Brandon M Socha
- License
- C42123
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Feb 2026 to Nov 2026
4 permits since 2000 (architect on 4 permits): 1 completed, 3 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Gci, Inc (2), Metcon Ti, Inc
- Engineers
- Aaron J. Strauch, Thomas L. Bevans
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 10, 2026 | In progress filed Nov 2026, not yet issued | 131 Steuart St | Metcon Ti, Inc | construction within the interior of an existing office space. limited demo includes: interior non -gearing partiton walls/doors, ceilings, interior finishes, lighting/hvac/plumbing, new construction includes: interior non bearing partition walls and doors, ceiings, interior finishes, lighting, hvac,Details
construction within the interior of an existing office space. limited demo includes: interior non -gearing partiton walls/doors, ceilings, interior finishes, lighting/hvac/plumbing, new construction includes: interior non bearing partition walls and doors, ceiings, interior finishes, lighting, hvac, | $165,000 |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 405 Howard St | ti of interior space on the 7th floor, demo of entire suite,build two new comference rooms.Details
ti of interior space on the 7th floor, demo of entire suite,build two new comference rooms. | $60,000 | |
| Mar 12, 2026 | In progress issued Apr 2026 | 221 Main St | Gci, Inc | 12th fl - interior ti in an existing building new construction of new partitions, case work & mep upgrades; millwork on 12th flDetails
12th fl - interior ti in an existing building new construction of new partitions, case work & mep upgrades; millwork on 12th fl | $3,500,000 |
| Feb 25, 2026 | Completed final sign-off Sep 2026 | 221 Main St | Gci, Inc | ste 1200 interior demo only - tenant readiness. ab-017 appliesDetails
ste 1200 interior demo only - tenant readiness. ab-017 applies | $78,000 |