Back to bathroom remodel contractors
Jason Liu Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Aug 2026
- Last 24 months
- 1 permit filed
86 permits since 2000: 79 completed, 1 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
41 bathroom remodel permits: 40 completed, 1 in progress. Typically 1 days from filing to permit and 243 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 13, 2026 | In progress issued Aug 2026 | 2470 36th Av | to comply with complaint 202660627: remodel full bathroom ground floor, 2 rooms ground floor, replace 2 windows and 1 sliding door, existing opening, back of home, non street facing. replace gypsum board finishes on ceiling and wall cabinets in bathroom area. replace new tub like for like in bath.Details
to comply with complaint 202660627: remodel full bathroom ground floor, 2 rooms ground floor, replace 2 windows and 1 sliding door, existing opening, back of home, non street facing. replace gypsum board finishes on ceiling and wall cabinets in bathroom area. replace new tub like for like in bath. | $18,000 |
| Sep 29, 2022 | Completed final sign-off Aug 2023 | 429 Colon Av | 2/f: remodel kitchen, hall bath and master bath. modify 3 steps at hallway and 4 steps at interior main stair b/t 1/f and 2/f. electrical upgrades at remodel areas. open up wall b/t kitchen and dining room.Details
2/f: remodel kitchen, hall bath and master bath. modify 3 steps at hallway and 4 steps at interior main stair b/t 1/f and 2/f. electrical upgrades at remodel areas. open up wall b/t kitchen and dining room. | $65,000 |
| Jul 8, 2022 | Completed final sign-off Apr 2023 | 65 San Rafael Wy | 1st fl: remodel kitchen & breakfast room. open up kitchen to dining room. remove 2 glass block windows & replace 3 other windows. add 1 window. all at side elevation. remodel 1st fl bathroom & 2 2nd fl bathrooms. update electrical lighting & refinish all hardwood floors.Details
1st fl: remodel kitchen & breakfast room. open up kitchen to dining room. remove 2 glass block windows & replace 3 other windows. add 1 window. all at side elevation. remodel 1st fl bathroom & 2 2nd fl bathrooms. update electrical lighting & refinish all hardwood floors. | $164,000 |
| Jul 1, 2022 | Completed final sign-off Aug 2023 | 429 Colon Av | remodel (e) 1st fl bathroom. divide family room space to create a (n) home office area. new lighting/ electrical & remodel areas.Details
remodel (e) 1st fl bathroom. divide family room space to create a (n) home office area. new lighting/ electrical & remodel areas. | $24,000 |
| Nov 30, 2021 | Completed final sign-off Sep 2022 | 279 15th Av | unit 279 (3rd fl): remodel (e) bathroom to full bathroom. remodel (e) toilet with new sink. replace stair door. replace (e) radiator heaters with new gas furnace.Details
unit 279 (3rd fl): remodel (e) bathroom to full bathroom. remodel (e) toilet with new sink. replace stair door. replace (e) radiator heaters with new gas furnace. | $25,000 |
| Nov 24, 2020 | Completed final sign-off Dec 2021 | 4832 California St | home renovaton to include remodel to upper unit for better flow and open floor plan of main spaces with remodel of kitchen, bathroom, and laundry room.Details
home renovaton to include remodel to upper unit for better flow and open floor plan of main spaces with remodel of kitchen, bathroom, and laundry room. | $75,000 |
| Sep 30, 2020 | Completed final sign-off Feb 2022 | 821 32nd Av | remodel kitchen & 2 bathrooms. replace all windows, roof. upgrade electrical. replace forced air furnace. modify exterior entry stair side walls. replace exterior stair risers/treads. install new exterior stair handrail.Details
remodel kitchen & 2 bathrooms. replace all windows, roof. upgrade electrical. replace forced air furnace. modify exterior entry stair side walls. replace exterior stair risers/treads. install new exterior stair handrail. | $280,000 |
| Feb 25, 2020 | Completed final sign-off Oct 2020 | 71 Inverness Dr | partial renovatio of lower level of 2 story seelling. replacemen tof stairs, bedroom, bath. current bedroom, bath unauthorized, installed by previous ownerDetails
