Pamela Kurz
- License
- C26177
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Perkins - Eastman
- Based in
- Sf
- On San Francisco permits
- Dec 2019 to Jan 2025
3 permits since 2000 (architect on 3 permits): 2 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- E & C Builders Inc (2), Novo Construction Inc
- Engineers
- Christopher Jordan Malabed, Stephen Shaffer
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 6, 2025 | Completed final sign-off Jun 2025 | 221 Main St | Novo Construction Inc | 16th floor: partial floor and ceiling demolition of existing tenant space. new interior partitios, ceilings, and finishes. mechanical and electrical work included.Details
16th floor: partial floor and ceiling demolition of existing tenant space. new interior partitios, ceilings, and finishes. mechanical and electrical work included. | $1,086,562 |
| Apr 17, 2023 | Completed final sign-off Jul 2026 | 940 Sutter St | E & C Builders Inc | in-kind window replacement, remove existing aluminum windows in guest rooms from north elevation lvls 1-8 and interior court yard elevations lvls 2-8, no increase in sqft, no change to egress. 125 windows totalDetails
in-kind window replacement, remove existing aluminum windows in guest rooms from north elevation lvls 1-8 and interior court yard elevations lvls 2-8, no increase in sqft, no change to egress. 125 windows total | $40,000 |
| Dec 31, 2019 | Never finaled issued Aug 2023, no final | 940 Sutter St | E & C Builders Inc | renovation of the extg vertigo hotel. work is being done to floors 1-2 only. renovations on level, include to lobby/reception area, moving fitness center to new location. adjusting small office space and adding a small kitchen. the level 2 renovations include coverting guestroom to lounge.Details
renovation of the extg vertigo hotel. work is being done to floors 1-2 only. renovations on level, include to lobby/reception area, moving fitness center to new location. adjusting small office space and adding a small kitchen. the level 2 renovations include coverting guestroom to lounge. | $75,000 |