Back to kitchen remodel contractors
Bryce C B Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Feb 2007 to Jun 2026
- Last 24 months
- 4 permits filed
69 permits since 2000: 60 completed, 2 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 15 completed, 1 in progress. Typically 42 days from filing to permit and 245 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2025 | In progress issued Dec 2025 | 3500 21st St | 1/fl- excavation and conversion of non habitiable space to conditioned habitable space. addition of (n) bedroom, laundry room, and office. minor remodel to (e) kitchen and living room at 2/fl. remodel (e) primary closet and (e) office on 3/fl. install (n) skylight in modified roof framing.Details
1/fl- excavation and conversion of non habitiable space to conditioned habitable space. addition of (n) bedroom, laundry room, and office. minor remodel to (e) kitchen and living room at 2/fl. remodel (e) primary closet and (e) office on 3/fl. install (n) skylight in modified roof framing. | $257,293 |
| Oct 10, 2023 | Completed final sign-off Jul 2024 | 465 38th Av | voluntary foundation improvements and seismic strengthening. add anchor bolts + plywood wall at garage. increase ceiling height at e utility space bby lowering slab and add paritions to separate it from kitchenDetails
voluntary foundation improvements and seismic strengthening. add anchor bolts + plywood wall at garage. increase ceiling height at e utility space bby lowering slab and add paritions to separate it from kitchen | $16,000 |
| Aug 4, 2021 | Completed final sign-off Feb 2023 | 1931 23rd St | alteration of stairs renovation project is a remodel of ground fl. and lowr fl. with no change to sq of the house including interior work with relocation of the kitchen on groud fl. and laundry on the lower fl. additon of bathroom on the lowr fl. (e) window/door to be replaced lower fl. onDetails
alteration of stairs renovation project is a remodel of ground fl. and lowr fl. with no change to sq of the house including interior work with relocation of the kitchen on groud fl. and laundry on the lower fl. additon of bathroom on the lowr fl. (e) window/door to be replaced lower fl. on | $900,000 |
| Jul 9, 2021 | Completed final sign-off Feb 2022 | 2070 Beach St | remodel kitchen and (2) bathrooms, new appliances, new fixturesDetails
remodel kitchen and (2) bathrooms, new appliances, new fixtures | $200,000 |
| Sep 26, 2020 | Completed final sign-off Dec 2021 | 330 Roosevelt Wy | interiro remodel of kitchen & dining room. (n) doors facing east side yard & replace in-kind window @ westside.Details
interiro remodel of kitchen & dining room. (n) doors facing east side yard & replace in-kind window @ westside. | $65,000 |
| Sep 2, 2020 | Completed final sign-off Jan 2021 | 70 Walter St | kitchen remodel: cabinets, appliances, plubmbing fixturs.Details
kitchen remodel: cabinets, appliances, plubmbing fixturs. | $119,000 |
| Aug 13, 2020 | Completed final sign-off Dec 2021 | 330 Roosevelt Wy | increase height of flat roof at rear of house over 2nd flr kitchen. area of proposed change is not visible from neighor's rera yards or from streetDetails
increase height of flat roof at rear of house over 2nd flr kitchen. area of proposed change is not visible from neighor's rera yards or from street | $25,000 |
| Jan 29, 2019 | Completed final sign-off May 2019 | 1830 Taylor St | kitchen counters, bathroom tile & vanity counter, tub replace with shower.Details
kitchen counters, bathroom tile & vanity counter, tub replace with shower. | $10,000 |
| Nov 21, 2014 | Completed final sign-off Aug 2019 | 1451 Shotwell St | bring building up to code as per condo inspection report. remove failing decks, basement & 1st & 2nd fl extension. rebuild extension & decks & convert lower unconditioned room into a bedroom/bath. remodel (e) kitchens & bathrooms.Details
