Rob Moyer
- Listed as
- contractor, engineer
- Firm
- Thermal Mechanical
- Based in
- Santa Clara
- On San Francisco permits
- Jan 2014 to May 2022
4 permits since 2000 (contractor on 2 permits, engineer on 2 permits): 4 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- M C S Construction Services, Truedge Builds Inc
- Architects
- Lee Moulton, Teresa Emery
- Engineers
- Amit Wadhwa (2), Alexander Joseph Pacheco, Barry Mcgraw, Jayson Haines
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 4
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 18, 2022 | Completed final sign-off Sep 2022 | 201 03rd St | M C S Construction Services | 10/f: deferred mep permit. title 24 electrical & mechanical. ref t.i. pa202203180322. maher n/a.Details
10/f: deferred mep permit. title 24 electrical & mechanical. ref t.i. pa202203180322. maher n/a. | |
| Apr 8, 2021 | Completed final sign-off Jan 2022 | 2400 Irving St | Truedge Builds Inc | t.i for the police credit union of ca retail branch. partial demo of an (e) concrete vault, demo of non structural partitions, ceiling, finishes, mep system. construction of new partitions, relocation of post, finishes, mep. ext. work includes restoration of infill at 2nd access and install atm.Details
t.i for the police credit union of ca retail branch. partial demo of an (e) concrete vault, demo of non structural partitions, ceiling, finishes, mep system. construction of new partitions, relocation of post, finishes, mep. ext. work includes restoration of infill at 2nd access and install atm. | $1,259,550 |
| Oct 24, 2020 | Completed final sign-off Dec 2021 | 150 Spear St | Thermal Mechanical | mechanical penthouse: cooling tower replacment. new sand filter, ew piping to serve cooling tower. 1 new heat exhanger. power for mechanical. maher n/aDetails
mechanical penthouse: cooling tower replacment. new sand filter, ew piping to serve cooling tower. 1 new heat exhanger. power for mechanical. maher n/a | $750,000 |
| Jan 10, 2014 | Completed final sign-off Oct 2015 | 150 Spear St | Thermal Mechanical | replace 1 cooling tower at roof of buildingDetails
replace 1 cooling tower at roof of building | $1,000,000 |