Jason Liu Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Aug 2026
- Last 24 months
- 1 permit filed
86 permits since 2000: 79 completed, 1 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
15 stairs permits: 15 completed. Typically 15 days from filing to permit and 266 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2022 | Completed final sign-off Aug 2023 | 429 Colon Av | 2/f: remodel kitchen, hall bath and master bath. modify 3 steps at hallway and 4 steps at interior main stair b/t 1/f and 2/f. electrical upgrades at remodel areas. open up wall b/t kitchen and dining room.Details
2/f: remodel kitchen, hall bath and master bath. modify 3 steps at hallway and 4 steps at interior main stair b/t 1/f and 2/f. electrical upgrades at remodel areas. open up wall b/t kitchen and dining room. | $65,000 |
| Nov 30, 2021 | Completed final sign-off Sep 2022 | 279 15th Av | unit 279 (3rd fl): remodel (e) bathroom to full bathroom. remodel (e) toilet with new sink. replace stair door. replace (e) radiator heaters with new gas furnace.Details
unit 279 (3rd fl): remodel (e) bathroom to full bathroom. remodel (e) toilet with new sink. replace stair door. replace (e) radiator heaters with new gas furnace. | $25,000 |
| Sep 30, 2020 | Completed final sign-off Feb 2022 | 821 32nd Av | remodel kitchen & 2 bathrooms. replace all windows, roof. upgrade electrical. replace forced air furnace. modify exterior entry stair side walls. replace exterior stair risers/treads. install new exterior stair handrail.Details
remodel kitchen & 2 bathrooms. replace all windows, roof. upgrade electrical. replace forced air furnace. modify exterior entry stair side walls. replace exterior stair risers/treads. install new exterior stair handrail. | $280,000 |
| Feb 25, 2020 | Completed final sign-off Oct 2020 | 71 Inverness Dr | partial renovatio of lower level of 2 story seelling. replacemen tof stairs, bedroom, bath. current bedroom, bath unauthorized, installed by previous ownerDetails
partial renovatio of lower level of 2 story seelling. replacemen tof stairs, bedroom, bath. current bedroom, bath unauthorized, installed by previous owner | $65,000 |
| Oct 25, 2017 | Completed final sign-off Jul 2018 | 2563 16th Av | convert e 1st fl garage storage area into garage and living area. new stair to joint 1st and 2nd fl. new living area 1st fl to include 1 bdrm, 1.5 baths, family rm, laundry.Details
convert e 1st fl garage storage area into garage and living area. new stair to joint 1st and 2nd fl. new living area 1st fl to include 1 bdrm, 1.5 baths, family rm, laundry. | $120,000 |
| Oct 19, 2016 | Completed final sign-off Dec 2016 | 20 Upland Dr | repair the entrace stair case brices in-kind repair. less than 50%Details
repair the entrace stair case brices in-kind repair. less than 50% | $4,000 |
| Mar 9, 2015 | Completed final sign-off May 2019 | 749 19th Av | remodel (e) units incl demo&construction. unit 749:convert(e)basement for new living space, rear 2-story addition & new deck. for unit 753:4-story vertical addition w/ roof deck. relocate (e)light well, enlarge(e) garage door. new interior stair. part of interior work under separate permit.Details
remodel (e) units incl demo&construction. unit 749:convert(e)basement for new living space, rear 2-story addition & new deck. for unit 753:4-story vertical addition w/ roof deck. relocate (e)light well, enlarge(e) garage door. new interior stair. part of interior work under separate permit. | $99,999 |
| Aug 15, 2014 | Completed final sign-off Apr 2018 | 16 Agua Wy | 3rd story addition at rear south of house, add new stair at existing dining room.Details
3rd story addition at rear south of house, add new stair at existing dining room. | $105,000 |
| Aug 3, 2012 | Completed final sign-off Oct 2014 | 3719 16th St | remodel 2nd floor kitchen & bathrooms. remodel entire 1st flr into new master suite. new deck & stair in required rear yard (separate variance appl).Details
remodel 2nd floor kitchen & bathrooms. remodel entire 1st flr into new master suite. new deck & stair in required rear yard (separate variance appl). | $135,000 |
| Nov 25, 2009 | Completed final sign-off Jul 2010 | 20 Upland Dr | construct 1 new bath, remodel e kitchen on 2nd fl, relocate e interior stair, wh and furnace, new bedroom, legalize and remodel 1 e bath and add study room at ground fl, replace e retaining wall at gr flDetails
construct 1 new bath, remodel e kitchen on 2nd fl, relocate e interior stair, wh and furnace, new bedroom, legalize and remodel 1 e bath and add study room at ground fl, replace e retaining wall at gr fl | $50,000 |
| Oct 6, 2009 | Completed final sign-off Dec 2010 | 1455 28th Av | horizontal addition - 2 stories to rear yard approx 342 sq ft per floor. add stairs between floors; add 210 sq ft deck; new media room @ 1st floor; new family room @ 2nd floor.Details
horizontal addition - 2 stories to rear yard approx 342 sq ft per floor. add stairs between floors; add 210 sq ft deck; new media room @ 1st floor; new family room @ 2nd floor. | $88,000 |
| Nov 14, 2007 | Completed final sign-off Aug 2008 | 187 Idora Av | revision to appl #200603025793: reduction in work scope. 3rd floor previously permitted for 700+/- sf revised. 3rd floor plan less than 500 sf. minor revision in kitchen layout @ 2nd floor. stair layout between all floors. revised ext window locations.Details
revision to appl #200603025793: reduction in work scope. 3rd floor previously permitted for 700+/- sf revised. 3rd floor plan less than 500 sf. minor revision in kitchen layout @ 2nd floor. stair layout between all floors. revised ext window locations. | |
| Dec 6, 2006 | Completed final sign-off Oct 2007 | 1334 36th Av | add basement accessory rooms approx 758 sq. ft. new bath, laundry, bedroom & family room. remodel (e) kitchen on 2nd floor. cover entrance stair landing with roof & skylight. bolt foundations voluntarily. upgrade mech., electrical & plumbing as needed.Details
add basement accessory rooms approx 758 sq. ft. new bath, laundry, bedroom & family room. remodel (e) kitchen on 2nd floor. cover entrance stair landing with roof & skylight. bolt foundations voluntarily. upgrade mech., electrical & plumbing as needed. | $41,530 |
| Aug 3, 2006 | Completed final sign-off Jul 2007 | 181 De Soto St | add rooms at ground floor, add rear deck and stairs, remodel (e) kitchen and breakfast area on 2nd floor. replace (e) foundation.Details
add rooms at ground floor, add rear deck and stairs, remodel (e) kitchen and breakfast area on 2nd floor. replace (e) foundation. | $50,000 |
| May 8, 2000 | Completed final sign-off May 2000 | 1276 Jackson St | repair loose rear stair threads at the top portion of the rear stairsDetails
repair loose rear stair threads at the top portion of the rear stairs | $500 |