415 permits since 2000: 328 completed, 42 in progress, 35 never finaled, 10 expired or cancelled.
Of the 35 never-finaled permits, 1 is 3 to 5 years old, 23 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
17 stairs permits: 14 completed, 3 in progress. Typically 24 days from filing to permit and 390 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Jul 2026 | 181 Fremont St | installation of architectural, non-rated stair enclosure at existing architectural convenience/communicating stair on level 36. no changes in use, occupancy load, nor egress occupant load cabacity. no change to smoke control.Details
installation of architectural, non-rated stair enclosure at existing architectural convenience/communicating stair on level 36. no changes in use, occupancy load, nor egress occupant load cabacity. no change to smoke control. | $50,000 |
| Jul 1, 2026 | In progress issued Jul 2026 | 555 California St | revision to 202605221774 to include the removal of existing communicating stair between the 19th and 20th fl and infilling the restaurant 2fl openingDetails
revision to 202605221774 to include the removal of existing communicating stair between the 19th and 20th fl and infilling the restaurant 2fl opening | $100,000 |
| May 22, 2026 | In progress issued Sep 2026 | 181 Fremont St | demolition of portion of level 29 slab and portion of gaurdrail, demo of existing smoke curtain on level 30. installation of new stair, handrail and guardrail from level 28 to 29 and new rated enclosures on level 30 and 31Details
demolition of portion of level 29 slab and portion of gaurdrail, demo of existing smoke curtain on level 30. installation of new stair, handrail and guardrail from level 28 to 29 and new rated enclosures on level 30 and 31 | $1,300,000 |
| Apr 8, 2025 | Completed final sign-off Sep 2026 | 1270 Bush St | revision 202407196876- layout changes due to utlility needs to have a larger vault room. stair rotated structrual support revision to mech and electrialDetails
revision 202407196876- layout changes due to utlility needs to have a larger vault room. stair rotated structrual support revision to mech and electrial | |
| Mar 28, 2025 | Completed final sign-off Jun 2026 | 685 Market St | 1st & 2nd fl - interconnecting stair between levels 1-2; (n) gender neutral rr on ground floor, new ground floor janitor's closet & door to courtyard.Details
1st & 2nd fl - interconnecting stair between levels 1-2; (n) gender neutral rr on ground floor, new ground floor janitor's closet & door to courtyard. | $315,000 |
| Sep 26, 2024 | Completed final sign-off Feb 2025 | 181 Fremont St | 25th fl: construction of (n) millwork including minor non structural partitions. (e) acoustical grid, tile & gyp board ceilings. light fixtures and finishes to remain. no change in use and exit stairs. egress path elevators (deferred sprinklers, fire alarm & mep if needed)Details
25th fl: construction of (n) millwork including minor non structural partitions. (e) acoustical grid, tile & gyp board ceilings. light fixtures and finishes to remain. no change in use and exit stairs. egress path elevators (deferred sprinklers, fire alarm & mep if needed) | $188,000 |
| Sep 26, 2024 | Completed final sign-off Feb 2025 | 181 Fremont St | 28/f. construction of new meeting room including non str partition, acounstical grid ceiling panel light fixture, door and finishes. existing acounstcial grid tile and gyp board ceiling light fixtures and finishes to remain. no change in use, exit stair egress path, elevators (mep fire alarm sprinklDetails
28/f. construction of new meeting room including non str partition, acounstical grid ceiling panel light fixture, door and finishes. existing acounstcial grid tile and gyp board ceiling light fixtures and finishes to remain. no change in use, exit stair egress path, elevators (mep fire alarm sprinkl | $188,000 |
| Nov 20, 2023 | Completed final sign-off Oct 2024 | 181 Fremont St | 7th flr: construction of new non-structural partition, gyp. bd. gyp board ceiling. (1) light fixture added (1) plumbing fixtures to be relocated, finishes to include changes to the (e) hallway 701. mep deferred for future application. no change in exit stair or elevatorDetails
7th flr: construction of new non-structural partition, gyp. bd. gyp board ceiling. (1) light fixture added (1) plumbing fixtures to be relocated, finishes to include changes to the (e) hallway 701. mep deferred for future application. no change in exit stair or elevator | $175,000 |
