Back to kitchen remodel contractors
Jason Liu Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Aug 2026
- Last 24 months
- 1 permit filed
86 permits since 2000: 79 completed, 1 in progress, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
30 kitchen remodel permits: 30 completed. Typically 0 days from filing to permit and 246 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2022 | Completed final sign-off Aug 2023 | 429 Colon Av | 2/f: remodel kitchen, hall bath and master bath. modify 3 steps at hallway and 4 steps at interior main stair b/t 1/f and 2/f. electrical upgrades at remodel areas. open up wall b/t kitchen and dining room.Details
2/f: remodel kitchen, hall bath and master bath. modify 3 steps at hallway and 4 steps at interior main stair b/t 1/f and 2/f. electrical upgrades at remodel areas. open up wall b/t kitchen and dining room. | $65,000 |
| Jul 8, 2022 | Completed final sign-off Apr 2023 | 65 San Rafael Wy | 1st fl: remodel kitchen & breakfast room. open up kitchen to dining room. remove 2 glass block windows & replace 3 other windows. add 1 window. all at side elevation. remodel 1st fl bathroom & 2 2nd fl bathrooms. update electrical lighting & refinish all hardwood floors.Details
1st fl: remodel kitchen & breakfast room. open up kitchen to dining room. remove 2 glass block windows & replace 3 other windows. add 1 window. all at side elevation. remodel 1st fl bathroom & 2 2nd fl bathrooms. update electrical lighting & refinish all hardwood floors. | $164,000 |
| Nov 24, 2020 | Completed final sign-off Dec 2021 | 4832 California St | home renovaton to include remodel to upper unit for better flow and open floor plan of main spaces with remodel of kitchen, bathroom, and laundry room.Details
home renovaton to include remodel to upper unit for better flow and open floor plan of main spaces with remodel of kitchen, bathroom, and laundry room. | $75,000 |
| Sep 30, 2020 | Completed final sign-off Feb 2022 | 821 32nd Av | remodel kitchen & 2 bathrooms. replace all windows, roof. upgrade electrical. replace forced air furnace. modify exterior entry stair side walls. replace exterior stair risers/treads. install new exterior stair handrail.Details
remodel kitchen & 2 bathrooms. replace all windows, roof. upgrade electrical. replace forced air furnace. modify exterior entry stair side walls. replace exterior stair risers/treads. install new exterior stair handrail. | $280,000 |
| Nov 5, 2019 | Completed final sign-off Aug 2021 | 2626 Clement St | remodel & expand (e) guestroom with kitchen unit to full dwelling unit w/ (n) bedrooms, full bathrooms & kitchen. restore (e) lighwell.Details
remodel & expand (e) guestroom with kitchen unit to full dwelling unit w/ (n) bedrooms, full bathrooms & kitchen. restore (e) lighwell. | $80,000 |
| Aug 1, 2019 | Completed final sign-off Oct 2021 | 47 Newburg St | remodel e basement to include new bath, media room, storage. enclose e tunnel entrance and make interior hall w closet. remove 2nd fl tunnel entry walls and oor. replace 3 skylights, remodel kitchen and bath 2nd fl. add 1 powder rmDetails
remodel e basement to include new bath, media room, storage. enclose e tunnel entrance and make interior hall w closet. remove 2nd fl tunnel entry walls and oor. replace 3 skylights, remodel kitchen and bath 2nd fl. add 1 powder rm | $220,000 |
| Nov 30, 2017 | Completed final sign-off May 2019 | 4840 California St | voluntary structural strengthening, repair substandard framing and dry rot unconditioned. repair existing sun room at rear in kind. interior remodel including kitchen and bathrooms. add new skylights. windows at front ot be in-kind replacement wd to wd w/individual lites per google jan 2017 photo.Details
voluntary structural strengthening, repair substandard framing and dry rot unconditioned. repair existing sun room at rear in kind. interior remodel including kitchen and bathrooms. add new skylights. windows at front ot be in-kind replacement wd to wd w/individual lites per google jan 2017 photo. | $250,000 |