bring building up to code as per condo inspection report. remove failing decks, basement & 1st & 2nd fl extension. rebuild extension & decks & convert lower unconditioned room into a bedroom/bath. remodel (e) kitchens & bathrooms. | $400,000 |
| Oct 17, 2014 | Completed final sign-off Feb 2022 | 1 Southern Heights Av | renovation of single family. remodel of living, family, baths & 2nd fl bedrooms. relocate kitchen & dining room to ground floor. addition of entry powder room. new interior stair. remodel 3rd fl master bedrm & bath. new office expansion @ 3r fl with new rear deck. new roof deck with stair penthouse.Details
renovation of single family. remodel of living, family, baths & 2nd fl bedrooms. relocate kitchen & dining room to ground floor. addition of entry powder room. new interior stair. remodel 3rd fl master bedrm & bath. new office expansion @ 3r fl with new rear deck. new roof deck with stair penthouse. | $296,099 |
| Feb 4, 2013 | Completed final sign-off Sep 2013 | 351 Prentiss St | remodel of a single family residence. conversion of (e) unconditioned space to (n) habitable sapce - remodeling of 1/f bathroom. conversion of rear addition into master bedroom at 1/f. remodel of 2/f kitchen & bathroom. addition of bedroom & study at 2/f. (n) foundation & dry-rot repair,Details
remodel of a single family residence. conversion of (e) unconditioned space to (n) habitable sapce - remodeling of 1/f bathroom. conversion of rear addition into master bedroom at 1/f. remodel of 2/f kitchen & bathroom. addition of bedroom & study at 2/f. (n) foundation & dry-rot repair, | $118,000 |
| Jan 6, 2012 | Completed final sign-off May 2012 | 132 Roosevelt Wy | renovation to existing kitchen. existing wall to be removed and replaced by new beams. new wahser & dryer to be installed. plywood sheathing to be added at garage level (voluntary seismic strengthening).Details
renovation to existing kitchen. existing wall to be removed and replaced by new beams. new wahser & dryer to be installed. plywood sheathing to be added at garage level (voluntary seismic strengthening). | $53,000 |
| Oct 13, 2010 | Completed final sign-off Aug 2011 | 133 09th Av | unit #133-interior remodel/structural upgrd, convert part of 1st fl garage to conditioned habitable space-new bedrm, bathrm, den, study. addition of new internal stairs between 1st & 2nd flrs, partial infill of (e) lightwell, remodel (e) kitchen, bathrm, powder rm, bedrms, closets & relocate (e) lauDetails
unit #133-interior remodel/structural upgrd, convert part of 1st fl garage to conditioned habitable space-new bedrm, bathrm, den, study. addition of new internal stairs between 1st & 2nd flrs, partial infill of (e) lightwell, remodel (e) kitchen, bathrm, powder rm, bedrms, closets & relocate (e) lau | $100,000 |
| Dec 3, 2009 | Completed final sign-off Oct 2010 | 1795 Sanchez St | interior remodel including replacement of 2nd floor bath & add 1 new full bathroom on 3rd floor, new stairs from 2nd floor to 1st floor. new kitchen - relocation of kitchen.Details
interior remodel including replacement of 2nd floor bath & add 1 new full bathroom on 3rd floor, new stairs from 2nd floor to 1st floor. new kitchen - relocation of kitchen. | $60,000 |
| Sep 24, 2009 | Completed final sign-off Dec 2010 | 1432 Valencia St | move bar across room. new plumbing and electric for new bar, add walk in cooler, new kitchen equipmentDetails
move bar across room. new plumbing and electric for new bar, add walk in cooler, new kitchen equipment | $25,000 |
| Feb 5, 2007 | Completed final sign-off Sep 2007 | 1849 Golden Gate Av | remodel unit #2- 1 kitchen, 1 bathroom, 2 bedrooms, install new exterior doors in rear, remodel unit #4 - 1 kitchenDetails
remodel unit #2- 1 kitchen, 1 bathroom, 2 bedrooms, install new exterior doors in rear, remodel unit #4 - 1 kitchen | $125,000 |