partial renovatio of lower level of 2 story seelling. replacemen tof stairs, bedroom, bath. current bedroom, bath unauthorized, installed by previous owner | $65,000 |
| Nov 5, 2019 | Completed final sign-off Aug 2021 | 2626 Clement St | remodel & expand (e) guestroom with kitchen unit to full dwelling unit w/ (n) bedrooms, full bathrooms & kitchen. restore (e) lighwell.Details
remodel & expand (e) guestroom with kitchen unit to full dwelling unit w/ (n) bedrooms, full bathrooms & kitchen. restore (e) lighwell. | $80,000 |
| Aug 1, 2019 | Completed final sign-off Oct 2021 | 47 Newburg St | remodel e basement to include new bath, media room, storage. enclose e tunnel entrance and make interior hall w closet. remove 2nd fl tunnel entry walls and oor. replace 3 skylights, remodel kitchen and bath 2nd fl. add 1 powder rmDetails
remodel e basement to include new bath, media room, storage. enclose e tunnel entrance and make interior hall w closet. remove 2nd fl tunnel entry walls and oor. replace 3 skylights, remodel kitchen and bath 2nd fl. add 1 powder rm | $220,000 |
| Mar 8, 2018 | Completed final sign-off May 2019 | 4840 California St | revision to app#201711305150. infill extg lightwells at 2nd floor adding 33 sq ft of new conditioned space. build out at 1st floor full bath and powder room.Details
revision to app#201711305150. infill extg lightwells at 2nd floor adding 33 sq ft of new conditioned space. build out at 1st floor full bath and powder room. | $120,000 |
| Nov 30, 2017 | Completed final sign-off May 2019 | 4840 California St | voluntary structural strengthening, repair substandard framing and dry rot unconditioned. repair existing sun room at rear in kind. interior remodel including kitchen and bathrooms. add new skylights. windows at front ot be in-kind replacement wd to wd w/individual lites per google jan 2017 photo.Details
voluntary structural strengthening, repair substandard framing and dry rot unconditioned. repair existing sun room at rear in kind. interior remodel including kitchen and bathrooms. add new skylights. windows at front ot be in-kind replacement wd to wd w/individual lites per google jan 2017 photo. | $250,000 |
| Oct 25, 2017 | Completed final sign-off Jul 2018 | 2563 16th Av | convert e 1st fl garage storage area into garage and living area. new stair to joint 1st and 2nd fl. new living area 1st fl to include 1 bdrm, 1.5 baths, family rm, laundry.Details
convert e 1st fl garage storage area into garage and living area. new stair to joint 1st and 2nd fl. new living area 1st fl to include 1 bdrm, 1.5 baths, family rm, laundry. | $120,000 |
| Feb 10, 2016 | Completed final sign-off Nov 2016 | 87 Clearfield Dr | remodel one (e) bath, family and 2 bedrooms on g/f; remodel (e) kitchen and add one (n) bath on 2/f. remove unpermitted existing rear deck at the back.Details
remodel one (e) bath, family and 2 bedrooms on g/f; remodel (e) kitchen and add one (n) bath on 2/f. remove unpermitted existing rear deck at the back. | $45,000 |
| Dec 24, 2014 | Completed final sign-off Sep 2015 | 950 Madrid St | revision to appl #2014.0909.5864 for remodeling existing kitchen & bathroom. add one new bathroom & upgate existing electrical on 2nd floor.Details
revision to appl #2014.0909.5864 for remodeling existing kitchen & bathroom. add one new bathroom & upgate existing electrical on 2nd floor. | $10,000 |
| Nov 3, 2014 | Completed final sign-off Jan 2015 | 4 Farallones St | to comply w/complaint #201499121 - legalize (e) one bedroom, bath, den & two storage rooms on ground floor. unit legalization per ordinance 43-14.Details
to comply w/complaint #201499121 - legalize (e) one bedroom, bath, den & two storage rooms on ground floor. unit legalization per ordinance 43-14. | $25,000 |
| Sep 9, 2014 | Completed final sign-off Sep 2015 | 950 Madrid St | replace cabinet, counter top, sink for extg kitchen. remodel one extg bathroom on 2nd floor.Details
