceDetails
street space | ||
| Jul 20, 2017 | Never finaled issued Jul 2017, no final | 1400 Baker St | street spaceDetails
street space | ||
| May 2, 2017 | Completed final sign-off Dec 2017 | 1400 Baker St | International Fire Inc | building 3 - installation of new fire alarm system including new fire panel, smoke detector, pull stations, low frequency sounders in all ulnits and monitor module to monitor water flow switch. ref pa 2015-1105-1902Details
building 3 - installation of new fire alarm system including new fire panel, smoke detector, pull stations, low frequency sounders in all ulnits and monitor module to monitor water flow switch. ref pa 2015-1105-1902 | $45,000 |
| Apr 11, 2017 | Expired or cancelled withdrawn Apr 2019 | 1400 Baker St | Nibbi Bros Assoc Inc. | b-3 - revision to pa #201511051902: lounge space is converted to maintenance room & addition of unisex toilet to maintenance room @ b-3 (rad) basement. add exterior door & exhaust louver for bathroom.Details
b-3 - revision to pa #201511051902: lounge space is converted to maintenance room & addition of unisex toilet to maintenance room @ b-3 (rad) basement. add exterior door & exhaust louver for bathroom. | $75,000 |
| Feb 6, 2017 | Never finaled issued Feb 2017, no final | 2569 Sutter St | street spaceDetails
street space | ||
| Nov 5, 2015 | Completed final sign-off Apr 2019 | 1501 Broderick St | Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint, new stand alone trash enclosure. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes. (no work on day care space). add five addresses.Details
rad priority. exterior rehab: roof, windows, paint, new stand alone trash enclosure. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes. (no work on day care space). add five addresses. | $5,200,000 |
| Nov 5, 2015 | Completed final sign-off Apr 2019 | 1400 Baker St | Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. provide stand alone trash enclosure. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes, provide new laundry room .add five addresses.Details
rad priority. exterior rehab: roof, windows, paint. provide stand alone trash enclosure. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes, provide new laundry room .add five addresses. | $5,200,000 |
| Nov 5, 2015 | Completed final sign-off Jun 2019 | 2557 Sutter St | Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical, plumbing, cabinets, fixtures & finishes.add five addresses.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical, plumbing, cabinets, fixtures & finishes.add five addresses. | $4,000,000 |
| Nov 5, 2015 | Completed final sign-off Apr 2019 | 2545 Sutter St | Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes.add five addresses.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes.add five addresses. | $4,000,000 |
| Nov 5, 2015 | Completed final sign-off Jun 2019 | 2511 Sutter St | Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes. add five addresses.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes. add five addresses. | $5,200,000 |
| Nov 5, 2015 | Completed final sign-off Apr 2019 | 2569 Sutter St | Nibbi Bros Assoc Inc. | rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes.add five addresses.Details
rad priority. exterior rehab: roof, windows, paint. interior rehab: hvac, electrical plumbing, cabinets, fixtures & finishes.add five addresses. | $5,200,000 |
| Nov 3, 2014 | Completed final sign-off Feb 2015 | 2400 Post St | ground floor: administrative permit to document the use as a daycare center (e-3).Details
ground floor: administrative permit to document the use as a daycare center (e-3). | ||
| Jan 12, 2002 | Completed final sign-off Dec 2003 | 2400 Post St | disabled access barrier removal upgrade to entrance doors toilet rms kitchen signage elect controlsDetails
disabled access barrier removal upgrade to entrance doors toilet rms kitchen signage elect controls | $90,000 | |
| Jan 8, 2002 | Completed final sign-off Mar 2002 | 2400 Post St | Rivera Construction | remove exist cabinets and replace as exist. no structural changes.Details
remove exist cabinets and replace as exist. no structural changes. | $2,000 |
| Feb 29, 2000 | Expired or cancelled expired Jun 2000 | 1440 Baker St | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- International Fire Inc (11), Nibbi Bros Assoc Inc. (9), Community Playgrounds Inc., Lindquist Custom Construction Inc, Rcm Fire Protection Inc., Rivera Construction
- Architects
- Michelle Sullivan (8), Steve Suzuki
- Engineers
- Christopher James Wood, Stephen Howarter