Bryce C B Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Feb 2007 to Jun 2026
- Last 24 months
- 4 permits filed
69 permits since 2000: 60 completed, 2 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
13 stairs permits: 13 completed. Typically 261 days from filing to permit and 370 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 23, 2025 | Completed final sign-off Jul 2026 | 2948 Bush St | revision to approved pa# 2023-1026-9591. replacement of rear spiral staircase with a deck and straight flight of stairs to the backyard. changes to windows & door schedules.Details
revision to approved pa# 2023-1026-9591. replacement of rear spiral staircase with a deck and straight flight of stairs to the backyard. changes to windows & door schedules. | |
| Oct 15, 2024 | Completed final sign-off Dec 2025 | 211 03rd Av | revision to pa # 2019-0912-1452 s1 r1 including revising stair stringer layout and size at stair btwn 2nd & 3rd fl.Details
revision to pa # 2019-0912-1452 s1 r1 including revising stair stringer layout and size at stair btwn 2nd & 3rd fl. | $15,000 |
| Oct 26, 2023 | Completed final sign-off Jul 2026 | 2948 Bush St | remodle 3-story sfh w/ (n) bay @ front & rear @ 3rd flr. 1st flr- remove spiral stairs & relocate (n) stairs.replace family rm & bath & mudrm w/ access to modified entry/foler. 2nd flr-remove fireplace & bay window @ south,extend (e) flr to north wall,relocate stairs & (e) powder rm.3rd flr-expand..Details
remodle 3-story sfh w/ (n) bay @ front & rear @ 3rd flr. 1st flr- remove spiral stairs & relocate (n) stairs.replace family rm & bath & mudrm w/ access to modified entry/foler. 2nd flr-remove fireplace & bay window @ south,extend (e) flr to north wall,relocate stairs & (e) powder rm.3rd flr-expand.. | $777,663 |
| Mar 1, 2022 | Completed final sign-off Aug 2024 | 465 38th Av | existing rear staircase to be re-configured. new bathroom at garage floor. new garage area.Details
existing rear staircase to be re-configured. new bathroom at garage floor. new garage area. | $70,000 |
| Aug 4, 2021 | Completed final sign-off Feb 2023 | 1931 23rd St | alteration of stairs renovation project is a remodel of ground fl. and lowr fl. with no change to sq of the house including interior work with relocation of the kitchen on groud fl. and laundry on the lower fl. additon of bathroom on the lowr fl. (e) window/door to be replaced lower fl. onDetails
alteration of stairs renovation project is a remodel of ground fl. and lowr fl. with no change to sq of the house including interior work with relocation of the kitchen on groud fl. and laundry on the lower fl. additon of bathroom on the lowr fl. (e) window/door to be replaced lower fl. on | $900,000 |
| Oct 21, 2020 | Completed final sign-off Nov 2022 | 182 Andover St | replace all vinyl windows in (e) oepnings.englarge wdw in (e) locations non-visible.new skylight in bdrm,remove deck&stairs outside master bdrm,relace ext doors,new closet doors in bdrm,interior remodel of bath,new fixtures, and new landscaping & fence backyard.Details
replace all vinyl windows in (e) oepnings.englarge wdw in (e) locations non-visible.new skylight in bdrm,remove deck&stairs outside master bdrm,relace ext doors,new closet doors in bdrm,interior remodel of bath,new fixtures, and new landscaping & fence backyard. | $56,500 |
| Apr 4, 2016 | Completed final sign-off Mar 2018 | 945 14th St | remodel & extend the (e) ground floor rear deck. remove, reconstructe & extend the (e) 2nd floor rear deck. construct new stairs between the 2 decks.Details
remodel & extend the (e) ground floor rear deck. remove, reconstructe & extend the (e) 2nd floor rear deck. construct new stairs between the 2 decks. | $30,000 |
| Feb 22, 2016 | Completed final sign-off May 2017 | 575 28th St | remove exterior spiral stair from 3rd flr rear deck to grade. replace with a fire escape balcony & inclined ladder from 3rd flr deck to second flr deck. and new exterior wood stair from 2nd flr deck to grade.Details
remove exterior spiral stair from 3rd flr rear deck to grade. replace with a fire escape balcony & inclined ladder from 3rd flr deck to second flr deck. and new exterior wood stair from 2nd flr deck to grade. | $30,000 |
| Oct 17, 2014 | Completed final sign-off Feb 2022 | 1 Southern Heights Av | renovation of single family. remodel of living, family, baths & 2nd fl bedrooms. relocate kitchen & dining room to ground floor. addition of entry powder room. new interior stair. remodel 3rd fl master bedrm & bath. new office expansion @ 3r fl with new rear deck. new roof deck with stair penthouse.Details
renovation of single family. remodel of living, family, baths & 2nd fl bedrooms. relocate kitchen & dining room to ground floor. addition of entry powder room. new interior stair. remodel 3rd fl master bedrm & bath. new office expansion @ 3r fl with new rear deck. new roof deck with stair penthouse. | $296,099 |
| Feb 5, 2014 | Completed final sign-off Apr 2016 | 687 28th St | (n)2-story addition to rear&(n)3rd fl addition.(n)3rd fl roof deck.(n)habitable space on grd fl-(n)int stair,(n)bath,(n)bedrm. exterior remodel-(n) windows&doorsin (e)&(n)openings&(n)finishes-full interior remodel thruout, incl(n) casework, fixtures&finishes-(n)street tree in(n) sidewalk planter.Details
(n)2-story addition to rear&(n)3rd fl addition.(n)3rd fl roof deck.(n)habitable space on grd fl-(n)int stair,(n)bath,(n)bedrm. exterior remodel-(n) windows&doorsin (e)&(n)openings&(n)finishes-full interior remodel thruout, incl(n) casework, fixtures&finishes-(n)street tree in(n) sidewalk planter. | $339,470 |
| Oct 13, 2010 | Completed final sign-off Aug 2011 | 133 09th Av | unit #133-interior remodel/structural upgrd, convert part of 1st fl garage to conditioned habitable space-new bedrm, bathrm, den, study. addition of new internal stairs between 1st & 2nd flrs, partial infill of (e) lightwell, remodel (e) kitchen, bathrm, powder rm, bedrms, closets & relocate (e) lauDetails
unit #133-interior remodel/structural upgrd, convert part of 1st fl garage to conditioned habitable space-new bedrm, bathrm, den, study. addition of new internal stairs between 1st & 2nd flrs, partial infill of (e) lightwell, remodel (e) kitchen, bathrm, powder rm, bedrms, closets & relocate (e) lau | $100,000 |
| Dec 3, 2009 | Completed final sign-off Oct 2010 | 1795 Sanchez St | interior remodel including replacement of 2nd floor bath & add 1 new full bathroom on 3rd floor, new stairs from 2nd floor to 1st floor. new kitchen - relocation of kitchen.Details
interior remodel including replacement of 2nd floor bath & add 1 new full bathroom on 3rd floor, new stairs from 2nd floor to 1st floor. new kitchen - relocation of kitchen. | $60,000 |
| Sep 26, 2007 | Completed final sign-off Feb 2009 | 2199 Mission St | replace 2nd restore store front in original openings, add accessible bathroom,replace non conforming bathroom, add coutner and cafe equipment,remodel storage mezzanine, replace exist stair to mezzanine, interior surfaces,mechanical & fire safety under seperate permit.Details
replace 2nd restore store front in original openings, add accessible bathroom,replace non conforming bathroom, add coutner and cafe equipment,remodel storage mezzanine, replace exist stair to mezzanine, interior surfaces,mechanical & fire safety under seperate permit. | $50,000 |