| Feb 10, 2016 | Completed final sign-off Nov 2016 | 87 Clearfield Dr | remodel one (e) bath, family and 2 bedrooms on g/f; remodel (e) kitchen and add one (n) bath on 2/f. remove unpermitted existing rear deck at the back.Details
remodel one (e) bath, family and 2 bedrooms on g/f; remodel (e) kitchen and add one (n) bath on 2/f. remove unpermitted existing rear deck at the back. | $45,000 |
| Dec 24, 2014 | Completed final sign-off Sep 2015 | 950 Madrid St | revision to appl #2014.0909.5864 for remodeling existing kitchen & bathroom. add one new bathroom & upgate existing electrical on 2nd floor.Details
revision to appl #2014.0909.5864 for remodeling existing kitchen & bathroom. add one new bathroom & upgate existing electrical on 2nd floor. | $10,000 |
| Sep 9, 2014 | Completed final sign-off Sep 2015 | 950 Madrid St | replace cabinet, counter top, sink for extg kitchen. remodel one extg bathroom on 2nd floor.Details
replace cabinet, counter top, sink for extg kitchen. remodel one extg bathroom on 2nd floor. | $15,000 |
| Jun 2, 2014 | Completed final sign-off Oct 2014 | 2628 Clement St | remodel existing kitchen, add one new bathroom & add new laundry area on 2nd floor.Details
remodel existing kitchen, add one new bathroom & add new laundry area on 2nd floor. | $10,000 |
| Sep 19, 2013 | Completed final sign-off Dec 2013 | 71 Inverness Dr | in kitchen replace cabinets, and counter top at upper level with same layout, lighting work to comply with cec 150,148 ^ 150 (k) bathroom replace tiles, toilet,shower,vanity at upper level with same layout.Details
in kitchen replace cabinets, and counter top at upper level with same layout, lighting work to comply with cec 150,148 ^ 150 (k) bathroom replace tiles, toilet,shower,vanity at upper level with same layout. | $12,000 |
| Jun 7, 2013 | Completed final sign-off Aug 2013 | 2470 36th Av | replace kitchen counter top & cabinets, replace bathroom tiles & toilet.Details
replace kitchen counter top & cabinets, replace bathroom tiles & toilet. | $15,000 |
| Oct 17, 2012 | Completed final sign-off Mar 2013 | 418 40th Av | remodel two bathrooms and replace kitchen cabinets on second floor.Details
remodel two bathrooms and replace kitchen cabinets on second floor. | $15,000 |
| Aug 3, 2012 | Completed final sign-off Oct 2014 | 3719 16th St | remodel 2nd floor kitchen & bathrooms. remodel entire 1st flr into new master suite. new deck & stair in required rear yard (separate variance appl).Details
remodel 2nd floor kitchen & bathrooms. remodel entire 1st flr into new master suite. new deck & stair in required rear yard (separate variance appl). | $135,000 |
| Jul 13, 2011 | Completed final sign-off Apr 2012 | 519 25th Av | construct 1 new bedroom, 1 bath, 1 family room on gr fl. remodel e kitchen and e bath on 2nd fl, replace e water heater and furnace, upgrade e rear partial foundationDetails
construct 1 new bedroom, 1 bath, 1 family room on gr fl. remodel e kitchen and e bath on 2nd fl, replace e water heater and furnace, upgrade e rear partial foundation | $50,000 |
| Nov 18, 2010 | Completed final sign-off Mar 2011 | 38 Encline Ct | remodel (e) bathroom & (e) kitchen on 2nd floor, no new walls. provide min of 50% of kitchen lights per wattage in high efficacy lightsDetails
remodel (e) bathroom & (e) kitchen on 2nd floor, no new walls. provide min of 50% of kitchen lights per wattage in high efficacy lights | $29,916 |
| Feb 1, 2010 | Completed final sign-off Dec 2010 | 263 Lakeshore Dr | construct two (n) bedrooms, 1-(n) bath & 1-(n) laundry rm. on ground flr. replace (e) w/h & (e) furnace. remodel (e) bath & (e) kitchen on 2nd. flr. construct (n) deck at rear. install (n) recessed lights fixtures at living & dining.Details
construct two (n) bedrooms, 1-(n) bath & 1-(n) laundry rm. on ground flr. replace (e) w/h & (e) furnace. remodel (e) bath & (e) kitchen on 2nd. flr. construct (n) deck at rear. install (n) recessed lights fixtures at living & dining. | $60,000 |
| Nov 25, 2009 | Completed final sign-off Jul 2010 | 20 Upland Dr | construct 1 new bath, remodel e kitchen on 2nd fl, relocate e interior stair, wh and furnace, new bedroom, legalize and remodel 1 e bath and add study room at ground fl, replace e retaining wall at gr flDetails