replace cabinet, counter top, sink for extg kitchen. remodel one extg bathroom on 2nd floor. | $15,000 |
| Jun 2, 2014 | Completed final sign-off Oct 2014 | 2628 Clement St | remodel existing kitchen, add one new bathroom & add new laundry area on 2nd floor.Details
remodel existing kitchen, add one new bathroom & add new laundry area on 2nd floor. | $10,000 |
| Sep 19, 2013 | Completed final sign-off Dec 2013 | 71 Inverness Dr | in kitchen replace cabinets, and counter top at upper level with same layout, lighting work to comply with cec 150,148 ^ 150 (k) bathroom replace tiles, toilet,shower,vanity at upper level with same layout.Details
in kitchen replace cabinets, and counter top at upper level with same layout, lighting work to comply with cec 150,148 ^ 150 (k) bathroom replace tiles, toilet,shower,vanity at upper level with same layout. | $12,000 |
| Jun 7, 2013 | Completed final sign-off Aug 2013 | 2470 36th Av | replace kitchen counter top & cabinets, replace bathroom tiles & toilet.Details
replace kitchen counter top & cabinets, replace bathroom tiles & toilet. | $15,000 |
| Apr 12, 2013 | Completed final sign-off Feb 2014 | 1235 26th Av | interior remodel of both floors:new master bedroom suite at upper level, and new bedrooms and bath at lower level.Details
interior remodel of both floors:new master bedroom suite at upper level, and new bedrooms and bath at lower level. | $95,000 |
| Oct 17, 2012 | Completed final sign-off Mar 2013 | 418 40th Av | remodel two bathrooms and replace kitchen cabinets on second floor.Details
remodel two bathrooms and replace kitchen cabinets on second floor. | $15,000 |
| Oct 16, 2012 | Completed final sign-off Jul 2013 | 2733 Santiago St | add 1 new bathroom, master bedroom & new powder room on ground floor. remodel (e) social room on ground floorDetails
add 1 new bathroom, master bedroom & new powder room on ground floor. remodel (e) social room on ground floor | $28,000 |
| Aug 3, 2012 | Completed final sign-off Oct 2014 | 3719 16th St | remodel 2nd floor kitchen & bathrooms. remodel entire 1st flr into new master suite. new deck & stair in required rear yard (separate variance appl).Details
remodel 2nd floor kitchen & bathrooms. remodel entire 1st flr into new master suite. new deck & stair in required rear yard (separate variance appl). | $135,000 |
| Jul 13, 2011 | Completed final sign-off Apr 2012 | 519 25th Av | construct 1 new bedroom, 1 bath, 1 family room on gr fl. remodel e kitchen and e bath on 2nd fl, replace e water heater and furnace, upgrade e rear partial foundationDetails
construct 1 new bedroom, 1 bath, 1 family room on gr fl. remodel e kitchen and e bath on 2nd fl, replace e water heater and furnace, upgrade e rear partial foundation | $50,000 |
| Nov 18, 2010 | Completed final sign-off Mar 2011 | 38 Encline Ct | remodel (e) bathroom & (e) kitchen on 2nd floor, no new walls. provide min of 50% of kitchen lights per wattage in high efficacy lightsDetails
remodel (e) bathroom & (e) kitchen on 2nd floor, no new walls. provide min of 50% of kitchen lights per wattage in high efficacy lights | $29,916 |
| Feb 1, 2010 | Completed final sign-off Dec 2010 | 263 Lakeshore Dr | construct two (n) bedrooms, 1-(n) bath & 1-(n) laundry rm. on ground flr. replace (e) w/h & (e) furnace. remodel (e) bath & (e) kitchen on 2nd. flr. construct (n) deck at rear. install (n) recessed lights fixtures at living & dining.Details
construct two (n) bedrooms, 1-(n) bath & 1-(n) laundry rm. on ground flr. replace (e) w/h & (e) furnace. remodel (e) bath & (e) kitchen on 2nd. flr. construct (n) deck at rear. install (n) recessed lights fixtures at living & dining. | $60,000 |
| Nov 25, 2009 | Completed final sign-off Jul 2010 | 20 Upland Dr | construct 1 new bath, remodel e kitchen on 2nd fl, relocate e interior stair, wh and furnace, new bedroom, legalize and remodel 1 e bath and add study room at ground fl, replace e retaining wall at gr flDetails
