L. Kam Lee
- Listed as
- architect, engineer
- Firm
- Marshall Lee Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2010 to Dec 2019
13 permits since 2000 (architect on 12 permits, engineer on 1 permit): 7 completed, 2 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 5, 2019 | Expired or cancelled cancelled Nov 2024 | 2543 Post St | additon of (2) accessory dwelling units per ord# 162-16.Details
additon of (2) accessory dwelling units per ord# 162-16. | $100,000 | |
| Dec 5, 2019 | Expired or cancelled cancelled Nov 2024 | 2539 Post St | additon of (2) accessory studio dwelling units per ord# 162-16.Details
additon of (2) accessory studio dwelling units per ord# 162-16. | $100,000 | |
| Oct 24, 2019 | Never finaled filed Oct 2019, never issued | 115 Haight St | addition of adu per ord #162-16. new windows, heating system, plumbing fixtures, lighting & electrical.Details
addition of adu per ord #162-16. new windows, heating system, plumbing fixtures, lighting & electrical. | $75,000 | |
| Jun 4, 2018 | Completed final sign-off Sep 2024 | 3139 Mission St | change of use medical to cannabis retail. adult use. administrative permit only for planning dept purposes only. no work under this permit.Details
change of use medical to cannabis retail. adult use. administrative permit only for planning dept purposes only. no work under this permit. | $100 | |
| Feb 2, 2018 | Completed final sign-off Dec 2020 | 306 Pope St | Velox Construction | alterations to ground floor: add afull bathroom conditioned space.Details
alterations to ground floor: add afull bathroom conditioned space. | $60,000 |
| Apr 17, 2017 | Expired or cancelled cancelled Feb 2020 | 2680 Lombard St | fire separation, new gypboard finish, hvac, new water heater, new exhaust fans, sprinkler system. to comply with nov 20164835 to legalize third dwelling unitDetails
fire separation, new gypboard finish, hvac, new water heater, new exhaust fans, sprinkler system. to comply with nov 20164835 to legalize third dwelling unit | $53,500 | |
| May 4, 2016 | Expired or cancelled withdrawn Jun 2016 | 2001 37th Av | remodel (e) men & women's restrooms, provide accessible plumbing fixtures & accessories, signageDetails
remodel (e) men & women's restrooms, provide accessible plumbing fixtures & accessories, signage | $8,000 | |
| Mar 29, 2016 | Completed final sign-off Apr 2016 | 902 Divisadero St | Theodore Design & Constr | apt.#103 - comply w/nov #200845194 & nov #200736290 - return deck to open space, remove any walls or window above 48".Details
apt.#103 - comply w/nov #200845194 & nov #200736290 - return deck to open space, remove any walls or window above 48". | $1,000 |
| Jun 29, 2015 | Completed final sign-off Apr 2016 | 148 Sanchez St | K & M Construction | remodel of existing kitchen and bathroom, add a second bathroom; maher n/aDetails
remodel of existing kitchen and bathroom, add a second bathroom; maher n/a | $25,000 |
| Nov 24, 2014 | Completed final sign-off Apr 2015 | 2340 Irving St | Mac Construction | suite 106: soft demolition, no structural work, interior only.Details
suite 106: soft demolition, no structural work, interior only. | $1,400 |
| May 20, 2014 | Completed final sign-off Aug 2015 | 2001 37th Av | Plant Construction Company Lp | soft demolition, interior per ab-017. t.i. under seperate permit. no structural work, bldg to remain vacant during demolition /ab-017 work.Details
soft demolition, interior per ab-017. t.i. under seperate permit. no structural work, bldg to remain vacant during demolition /ab-017 work. | $30,000 |
| Apr 3, 2014 | Never finaled issued Jul 2014, no final | 2001 37th Av | Plant Construction Company Lp | seismic retrofit to existing buildings.Details
seismic retrofit to existing buildings. | $1,100,000 |
| Dec 30, 2010 | Completed final sign-off Mar 2012 | 3139 Mission St | alteration of medical office building to medical cannabis dispensary. establish a new medical cannabis dispensary and coffee shop. establish a new medical cannabis dispensary.Details
alteration of medical office building to medical cannabis dispensary. establish a new medical cannabis dispensary and coffee shop. establish a new medical cannabis dispensary. | $85,000 |