construct 1 new bath, remodel e kitchen on 2nd fl, relocate e interior stair, wh and furnace, new bedroom, legalize and remodel 1 e bath and add study room at ground fl, replace e retaining wall at gr fl | $50,000 |
| Jul 3, 2009 | Completed final sign-off Jul 2009 | 71 Christopher Dr | remodel existing kitchen, cabinets,countertops, floor. windows replacement (10) front & back, left & right.Details
remodel existing kitchen, cabinets,countertops, floor. windows replacement (10) front & back, left & right. | $7,500 |
| Oct 24, 2008 | Completed final sign-off Feb 2009 | 16 Agua Wy | 2nd floor kitchen remodel. extg windws at kitchen to be replaced. extg wndw at breakfast room to be removed. new skylight to be installed in kitchen. remodel extg bathroom. remove walls between kitchen and dinning room and install beam and posts.Details
2nd floor kitchen remodel. extg windws at kitchen to be replaced. extg wndw at breakfast room to be removed. new skylight to be installed in kitchen. remodel extg bathroom. remove walls between kitchen and dinning room and install beam and posts. | $50,000 |
| Nov 14, 2007 | Completed final sign-off Aug 2008 | 187 Idora Av | revision to appl #200603025793: reduction in work scope. 3rd floor previously permitted for 700+/- sf revised. 3rd floor plan less than 500 sf. minor revision in kitchen layout @ 2nd floor. stair layout between all floors. revised ext window locations.Details
revision to appl #200603025793: reduction in work scope. 3rd floor previously permitted for 700+/- sf revised. 3rd floor plan less than 500 sf. minor revision in kitchen layout @ 2nd floor. stair layout between all floors. revised ext window locations. | |
| Jan 9, 2007 | Completed final sign-off Aug 2007 | 210 Moffitt St | remodel existing kitchen and two bathrooms, replce some windows & doors windows not visible from street, windows u factor =0.42Details
remodel existing kitchen and two bathrooms, replce some windows & doors windows not visible from street, windows u factor =0.42 | $16,000 |
| Dec 6, 2006 | Completed final sign-off Oct 2007 | 1334 36th Av | add basement accessory rooms approx 758 sq. ft. new bath, laundry, bedroom & family room. remodel (e) kitchen on 2nd floor. cover entrance stair landing with roof & skylight. bolt foundations voluntarily. upgrade mech., electrical & plumbing as needed.Details
add basement accessory rooms approx 758 sq. ft. new bath, laundry, bedroom & family room. remodel (e) kitchen on 2nd floor. cover entrance stair landing with roof & skylight. bolt foundations voluntarily. upgrade mech., electrical & plumbing as needed. | $41,530 |
| Aug 3, 2006 | Completed final sign-off Jul 2007 | 181 De Soto St | add rooms at ground floor, add rear deck and stairs, remodel (e) kitchen and breakfast area on 2nd floor. replace (e) foundation.Details
add rooms at ground floor, add rear deck and stairs, remodel (e) kitchen and breakfast area on 2nd floor. replace (e) foundation. | $50,000 |
| Oct 6, 2003 | Completed final sign-off Jan 2004 | 1234 Jackson St | remove kitchen cooking,sink,counter,cupboards. remove full bath,shower,toilet,sink.and convert toDetails
remove kitchen cooking,sink,counter,cupboards. remove full bath,shower,toilet,sink.and convert to | $3,000 |
| Apr 1, 2003 | Completed final sign-off Apr 2003 | 20 Santa Ana Av | remodel kitchen entire new sink, counter, cabinet, sheetrockDetails
remodel kitchen entire new sink, counter, cabinet, sheetrock | $12,000 |
| Jun 22, 2000 | Completed final sign-off Jan 2001 | 1495 40th Av | remodel bath & kitchen, drywall,tiles,vanity, tiolet,cabinets, sink,countertopDetails
remodel bath & kitchen, drywall,tiles,vanity, tiolet,cabinets, sink,countertop | $9,000 |
| Jun 22, 2000 | Completed final sign-off Jul 2000 | 1 Winston Dr | replace kitchen & bath & bedroom 15 windowsDetails
replace kitchen & bath & bedroom 15 windows | $3,000 |
| May 8, 2000 | Completed final sign-off Jul 2000 | 1 Winston Dr | kitchen and 2 bathroom remodelingDetails
kitchen and 2 bathroom remodeling | $9,000 |