construct 1 new bath, remodel e kitchen on 2nd fl, relocate e interior stair, wh and furnace, new bedroom, legalize and remodel 1 e bath and add study room at ground fl, replace e retaining wall at gr fl | $50,000 |
| Dec 22, 2008 | Completed final sign-off Feb 2009 | 16 Agua Wy | revision to 200810244997. remodel e bath, remove e tub and sink, relocate showr stall and closetDetails
revision to 200810244997. remodel e bath, remove e tub and sink, relocate showr stall and closet | $1,500 |
| Oct 24, 2008 | Completed final sign-off Feb 2009 | 16 Agua Wy | 2nd floor kitchen remodel. extg windws at kitchen to be replaced. extg wndw at breakfast room to be removed. new skylight to be installed in kitchen. remodel extg bathroom. remove walls between kitchen and dinning room and install beam and posts.Details
2nd floor kitchen remodel. extg windws at kitchen to be replaced. extg wndw at breakfast room to be removed. new skylight to be installed in kitchen. remodel extg bathroom. remove walls between kitchen and dinning room and install beam and posts. | $50,000 |
| Jan 9, 2007 | Completed final sign-off Aug 2007 | 210 Moffitt St | remodel existing kitchen and two bathrooms, replce some windows & doors windows not visible from street, windows u factor =0.42Details
remodel existing kitchen and two bathrooms, replce some windows & doors windows not visible from street, windows u factor =0.42 | $16,000 |
| Dec 6, 2006 | Completed final sign-off Oct 2007 | 1334 36th Av | add basement accessory rooms approx 758 sq. ft. new bath, laundry, bedroom & family room. remodel (e) kitchen on 2nd floor. cover entrance stair landing with roof & skylight. bolt foundations voluntarily. upgrade mech., electrical & plumbing as needed.Details
add basement accessory rooms approx 758 sq. ft. new bath, laundry, bedroom & family room. remodel (e) kitchen on 2nd floor. cover entrance stair landing with roof & skylight. bolt foundations voluntarily. upgrade mech., electrical & plumbing as needed. | $41,530 |
| Aug 1, 2005 | Completed final sign-off Mar 2006 | 25 Pinehurst Wy | remodel (e) bathroom drywall. tiles vanity faucet. shower pan. bathtub, toilet.Details
remodel (e) bathroom drywall. tiles vanity faucet. shower pan. bathtub, toilet. | $12,000 |
| May 11, 2005 | Completed final sign-off Nov 2005 | 21 Yerba Buena Av | remodel exisitng (1) bathroom drywall, tiles, vanity, faucet, shower panDetails
remodel exisitng (1) bathroom drywall, tiles, vanity, faucet, shower pan | $7,000 |
| Oct 6, 2003 | Completed final sign-off Jan 2004 | 1234 Jackson St | remove kitchen cooking,sink,counter,cupboards. remove full bath,shower,toilet,sink.and convert toDetails
remove kitchen cooking,sink,counter,cupboards. remove full bath,shower,toilet,sink.and convert to | $3,000 |
| Nov 20, 2001 | Completed final sign-off Jul 2002 | 2046 23rd Av | add one bath room & one family room at ground floor areaDetails
add one bath room & one family room at ground floor area | $10,000 |
| Jul 3, 2000 | Completed final sign-off Jan 2001 | 1495 40th Av | construct-one bedroom, bath, family room, walk-in closet at ground fl areaDetails
construct-one bedroom, bath, family room, walk-in closet at ground fl area | $10,000 |
| Jun 22, 2000 | Completed final sign-off Jul 2000 | 1 Winston Dr | replace kitchen & bath & bedroom 15 windowsDetails
replace kitchen & bath & bedroom 15 windows | $3,000 |
| Jun 22, 2000 | Completed final sign-off Jan 2001 | 1495 40th Av | remodel bath & kitchen, drywall,tiles,vanity, tiolet,cabinets, sink,countertopDetails
remodel bath & kitchen, drywall,tiles,vanity, tiolet,cabinets, sink,countertop | $9,000 |
| May 8, 2000 | Completed final sign-off Jul 2000 | 1 Winston Dr | kitchen and 2 bathroom remodelingDetails
kitchen and 2 bathroom remodeling | $9,000 |
| Mar 3, 2000 | Completed final sign-off May 2000 | 187 Idora Av | proposed to construct 1 bedroom, 1 study room & 1 bathroom at ground floor area.Details
proposed to construct 1 bedroom, 1 study room & 1 bathroom at ground floor area. | $12,000 |