| Feb 9, 2022 | Completed final sign-off Mar 2024 | 755 Sansome St | t.i new conference rooms, open office areas, demo feature stair including infill of slab. now work in restrooms, exit stairs and exiting breakroom. mep deferredDetails
t.i new conference rooms, open office areas, demo feature stair including infill of slab. now work in restrooms, exit stairs and exiting breakroom. mep deferred | $881,000 |
| Dec 4, 2020 | Completed final sign-off Jun 2022 | 201 Spear St | 13th fl: installation of card readers and two-way communication devices at at the 13th fl elevator lobby. installation of panic hardware at the doors of exit stairs.Details
13th fl: installation of card readers and two-way communication devices at at the 13th fl elevator lobby. installation of panic hardware at the doors of exit stairs. | $5,000 |
| Dec 4, 2020 | Completed final sign-off Jun 2022 | 201 Spear St | 3rd fl: installation of card readers and two-way communication devices at the elevator lobby. installation of panic hardware at the exist stairs doors.Details
3rd fl: installation of card readers and two-way communication devices at the elevator lobby. installation of panic hardware at the exist stairs doors. | $5,000 |
| May 18, 2018 | Completed final sign-off Mar 2019 | 1 Embarcadero Center | stair between 35 floor & 36 floor and removal of surrounding walls. (n) slab infill at 36 (n) ceiling at 35. mep life safety sprinklers alarms under sep permit no changes in occupancy, use or areaDetails
stair between 35 floor & 36 floor and removal of surrounding walls. (n) slab infill at 36 (n) ceiling at 35. mep life safety sprinklers alarms under sep permit no changes in occupancy, use or area | $190,000 |
| Mar 20, 2018 | Completed final sign-off Apr 2019 | 500 Howard St | demo e structural slab. new stair under separate permit. mep and fire under sep permitDetails
demo e structural slab. new stair under separate permit. mep and fire under sep permit | $25,000 |
| Feb 5, 2018 | Completed final sign-off Apr 2019 | 500 Howard St | 10th flr - ti at 500 howard st base bkd connection for arch tube steel "peaks" at the 10th flr stair is the mezzanine level. ref pa 201711214532 maher naDetails
10th flr - ti at 500 howard st base bkd connection for arch tube steel "peaks" at the 10th flr stair is the mezzanine level. ref pa 201711214532 maher na | $5,000 |
| Nov 21, 2017 | Completed final sign-off Sep 2019 | 500 Howard St | 10th flr: construction of non structural partitions, structural partitions. mezzanine, non-egres stairs, doors, frames, hardware, millwork, drywall, acoustic ceiling grid/tile, finishes, mech, elec, plumb, fire sprinkler & life saftey under deffered submittal. arch features under. separate permit.Details
10th flr: construction of non structural partitions, structural partitions. mezzanine, non-egres stairs, doors, frames, hardware, millwork, drywall, acoustic ceiling grid/tile, finishes, mech, elec, plumb, fire sprinkler & life saftey under deffered submittal. arch features under. separate permit. | $2,264,084 |
| Mar 28, 2017 | Completed final sign-off Feb 2018 | 625 02nd St | 3rd floor: ti- creating a fire rated opening between 275 brannan st and 625 2nd. adding a stair and wheel chair lift in 275 brannan. mep/fire/life safety under sep permit pre app ltr enclosed in permit dwgs ref 20170328 ref pa# 275 brannan 201703282516Details
3rd floor: ti- creating a fire rated opening between 275 brannan st and 625 2nd. adding a stair and wheel chair lift in 275 brannan. mep/fire/life safety under sep permit pre app ltr enclosed in permit dwgs ref 20170328 ref pa# 275 brannan 201703282516 | $10,000 |
| Mar 28, 2017 | Completed final sign-off Feb 2018 | 275 Brannan St | 2nd floor: ti- creating a fire rated opening between 275 brannan st and 625 2nd. adding a stair and wheel chair lift in 275 brannan. mep/fire/life safety under sep permit pre app ltr enclosed in permit dwgs ref 20170328 ref 625 2nd st pa# 201703282517Details
2nd floor: ti- creating a fire rated opening between 275 brannan st and 625 2nd. adding a stair and wheel chair lift in 275 brannan. mep/fire/life safety under sep permit pre app ltr enclosed in permit dwgs ref 20170328 ref 625 2nd st pa# 201703282517 | $240,000 |